Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2020-03-26 Cont ID  
Sent By jgomez Date 2020-03-26 Time 17:06 Rev Time 0.00
Received By jgomez Date 2020-03-26 Time 16:38 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2020-03-13 Cont ID  
Sent By jgomez Date 2020-03-13 Time 19:14 Rev Time 0.00
Received By jgomez Date 2020-03-13 Time 11:52 Sent To I
Notes
2020-03-13 19:15:0103/13/2020 DISCUSSED WITH ROBERT BROWN (BUILDING
 OFFICIAL).
  
 THIRD BUILDING REVIEW CHECKLIST.
 CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS.
  
 1- ENGINEERING FOR THE PRE-FAB GENERATOR PAD:
  
 A) DRAWING SUBMITTED DOESN'T HAVE THE ENGINEER'S
 ADDITIONAL INFORMATION REQUIRED BY 61G15-23.001(4) FAC.
 THE ENGINEER IS USING AN EMBOSSED SEAL, BUT THERE IS
 NOT A TITLE BLOCK SHOWING THE ENGINEER'S PRINTED
 INFORMATION AS REQUIRED BY 61G15-23.001(4) FAC.
 ALSO, CLARIFY WHY THE PREVIOUS ENGINEERING HAD A
 COMPLETE ENGINEER'S SIGNATURE BUT ENGINEERING SUBMITTED
 NOW HAVE ONLY THE ENGINEER'S INITIALS.
 (NOTE: THE ENGINEER'S NAME AND LICENSE NUMBER WILL NOT
 BE LEGIBLE WHEN SCANNING THIS DOCUMENT FOR RECORDS
 RETENTION BECAUSE THIS INFORMATION IS NOT PRINTED WHEN
 USING JUST AN EMBOSSED SEAL. SEC. 107.2.1.3 CITY
 AMENDMENTS).
  
 B) PLEASE CLARIFY WHY THE EQUIPMENT WEIGHT WAS
 INCREASED AND THE WIND LOADS WERE REDUCED BASED ON THE
 PREVIOUS SUBMITTAL IF THE EQUIPMENT WAS NOT CHANGED.
 SEC. 107.2.1 CITY AMENDMENTS.
  
 C) PROVIDE TWO COPIES OF THE ENGINEERING. ONLY ONE COPY
 WAS PROVIDED. SEC. 107.1 CITY AMENDMENTS.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2020-03-03 Cont ID  
Sent By rmcdouga Date 2020-03-03 Time 07:48 Rev Time 0.00
Received By rmcdouga Date 2020-03-03 Time 07:46 Sent To FIRE
Notes
2020-03-03 07:59:58PLAN
 REVIEW COMMENTS
  
