| 2019-08-09 07:22:45 | 8/9/2018 1ST PLUMBING REVIEW **DENIED** WITH COMMENTS |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1) PERMIT APPLICATION AND INVOICE DO NOT MATCH AND ARE |
| | DIFFERENT CONTRACTORS. (ROYAL ROOTER, HARRY BARBER |
| | PLUMBING) |
| | |
| | 2) PLUMBING REPAIR TUNNEL WORK |
| | A CLEAR AND LEGIBLE SANITARY RISER DIAGRAM SHALL BE |
| | SUBMITTED SHOWING ALL PIPE SIZES, CONNECTION POINTS TO |
| | EXISTING PIPING, HOW THE NEW PIPE WILL BE SUPPORTED, |
| | THE TYPE OF ADAPTERS USED FOR THE CONNECTIONS TO |
| | EXISTING PIPE, AND THE LOCATIONS OF REQUIRED CLEANOUTS. |
| | DETAILS AND BACKFILLING PROCEDURES SHALL BE SUBMITTED |
| | THAT CLEARLY SHOW HOW THE STRUCTURAL INTEGRITY OF THE |
| | CONCRETE SLAB WILL BE MAINTAINED DURING EXCAVATION AND |
| | BACKFILLING. STRUCTURAL FOAM IS NOT PERMITTED BELOW |
| | GROUND PER THE FLORIDA BUILDING CODE, RESIDENTIAL, |
| | SECTION 318 AND THE FLORIDA BUILDING CODE, BUILDING, |
| | SECTION 2603.9. |
| | A SIGNED AND SEALED LETTER FROM AN ENGINEER MAY BE |
| | REQUIRED TO CERTIFY THE STRUCTURAL INTEGRITY OF THE |
| | EXISTING SLAB. |
| | THE AREA ABOVE GRADE WHERE THE TUNNEL WAS DUG SHALL BE |
| | TREATED FOR TERMITES PER THE FBC-BUILDING SEC.1816.1 OR |
| | FBC-RESIDENTIAL SEC. R318. A TERMITE CERTIFICATE SHALL |
| | BE ONSITE FOR FINAL INSPECTION. |
| | |
| | |
| | |
| | |
| | |
| | |
| | ATELYO BELISLE |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLANS EXAMINER |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | 561-805-6695 |
| | |