| 2019-07-31 07:10:55 | 07/31/2019 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. PROVIDE SPECIFICATION FOR FITTINGS, POWER PEDESTAL |
| | AND SDR PIPE, AMENDMENTS TO THE FBC SEC.107.2.1 |
| | INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | 2. SHOW BACKFLOW PREVENTION DEVICE AND ITS LOCATION, IF |
| | ONE REQUIRED A SEPARATE PERMIT, APPLICATION AND WILL |
| | NEED TO BE INSTALLED LICENSED CONTRACTOR, 2017 FBC SEC |
| | P1301.5 POTABLE WATER CONNECTIONS. |
| | 3. SHOW TYPICAL HEIGHT FOR SEWER VACUUM HOSE |
| | CONNECTION. WPB AMENDMENTS TO THE FBC SEC.107.2.1 |
| | INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | 4. SHEET P1 FORCE MAIN AS A 3? YET IN P2 SHOWS 2? (20? |
| | WIDE CROSS DETAIL) WPB AMENDMENTS TO THE FBC |
| | SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | 5. THE 3? FORCE MAIN ON THE LANDSIDE IS IT TERMINATING |
| | INTO A 3?, PLEASE SHOW THE SIZE WHERE IT IS |
| | TERMINATING. ON THE FAR RIGHT OF P1 DOES THIS |
| | TERMINATE, OR DOES IT CONTINUE FOR FUTURE, PLEASE |
| | CLARIFY, WPB AMENDMENTS TO THE FBC SEC.107.2.1 |
| | INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | 561-805-6720 |
| | |