|
 |
 |
 |
 |
 |
Plan Review Details - Permit 19080279
| Plan Review Stops For Permit 19080279 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2019-08-13 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-08-13 |
Time |
17:09 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-08-13 |
Time |
16:41 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2019-08-13 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-08-13 |
Time |
11:41 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-08-13 |
Time |
11:41 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2019-08-30 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2019-08-30 |
Time |
06:21 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2019-08-27 |
Time |
15:09 |
Sent To |
|
|
| Notes |
| 2019-08-27 15:09:32 | RESUB ROUTED TO TKLARGE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2019-08-13 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-08-13 |
Time |
17:09 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-08-06 |
Time |
13:54 |
Sent To |
|
|
| Notes |
| 2019-08-07 13:54:46 | ROUTED TO ZONING INBOX |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2019-08-30 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2019-08-30 |
Time |
06:21 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2019-08-30 |
Time |
05:36 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2019-08-13 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2019-08-13 |
Time |
08:45 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2019-08-13 |
Time |
07:42 |
Sent To |
|
|
| Notes |
| 2019-08-13 08:45:19 | 1) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE | | | MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM | | | ITS PUMP CURVE AND THE SIMPLIFIED TOTAL DYNAMIC HEAD | | | CALCULATION IS NO LONGER ALLOWED TO BE USED IN | | | DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC | | | 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION | | | ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT | | | REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED | | | THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET | | | FITTING ASSEMBLY (DRAIN COVER).THE TDH CALCULATIONS | | | MUST INCLUDE ALL OF THE SYSTEM COMPONENTS INCLUDING | | | SUCTION AND RETURN PIPING, FITTINGS, VALVES, HEATER, | | | FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS EXCEPT | | | THE PUMP. | | | | | | 2) SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE. | | | IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC | | | TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS | | | NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH | | | CALCULATIONS. ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, | | | 4.4.9.1 | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2019-08-09 |
|
|
Cont ID |
|
| Sent By |
ajones |
Date |
2019-08-09 |
Time |
11:07 |
Rev Time |
0.00 |
| Received By |
ajones |
Date |
2019-08-09 |
Time |
11:07 |
Sent To |
|
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |