Plan Review Details - Permit 19080279
Plan Review Stops For Permit 19080279
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-08-13 Cont ID  
Sent By rmcdouga Date 2019-08-13 Time 17:09 Rev Time 0.00
Received By rmcdouga Date 2019-08-13 Time 16:41 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2019-08-13 Cont ID  
Sent By jleahy Date 2019-08-13 Time 11:41 Rev Time 0.00
Received By jleahy Date 2019-08-13 Time 11:41 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-08-30 Cont ID  
Sent By tklarge Date 2019-08-30 Time 06:21 Rev Time 0.00
Received By tklarge Date 2019-08-27 Time 15:09 Sent To  
Notes
2019-08-27 15:09:32RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-08-13 Cont ID  
Sent By rmcdouga Date 2019-08-13 Time 17:09 Rev Time 0.00
Received By rmcdouga Date 2019-08-06 Time 13:54 Sent To  
Notes
2019-08-07 13:54:46ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2019-08-30 Cont ID  
Sent By tklarge Date 2019-08-30 Time 06:21 Rev Time 0.00
Received By tklarge Date 2019-08-30 Time 05:36 Sent To I
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2019-08-13 Cont ID  
Sent By tklarge Date 2019-08-13 Time 08:45 Rev Time 0.00
Received By tklarge Date 2019-08-13 Time 07:42 Sent To  
Notes
2019-08-13 08:45:191) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE
 MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM
 ITS PUMP CURVE AND THE SIMPLIFIED TOTAL DYNAMIC HEAD
 CALCULATION IS NO LONGER ALLOWED TO BE USED IN
 DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC
 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION
 ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT
 REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED
 THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET
 FITTING ASSEMBLY (DRAIN COVER).THE TDH CALCULATIONS
 MUST INCLUDE ALL OF THE SYSTEM COMPONENTS INCLUDING
 SUCTION AND RETURN PIPING, FITTINGS, VALVES, HEATER,
 FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS EXCEPT
 THE PUMP.
  
 2) SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE.
 IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC
 TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS
 NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH
 CALCULATIONS. ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9,
 4.4.9.1
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop Z ZONING
Rev No 1 Status P Date 2019-08-09 Cont ID  
Sent By ajones Date 2019-08-09 Time 11:07 Rev Time 0.00
Received By ajones Date 2019-08-09 Time 11:07 Sent To  
Notes
***NONE***