 2ND REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) REPEAT COMMENT. AT LEAST ONE OF THE GENERATOR PAD
 ENGINEERING DOCUMENTS IS REQUIRED TO HAVE THE
 ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE. 61G15-23.003
 PROCEDURES FOR PHYSICALLY SIGNING AND SEALING PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS. ENGINEERING
 PLANS, SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS WHICH
 MUST BE SIGNED, DATED AND SEALED IN ACCORDANCE WITH THE
 PROVISIONS OF SECTION 471.025, F.S., AND RULE
 61G15-23.001, F.A.C. MUST BE PHYSICALLY SIGNED, DATED
 AND SEALED AS PROVIDED HEREIN BY THE PROFESSIONAL
 ENGINEER IN RESPONSIBLE CHARGE.
 (1) THE LICENSEE SHALL SIGN BY HAND AN ORIGINAL OF THE
 LICENSEE?S SIGNATURE ON EACH PAGE REQUIRED TO BE
 SEALED. A SCANNED, FACSIMILE, DIGITALLY CREATED OR
 COPIED IMAGE OF THE LICENSEE?S SIGNATURE SHALL NOT BE
 USED.
 (2) THE LICENSEE MUST THEN USE A WET SEAL, A DIGITALLY
 CREATED SEAL, OR AN EMBOSSING SEAL PLACED PARTIALLY
 OVERLAPPING THE LICENSEE?S SIGNATURE ON EACH PAGE
 REQUIRED TO BE SEALED. THE PLACEMENT OF THE SEAL SHALL
 NOT RENDER THE SIGNATURE ILLEGIBLE.
 SUBMIT TWO SETS OF FLORIDA PRODUCT APPROVALS OR
 MIAMI-DADE NOTICES OF ACCEPTANCE OR SIGNED AND SEALED
 ENGINEERING FOR THE PRE-FAB GENERATOR PAD. FBC 107.2.1
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-07-22 Cont ID  
Sent By rmcdouga Date 2019-07-22 Time 14:11 Rev Time 0.00
Received By rmcdouga Date 2019-07-22 Time 07:46 Sent To  
Notes
2019-07-22 14:15:50PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SUBMIT TWO SETS OF FLORIDA PRODUCT APPROVALS OR
 MIAMI-DADE NOTICES OF ACCEPTANCE OR SIGNED AND SEALED
 ENGINEERING FOR THE PRE-FAB GENERATOR PAD. FBC 107.2.1
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2020-03-02 Cont ID  
Sent By jleahy Date 2020-03-02 Time 14:49 Rev Time 0.00
Received By jleahy Date 2020-03-02 Time 14:49 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2019-07-24 Cont ID  
Sent By jleahy Date 2019-07-24 Time 12:01 Rev Time 0.00
Received By jleahy Date 2019-07-24 Time 12:01 Sent To  
Notes
2019-07-24 12:01:49SENT TP FIRE
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2020-03-04 Cont ID  
Sent By pleduc Date 2020-03-04 Time   Rev Time 0.00
Received By pleduc Date 2020-03-04 Time 14:24 Sent To I
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2019-07-24 Cont ID  
Sent By pleduc Date 2019-07-24 Time   Rev Time 0.00
Received By pleduc Date 2019-07-24 Time 12:52 Sent To I
Notes
2019-07-24 13:28:48THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
 1) SITE PLAN - A REVIEW OF THE ACTUAL SITE AREA SHOWS
 FEATURES THAT ARE NOT INDICATED OF THE SUBMITTED
 DRAWINGS.
  
 THERE IS AN EXTERIOR CONCRETE WALL, ELECTRICAL
 DISCONNECTS AND WINDOWS ON THE PROPOSED EXTERIOR WALL
 LOCATION.
  
 PLEASE PROVIDE GREATER DETAIL WITH ALL APPLICABLE
 DIMENSIONS TO MORE ACTUALLY REFLECT EXISTING
 CONSTRUCTED FEATURES.
  
  
  
 2) THERE ARE NO FIRE CODE REFERENCES OF COMPLIANCE.
  
 THE INSTALL SHALL COMPLY WITH NFPA 110 AND NFPA 54.
  
 PLEASE REVIEW AND ENSURE COMPLIANCE AND PROVIDE AN
 APPLICABLE CODE REFERENCE NOTE.
  
  
  
 3) WHAT CLASS OF TYPE IS THE PROPOSED GENERATOR AS THIS
 IS HOW IT WILL BE TESTED.
  
