| 2019-08-13 15:35:27 | 08/13/2019 1ST GAS REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. CITY RECORDS SHOW AN EXISTING GAS RANGE AND ALSO A |
| | DRYER ON THE GAS SYSTEM. THE BTU LOAD OF THE EXISTING |
| | GAS SYSTEM MUST BE ADDED INTO THE TOTAL BTU LOAD ON THE |
| | SYSTEM TO ENSURE THE EXISTING SYSTEM IS PROPERLY SIZED. |
| | IF UNDERSIZED, THE EXISTING SYSTEM MUST BE REDONE TO |
| | ENSURE A SAFE OPERATING SYSTEM. SUBMIT A GAS PIPING |
| | RISER DIAGRAM THAT SHOWS THE TYPE OF EXISTING |
| | APPLIANCE, THE BTU LOAD OF EACH APPLIANCE, THE PIPE |
| | SIZE AND TYPE OF PIPE TO EACH APPLIANCE, AND THE |
| | DISTANCE OF THE LONGEST LENGTH OF PIPING FROM THE POINT |
| | OF DELIVERY TO THE MOST REMOTE OUTLET AND THE LOAD OF |
| | THE SECTION. NOTE: IF THE EXISTING SYSTEM IS LESS THAN |
| | A 2 PSI SYSTEM AND THE SYSTEM PRESSURE IS INCREASED TO |
| | 2 PSI, A LINE PRESSURE REGULATOR IS REQUIRED AT ALL THE |
| | EXISTING APPLIANCES, 2017 FBC RES. SECS. G2412.4, |
| | G2412.8, G2413.1, G2413.2, G2413.3. |
| | |
| | 2. A REGULATOR IS REQUIRED TO BRING THE SYSTEM DOWN TO |
| | 10.5 WC. PLEASE SUBMIT MANUFACTURER?S SPECIFICATIONS |
| | FOR THE PRESSURE REGULATORS. REGULATORS INSTALLED ON |
| | THE EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR |
| | OUTDOOR INSTALLATION PER THE 2017 FBC RES. SEC. |
| | G2421.1. |
| | |
| | 3. GAS RISER DIAGRAM REQUIRED AND PLEASE SHOW ALL |
| | APPLIANCES, VALVES, DRIP LEG AND UNIONS PER WPB |
| | AMENDMENTS TO THE FBC SEC. 107.3.5.3 (12) RESIDENTIAL |
| | GAS |
| | |
| | 4. SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE |
| | LOCATION OF THE TANKLESS WATER HEATER AND THE LOCATION |
| | AND DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN |
| | RELATION TO THE WATER HEATER. THE LOCATION OF THE WATER |
| | HEATER SHALL COMPLY WITH THE MANUFACTURER'S |
| | INSTALLATION INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND |
| | DRAWN. WPB AMENDMENTS TO THE FBC SEC. 107.2.1. |
| | INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | 5. A SUB ELECTRICAL PERMIT IS REQUIRED FOR THE SOURCE |
| | OF IGNITION, WPB AMENDMENTS TO THE FBC SEC. 105.1. |
| | |
| | 6. AL LINES ON THE OUTSIDE FOR THE HOT MUST BE |
| | INSULATED PER 2017 FBC EC 403.5.3. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | 561-805-6720 |
| | |