| Plan Review Stops For Permit 19080673 |
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
1 |
Status |
N |
Date |
2019-09-16 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2019-09-16 |
Time |
06:08 |
Rev Time |
|
| Received By |
jwitmer |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2019-10-01 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2019-10-01 |
Time |
08:35 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2019-09-16 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2019-09-16 |
Time |
06:09 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2019-09-16 |
Time |
05:45 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2019-09-13 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2019-09-13 |
Time |
14:44 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2019-09-13 |
Time |
14:44 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2019-10-07 |
|
|
Cont ID |
|
| Sent By |
fstal |
Date |
2019-10-07 |
Time |
|
Rev Time |
0.00 |
| Received By |
fstal |
Date |
2019-10-07 |
Time |
|
Sent To |
|
|
| Notes |
| 2019-10-07 16:28:15 | PERMIT# 19080673 DIGITAL PASS | | | NFPA 1-1.14.4, 2012 EDITION: REVIEW AND APPROVAL BY THE | | | AHJ SHALL NOT RELIEVE THE APPLICANT OF THE | | | RESPONSIBILITY OF COMPLIANCE WITH THIS CODE. 1.14.5 | | | WHEN REQUIRED BY THE AHJ, REVISED CONSTRUCTION | | | DOCUMENTS OR SHOP DRAWINGS SHALL BE PREPARED AND | | | SUBMITTED FOR REVIEW AND APPROVAL TO ILLUSTRATE | | | CORRECTIONS OR MODIFICATIONS NECESSITATED BY FIELD | | | CONDITIONS OR OTHER REVISIONS TO APPROVED PLANS. | | | | | | FRANK STALLWORTH FIRE SAFETY INSPECTOR I | | | WEST PALM BEACH FIRE DEAPRTMENT. | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2019-08-23 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2019-08-23 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2019-08-23 |
Time |
12:33 |
Sent To |
|
|
| Notes |
| 2019-08-23 12:38:04 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | | INSPECTION. | | | | | | | | | 1) SHEET E 201 - THERE IS AN INDICATION OF FIRE ALARM | | | DEVICE RELOCATIONS. | | | | | | ANY FIRE ALARM WORK SHALL BE DONE UNDER SEPARATE PERMIT | | | AND SHOP DRAWINGS, | | | | | | | | | | | | 2) SHEET A 02 - THE INSTALLATION OF THE LARGE PROJECTOR | | | MAY OBSTRUCT FIRE SPRINKER HEADS SPARY PATTERNS. | | | | | | PLEASE REVIEW WITH FIRE SPRINKLER CONTRACTOR FOR CODE | | | COMPLIANT COVERAGE. | | | | | | ANY REQUIRED WORK ON THE FIRE SPRINKLER SYSTEM SHALL BE | | | DONE UNDER SEPARATE PERMIT AND SHOP DRAWINGS. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2019-10-09 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2019-10-09 |
Time |
06:07 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2019-09-26 |
Time |
08:05 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2019-09-16 |
Time |
|
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2019-08-21 |
Time |
08:27 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2019-09-16 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2019-09-16 |
Time |
07:55 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2019-09-16 |
Time |
07:55 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
N |
Date |
2019-09-06 |
|
|
Cont ID |
|
| Sent By |
thunt |
Date |
2019-09-06 |
Time |
07:51 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-09-06 |
Time |
07:51 |
Sent To |
|
|
| Notes |
| 2019-09-06 07:52:00 | REVIEWED BY T HUNT. NO PLUMBING WORK SHOWN ON THE | | | PLANS. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2019-10-01 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2019-10-01 |
Time |
08:22 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2019-10-01 |
Time |
08:22 |
Sent To |
|
|
| Notes |
| 2019-10-01 08:22:42 | SIGNATURES SHOW AS INVALID IN ADOBE, BUT VALID IN PDF | | | XCHANGE EDITOR. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2019-09-13 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2019-09-13 |
Time |
14:40 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2019-09-13 |
Time |
14:39 |
Sent To |
|
|
| Notes |
| 2019-09-13 14:39:24 | PER THE WPB AMENDMENTS TO THE FBC, EACH SHEET OF PLAN | | | IS REQUIRED TO BE SIGNED AND SEALED BY THE PERSON | | | RESPONSIBLE FOR THE DESIGN. A DIGITAL PLAN REQUIRES A | | | DIGITAL SIGNATURE WITH THE PROPER THIRD PARTY | | | VERIFICATION. SELF-CERTIFICATION IS NOT ACCEPTABLE FOR | | | ENGINEERS. PROVIDE CORRECTION. WPB FBC 107.1; FS | | | 471/481 |
|
|