| 2019-07-13 13:14:06 | 7/13/19 DENIED |
| | |
| | A SUB ELECTRICAL PERMIT IS REQUIRED FOR THE SOURCE OF |
| | IGNITION, WPB AMENDMENTS TO THE FBC SEC. 105.1 |
| | |
| | A SUB PLUMBING PERMIT IS REQUIRED FOR THE SOURCE OF |
| | IGNITION, WPB AMENDMENTS TO THE FBC SEC. 105.1 |
| | |
| | I HAVE RESEARCHED CITY RECORDS BACK TO 0000 AND THERE |
| | IS NO RECORD OF A PERMIT FOR THE INSTALLATION OF ANY |
| | GAS ON THIS PROPERTY. WHAT OTHER APPLIANCES/EQUIPMENT |
| | IS SUPPLIED BY THIS "EXISTING" GAS METER? SINCE THERE |
| | IS NO RECORD OF A PERMIT FOR THE EXISTING GAS, THE |
| | EXISTING GAS MUST BE INCLUDED IN THIS PERMIT FOR THIS |
| | SCOPE OF WORK. WPB AMENDMENTS TO THE FBC SEC. 105.1. |
| | |
| | LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL BTU |
| | LOAD ON THE SYSTEM. REFER TO THE 2017 FBC FUEL GAS |
| | SECS. 401.8 THROUGH 402.6.1 AND TABLES 402.4 (1) |
| | THROUGH 402.4 (37) OR 2017 FBC FUEL GAS RES. SEC. |
| | G2413. |
| | |
| | INDICATE ON THE PLAN IF THE TANKLESS WATER HEATER IS |
| | THE ONLY GAS APPLIANCE IN THIS SYSTEM? IF NOT, SUBMIT A |
| | COMPLETE GAS RISER SHOWING ALL PIPE SIZES, TYPE OF |
| | PIPE, THE DEVELOPED LENGTH TO THE FURTHEST GAS OUTLET, |
| | THE BTU LOAD OF EACH APPLIANCE, THE PSI OF THE SYSTEM, |
| | THE TYPE OF GAS AND THE TOTAL BTU LOAD ON THE SYSTEM. |
| | THESE REQUIREMENTS ALSO APPLY TO A NEW GAS SYSTEM. WPB |
| | AMENDMENTS TO THE FBC SEC. 107.3.5.3 (12) RESIDENTIAL |
| | GAS |
| | |
| | SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE LOCATION |
| | OF THE TANKLESS WATER HEATER AND THE LOCATION AND |
| | DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN RELATION |
| | TO THE WATER HEATER. THE LOCATION OF THE WATER HEATER |
| | SHALL COMPLY WITH THE MANUFACTURER'S INSTALLATION |
| | INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND DRAWN. WPB |
| | AMENDMENTS TO THE FBC SEC. 107.2.1. INFORMATION ON |
| | CONSTRUCTION DOCUMENTS. |
| | |
| | THE CLAIMED VALUE APPEARS TO BE UNDERESTIMATED ON THE |
| | APPLICATION, PLEASE PROVIDE A BONA FIDE SIGNED |
| | CONTRACT. WPB AMENDMENTS TO THE FBC SEC. 109.3 BUILDING |
| | PERMIT VALUATIONS. |
| | |
| | INDICATE ON THE PLAN IF THE TANKLESS WATER HEATER IS |
| | REPLACING AN EXISTING TANKLESS WATER HEATER OR IS IT |
| | REPLACING A STORAGE TANK TYPE WATER HEATER OR IS IT |
| | BEING ADDED TO THE EXISTING HOT WATER SYSTEM? INDICATE |
| | ON THE APPLICATION IN THE DESCRIPTION OF WORK. WPB |
| | AMENDMENTS TO THE FBC SEC. 107.2.1. INFORMATION ON |
| | CONSTRUCTION DOCUMENTS |
| | |
| | SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO THE |
| | APPLIANCE. COMPLY WITH 2017 FBC FUEL GAS TABLE 402.4 |
| | (28) OR 2017 FBC FUEL GAS RES.TABLE G2413.4 (12) |
| | SCHEDULE 40 METALLIC PIPE FOR THE PROPER PIPE SIZE AND |
| | BTU LOAD. |
| | |
| | REGULATORS INSTALLED OUTDOORS SHALL BE DESIGNED, |
| | INSTALLED OR PROTECTED SO THEIR OPERATION WILL NOT BE |
| | AFFECTED BY THE ELEMENTS. PROVIDE DOCUMENTATION FROM |
| | THE MANUFACTURER THAT THE REGULATORS ARE APPROVED FOR |
| | EXTERIOR USE. NFPA 58-11 SEC. 6.8.1.5. |
| | |
| | |
| | ATELYO BELISLE |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | 561-805-6695 |
| | |