Plan Review Details - Permit 19071061
Plan Review Stops For Permit 19071061
Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2019-08-16 Cont ID  
Sent By pleduc Date 2019-08-16 Time   Rev Time 0.00
Received By pleduc Date 2019-08-16 Time 14:11 Sent To P
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2019-08-01 Cont ID  
Sent By J.Walker Date 2019-08-01 Time   Rev Time 0.00
Received By jwalker Date 2019-08-01 Time 07:17 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-08-20 Cont ID  
Sent By lcrespo Date 2019-08-20 Time 11:03 Rev Time 0.00
Received By lcrespo Date 2019-08-14 Time 14:06 Sent To  
Notes
2019-08-15 14:06:19RESUB ROUTED TO FIRE INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-08-08 Cont ID  
Sent By lcrespo Date 2019-08-08 Time 07:11 Rev Time 0.00
Received By lcrespo Date 2019-07-19 Time 11:48 Sent To  
Notes
2019-07-22 11:49:01ROUTED TO PLUMBING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2019-08-20 Cont ID  
Sent By lcrespo Date 2019-08-20 Time 11:04 Rev Time 0.00
Received By lcrespo Date 2019-08-20 Time 11:03 Sent To  
Notes
2019-08-20 11:04:3708/20/19 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2019-07-31 Cont ID  
Sent By lcrespo Date 2019-07-31 Time 06:49 Rev Time 0.00
Received By lcrespo Date 2019-07-29 Time 07:28 Sent To  
Notes
2019-07-31 07:10:5507/31/2019 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. PROVIDE SPECIFICATION FOR FITTINGS, POWER PEDESTAL
 AND SDR PIPE, AMENDMENTS TO THE FBC SEC.107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
 2. SHOW BACKFLOW PREVENTION DEVICE AND ITS LOCATION, IF
 ONE REQUIRED A SEPARATE PERMIT, APPLICATION AND WILL
 NEED TO BE INSTALLED LICENSED CONTRACTOR, 2017 FBC SEC
 P1301.5 POTABLE WATER CONNECTIONS.
 3. SHOW TYPICAL HEIGHT FOR SEWER VACUUM HOSE
 CONNECTION. WPB AMENDMENTS TO THE FBC SEC.107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
 4. SHEET P1 FORCE MAIN AS A 3? YET IN P2 SHOWS 2? (20?
 WIDE CROSS DETAIL) WPB AMENDMENTS TO THE FBC
 SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
 5. THE 3? FORCE MAIN ON THE LANDSIDE IS IT TERMINATING
 INTO A 3?, PLEASE SHOW THE SIZE WHERE IT IS
 TERMINATING. ON THE FAR RIGHT OF P1 DOES THIS
 TERMINATE, OR DOES IT CONTINUE FOR FUTURE, PLEASE
 CLARIFY, WPB AMENDMENTS TO THE FBC SEC.107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved