| 2019-08-22 06:14:05 | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. |
| | |
| | 1. PROVIDE ELECTRICAL PLAN FOR REVIEW, SIGNED AND |
| | SEALED BY A LICENSED DESIGN PROFESSIONAL OR SIGNED BY |
| | THE ELECTRICAL CONTRACTOR QUALIFIER. FS 471.003(2)(H); |
| | 471.025; WPB FBC 107.2.1, 107.3.5 |
| | |
| | 2. VALUE LOW FOR AMOUNT OF WORK SHOWN, RAISE VALUE. |
| | |
| | WE NEED AN ACCURATE VALUE FOR THE WORK BEING PERFORMED, |
| | TO INCLUDE ALL MATERIALS AND LABOR. THIS SHOULD EVEN |
| | INCLUDE ITEMS THAT ARE CUSTOMER SUPPLIED. PLEASE |
| | RECALCULATE YOUR VALUE AND PROVIDE AN ACCURATE |
| | ESTIMATE. THE FEE FOR A PERMIT IS BASED ON A PERCENTAGE |
| | OF THE JOB VALUE, SO AN INCREASE IN VALUE TYPICALLY |
| | MAKES A SMALL DIFFERENCE IN THE PERMIT FEES. HOWEVER, |
| | CONFIRMING AN ACCURATE VALUE FOR THE PROPOSED WORK IS |
| | INCLUDED IN THE JOB DESCRIPTION FOR A PLAN REVIEWER. AS |
| | SUCH, YOUR PERMIT CANNOT BE APPROVED UNTIL THIS ISSUE |
| | IS RESOLVED. |
| | |
| | IN THE FUTURE YOUR PERMIT VALUE SHOULD INCLUDE ALL |
| | MATERIALS SUPPLIED BY YOU THE CONTRACTOR AND ANY |
| | CUSTOMER RELATED ITEMS AND LABOR TO INSTALL THE WORK |
| | PER FBC 109.3. BELOW YOU WILL FIND THE FBC SECTION FOR |
| | VALUATION OF THE WORK FOR A PERMIT. |
| | |
| | CITY ORDINANCE AND FBC 109.3 BUILDING PERMIT |
| | VALUATIONS. IF, IN THE OPINION OF THE BUILDING |
| | OFFICIAL, THE CLAIMED VALUATION OF BUILDING, |
| | ALTERATION, STRUCTURE, ELECTRICAL, GAS, MECHANICAL OR |
| | PLUMBING SYSTEMS APPEARS TO BE UNDERESTIMATED ON THE |
| | APPLICATION, THE PERMIT SHALL BE DENIED, UNLESS THE |
| | APPLICANT CAN SHOW DETAILED, QUANTITY ESTIMATES, AND/OR |
| | BONA FIDE SIGNED CONTRACTS (EXCLUDING LAND VALUE) TO |
| | MEET THE APPROVAL OF THE BUILDING OFFICIAL. FOR |
| | PERMITTING PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS |
| | SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY |
| | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST |
| | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS |
| | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| | |
| | |
| | END OF COMMENTS. |
| | |
| | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN |
| | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES |
| | INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE |
| | PREVIOUSLY REVIEWED SHEETS. |
| | CODES IN EFFECT: |
| | |
| | FBC = FLORIDA BUILDING CODE 2017 6TH EDITION |
| | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA |
| | BUILDING CODE 2017 6TH ED. |
| | FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2017 |
| | 6TH EDITION |
| | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 |
| | 6TH EDITION |
| | FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION |
| | NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE |
| | FS = FLORIDA STATUTES |
| | |
| | V/R, |
| | |
| | FRANK GIAQUINTO III |
| | ELECTRICAL INSPECTOR |
| | ELECTRICAL PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | [email protected] |
| | CELL: 561-657-1653 |
| | |
| | |