 PER NFPA 110
  
 CHAPTER 4 CLASSIFICATION OF EMERGENCY POWER SUPPLY
 SYSTEMS (EPSSS)
 4.1* GENERAL. THE EPSS SHALL PROVIDE A SOURCE OF
 ELECTRICAL
 POWER OF REQUIRED CAPACITY, RELIABILITY, AND QUALITY TO
 LOADS FOR
 A LENGTH OF TIME AS SPECIFIED IN TABLE 4.1(A) AND
 WITHIN A SPECIFIED
 TIME FOLLOWING LOSS OR FAILURE OF THE NORMAL POWER
 SUPPLY
 AS SPECIFIED IN TABLE 4.1(B).
 4.2* CLASS. THE CLASS DEFINES THE MINIMUM TIME, IN
 HOURS, FOR
 WHICH THE EPSS IS DESIGNED TO OPERATE AT ITS RATED LOAD
 WITHOUT
 BEING REFUELED OR RECHARGED. [SEE TABLE 4.1(A).]
 4.3 TYPE. THE TYPE DEFINES THE MAXIMUM TIME, IN
 SECONDS,
 THAT THE EPSS WILL PERMIT THE LOAD TERMINALS OF THE
 TRANSFER
 SWITCH TO BE WITHOUT ACCEPTABLE ELECTRICAL POWER. TABLE
 4.1(B)
 PROVIDES THE TYPES DEFINED BY THIS STANDARD.
 4.4* LEVEL. THIS STANDARD RECOGNIZES TWO LEVELS OF
 EQUIPMENT
 INSTALLATION, PERFORMANCE, AND MAINTENANCE.
 4.4.1* LEVEL 1 SYSTEMS SHALL BE INSTALLED WHERE FAILURE
 OF THE
 EQUIPMENT TO PERFORM COULD RESULT IN LOSS OF HUMAN LIFE
 OR
 SERIOUS INJURIES.
 4.4.2* LEVEL 2 SYSTEMS SHALL BE INSTALLED WHERE FAILURE
 OF THE
 EPSS TO PERFORM IS LESS CRITICAL TO HUMAN LIFE AND
 SAFETY.
 4.4.3 ALL EQUIPMENT SHALL BE PERMANENTLY INSTALLED.
 4.4.4* LEVEL 1 AND LEVEL 2 SYSTEMS SHALL ENSURE THAT
 ALL LOADS
 SERVED BY THE EPSS ARE SUPPLIED WITH ALTERNATE POWER
 THAT
 MEETS ALL THE FOLLOWING CRITERIA:
 (1) OF A QUALITY WITHIN THE OPERATING LIMITS OF THE
 LOAD
 (2) FOR A DURATION SPECIFIED FOR THE CLASS AS DEFINED
 IN TABLE
 4.1(A)
 (3) WITHIN THE TIME SPECIFIED FOR THE TYPE AS DEFINED
 IN TABLE
 4.1(B)
  
 PLEAE REVIEW AND PROVIDE DETAILS.
  
  
  
 4) PLEASE SHOW THE ROUTE OF THE NG LINE ON THE SITE
 PLAN, A SCHEMATIC IS PROVIDED BUT NOT THE ACTUAL ROUTE.
  
 ADDITIONALLY, PER NFPA 54
  
 7.1.2.1 COVER REQUIREMENTS. UNDERGROUND PIPING SYSTEMS
 SHALL BE INSTALLED WITH A MINIMUM OF 12 IN. (300 MM) OF
 COVER.
 (A) THE MINIMUM COVER SHALL BE INCREASED TO 18 IN.
 (460MM)IF
 EXTERNAL DAMAGE TO THE PIPE OR TUBING FROM EXTERNAL
 FORCES IS
 LIKELY TO RESULT.
 (B) WHERE A MINIMUM OF 12 IN. (300 MM) OF COVER CANNOT
 BE
 PROVIDED, THE PIPE SHALL BE INSTALLED IN CONDUIT OR
 BRIDGED
 (SHIELDED).
 7.1.3.2 UNDERGROUND PIPING SHALL COMPLY WITH ONE OR
 MORE
 OF THE FOLLOWING UNLESS APPROVED TECHNICAL
 JUSTIFICATION IS PROVIDED
 TO DEMONSTRATE THAT PROTECTION IS UNNECESSARY:
 (1) THE PIPING SHALL BE MADE OF CORROSION-RESISTANT
 MATERIAL THAT
 IS SUITABLE FOR THE ENVIRONMENT IN WHICH IT WILL BE
 INSTALLED.
 (2) PIPE SHALL HAVE A FACTORY-APPLIED, ELECTRICALLY
 INSULATING
 COATING. FITTINGS AND JOINTS BETWEEN SECTIONS OF COATED
 PIPE SHALL BE COATED IN ACCORDANCE WITH THE COATING
 MANUFACTURER?S
 INSTRUCTIONS.
 (3) THE PIPING SHALL HAVE A CATHODIC PROTECTION SYSTEM
 INSTALLED,
 AND THE SYSTEM SHALL BE MAINTAINED IN ACCORDANCE
 WITH 7.1.3.3 OR 7.1.3.6.
  
