| Plan Review Stops For Permit 19071050 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2019-07-25 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-07-25 |
Time |
09:30 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-07-25 |
Time |
09:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2019-07-29 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-07-29 |
Time |
13:58 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-07-29 |
Time |
13:58 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2019-10-07 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2019-10-07 |
Time |
11:40 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2019-10-03 |
Time |
11:33 |
Sent To |
|
|
| Notes |
| 2019-10-04 11:33:54 | RESUB ROUTED TO TKLARGE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2019-08-30 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2019-08-30 |
Time |
06:43 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2019-08-27 |
Time |
14:39 |
Sent To |
|
|
| Notes |
| 2019-08-27 14:39:43 | RESUB ROUTED TO ZONING INBOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2019-08-04 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2019-08-04 |
Time |
11:34 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2019-07-19 |
Time |
11:48 |
Sent To |
|
|
| Notes |
| 2019-07-22 11:48:14 | ROUTED TO ZONING INBOX |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2019-10-07 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2019-10-07 |
Time |
11:40 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2019-10-07 |
Time |
11:26 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2019-08-30 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2019-08-30 |
Time |
06:42 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2019-08-30 |
Time |
06:28 |
Sent To |
I |
|
| Notes |
| 2019-08-30 06:42:15 | 1) SHT. 1 OF 1 - THE SHEET CONTAINING THE TOTAL DYNAMIC | | | HEAD CALCULATION IS PRACTICABLY ILLEGIBLE DUE TO THE | | | SMALL PRINTING. THIS PAGE IS CONSTANTLY BEING SUBMITTED | | | AND REJECTED FOR THE SAME REASONS. IT IS DIFFICULT TO | | | READ. PLEASE PLACE THIS INFORMATION ON A SEPARATE SHEET | | | AND EXPAND IT SO ALL INFORMATION IS LEGIBLE AND CLEAR | | | IN DETAIL. WPB AMEND. TO FBC SEC. 107.2.1. | | | 2) SHT. 2 OF 4 - THE INFORMATION IN THE BOX FOR THE | | | "SPA ONLY" NOTES THE MAXIMUM FLOW SYSTEM RATE IS FROM | | | THE PUMP CURVE. THE MAXIMUM FLOW OF THE PUMP FROM ITS | | | PUMP CURVE AND THE SIMPLIFIED TOTAL DYNAMIC HEAD | | | CALCULATION IS NO LONGER ALLOWED TO BE USED IN | | | DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC | | | 7 - 2013 SECS. 4.4.9, 4.4.9.1. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2019-08-04 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2019-08-04 |
Time |
11:34 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2019-08-04 |
Time |
11:19 |
Sent To |
I |
|
| Notes |
| 2019-08-04 11:34:01 | 1) SUBMIT TWO COPIES OF THE MANUFACTURER'S | | | SPECIFICATIONS FOR THE NEW PUMP BEING INSTALLED. WPB | | | AMEND. TO FBC SEC. 107.2.1. | | | 2) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE | | | MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM | | | ITS PUMP CURVE AND THE SIMPLIFIED TOTAL DYNAMIC HEAD | | | CALCULATION IS NO LONGER ALLOWED TO BE USED IN | | | DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC | | | 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION | | | ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT | | | REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED | | | THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET | | | FITTING ASSEMBLY (DRAIN COVER).THE TDH CALCULATIONS | | | MUST INCLUDE ALL OF THE SYSTEM COMPONENTS INCLUDING | | | SUCTION AND RETURN PIPING, FITTINGS, VALVES, HEATER, | | | FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS EXCEPT | | | THE PUMP. | | | 3) SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE. | | | IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC | | | TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS | | | NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH | | | CALCULATIONS. ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, | | | 4.4.9.1. | | | | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2019-08-29 |
Time |
|
Rev Time |
0.00 |
| Received By |
pgreilic |
Date |
2019-08-29 |
Time |
12:46 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2019-07-24 |
Time |
|
Rev Time |
0.00 |
| Received By |
pgreilic |
Date |
2019-07-24 |
Time |
15:29 |
Sent To |
|
|
| Notes |
| 2019-07-24 15:30:01 | 1.) LABEL SETBACK FROM REAR PROPERTY LINE | | | | | | PAUL GREILICH, SENIOR PLANNER | | | 561-822-1443 | | | [email protected] |
|
|