| Plan Review Stops For Permit 19080185 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2019-12-20 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-12-20 |
Time |
18:32 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-12-20 |
Time |
18:10 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2019-09-13 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-09-13 |
Time |
10:05 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-09-13 |
Time |
10:05 |
Sent To |
|
|
| Notes |
| 2019-09-13 11:36:03 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) PROVIDE GENERATOR AND STAIR PLATFORM TO SLAB | | | FASTENING DETAILS. SPECIFY THE ANCHOR TYPES, ANCHOR | | | DIMENSIONS AND REQUIRED IMBED DEPTHS. FBC 1609.1 | | | | | | 2) THE FOUNDATION NOTES ON SHEET S-01 ARE VERY FAINT | | | AND HARD TO READ. THIS IS NOT ACCEPTABLE. FBC 107.2.1.3 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2019-12-30 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-12-30 |
Time |
16:03 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-12-30 |
Time |
16:03 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2019-08-26 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-08-26 |
Time |
08:06 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-08-26 |
Time |
08:06 |
Sent To |
|
|
| Notes |
| 2019-08-26 10:53:04 | FLORIDA BUILDING CODE 2017 6TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | | NFPA 70 2014 EDITION | | | | | | JAKE LEAHY BN, BU, PX | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | 1) VALUE FOR WORK TO LOW, PERMIT SHALL INCLUDE ALL | | | CUSTOMER SUPPLIED EQUIPMENT AND MATERIALS. | | | | | | 109.3 BUILDING PERMIT VALUATIONS. IF, IN THE OPINION OF | | | THE BUILDING OFFICIAL, THE CLAIMED VALUATION OF | | | BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS, | | | MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE | | | UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE | | | DENIED, UNLESS THE APPLICANT CAN SHOW DETAILED, | | | QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED CONTRACTS | | | (EXCLUDING LAND VALUE) TO MEET THE APPROVAL OF THE | | | BUILDING OFFICIAL. FOR PERMITTING PURPOSES, VALUATION | | | OF BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT | | | VALUE TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING, | | | MECHANICAL, INTERIOR FINISH, RELATIVE SITE WORK, | | | ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS, | | | OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE. | | | VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED | | | DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES | | | (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY | | | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT | | | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. | | | | | | 2) PAGE E.03 SHOW HOW LOAD CALCULATION WAS FIGURED. | | | | | | 3) PAGE E.03 AIC CALCULATIONS AND SIGNS PER 110.10, AND | | | 110.24 | | | | | | 4) PAGE E.03 BREAKERS IN ATS, DP, GEN, TO MEET 240.87 | | | | | | 5) PAGE E.03, E.01, SOME NOTES ARE BLOCKED OUT, BLACK | | | RECTANGLES | | | | | | 6) PAGE E.03 NEW TVSS NOT SHOWN ON DP PANEL SCHEDULE. | | | | | | | | | | | | | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2019-12-31 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2019-12-31 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2019-12-30 |
Time |
15:57 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2019-08-20 |
|
|
Cont ID |
|
| Sent By |
J.Walker |
Date |
2019-08-20 |
Time |
|
Rev Time |
0.00 |
| Received By |
jwalker |
Date |
2019-08-20 |
Time |
|
Sent To |
E |
|
| Notes |
| 2019-08-20 09:48:08 | FIRE PASSED | | | SENT TO ELECTRICAL |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2020-01-02 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2020-01-02 |
Time |
09:41 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2019-12-19 |
Time |
13:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2019-10-03 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2019-10-03 |
Time |
07:10 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2019-08-16 |
Time |
13:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2019-12-30 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-12-30 |
Time |
16:03 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-12-30 |
Time |
16:03 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2019-09-13 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-09-13 |
Time |
10:04 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-09-13 |
Time |
09:45 |
Sent To |
|
|
| Notes |
| 2019-09-13 10:04:47 | ENGINEER'S SIGNATURE IS SELF CERTIFIED. | | 2019-08-19 13:35:51 | SHEET 008 S01-STRUCTUAL PLAN - DIGITALLY SIGNED VERSION | | | IN "SIGNATURES" FOLDER. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2019-12-19 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
2019-12-19 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
pgreilic |
Date |
2019-10-01 |
Time |
|
Rev Time |
0.00 |
| Received By |
pgreilic |
Date |
2019-10-01 |
Time |
16:40 |
Sent To |
|
|
| Notes |
| 2019-10-01 16:41:02 | PLEASE PROVIDE APPROVED SITE PLAN PER MINOR PD | | | AMENDMENT. INDICATE AREA OF WORK SPECIFIC TO PERMIT. | | | | | | PAUL GREILICH, SENIOR PLANNER | | | 561-822-1443 | | | [email protected] |
|
|