 PLEASE PROVIDE DETAILS IN COMPLIANCE.
  
  
  
 5) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
  
 6) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2020-02-25 Cont ID  
Sent By abelisle Date 2020-02-25 Time 15:45 Rev Time 0.00
Received By abelisle Date 2020-02-25 Time 13:58 Sent To  
Notes
2020-02-25 15:45:412/25/2020 REVIEWED FOR CODE COMPLIANCE (PLUMBING/GAS)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 A. BELISLE
 PLUMBING PLAN EXAMINER
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2019-07-22 Cont ID  
Sent By abelisle Date 2019-07-22 Time 07:22 Rev Time 0.00
Received By abelisle Date 2019-07-22 Time 06:55 Sent To  
Notes
2019-07-22 07:22:077/22/2019 1ST GAS REVIEW**DENIED** WITH COMMENTS NOTE -
 A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS TIME
 AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE GENERATED
 UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM
 ON THE PLAN PER 2017 FBC FUEL GAS SEC. 402.2
  
 2) SUBMIT TWO COPIES OF THE SIZING TABLE USED IN THE
 DESIGN FOR THE GAS SYSTEM OR PLACE A NOTE ON BOTH SETS
 OF PLANS LISTING THE SIZING TABLES FROM GAS CODES OR
 ANOTHER STANDARD THAT WERE USED IN THE DESIGN OF THIS
 SYSTEM 2017 FBC FUEL GAS SEC. 402.3
  
 3) SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE
 PRESSURE REGULATORS. REGULATORS INSTALLED ON THE
 EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR
 INSTALLATION. 2017 FBC FUEL GAS SEC.410.1
  
 4) THE CLAIMED VALUE INDICATED ON THE PERMIT
 APPLICATION DOES NOT MATCH THE PROVIDED BONA FIDE
 SIGNED CONTRACT. WPB AMENDMENTS TO THE FBC 109.3.
 BUILDING PERMITS VALUATIONS.
  
 5) THE GENERATOR SHALL BE ONE FOOT SIX INCHES (1?-6?)
 FROM THE HOUSE, FIVE (5?-0?) FROM THE PROPERTY LINE,
 EXHAUST SHALL BE TEN (10?-0?) FROM ANY OPENING UNLESS
 OTHERWISE STATED IN THE MANUFACTURES SPECIFICATION
 INSTRUCTIONS.
  
 6) SUBMIT TWO COPIES OF THE SURVEY INDICATING THE
 PROPOSED LOCATION OF THE NEW TANKLESS HEATER AND THE
 NEW GENERATOR. WPB AMENDMENTS TO THE FBC SEC. 107.2.1
  
  
 ATELYO BELISLE
 PLUMBING INSPECTOR /
 PLUMBING PLANS EXAMINER
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6695
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2020-03-26 Cont ID  
Sent By jgomez Date 2020-03-26 Time 17:06 Rev Time 0.00
Received By jgomez Date 2020-03-26 Time 13:54 Sent To I
Notes
2020-03-26 13:55:01RESUB ROUTED TO JGOMEZ

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2020-03-13 Cont ID  
Sent By jgomez Date 2020-03-13 Time 19:15 Rev Time 0.00
Received By jgomez Date 2020-03-13 Time 11:52 Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-03-04 Cont ID  
Sent By lmarchan Date 2020-03-04 Time 15:45 Rev Time 0.00
Received By lmarchan Date 2020-02-11 Time 13:51 Sent To  
Notes
2020-02-21 18:02:56RESUB ROUTED TO ABELISLE
2020-02-12 13:51:35RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-07-24 Cont ID  
Sent By cpuell Date 2019-07-24 Time 13:42 Rev Time 0.00
Received By cpuell Date 2019-07-12 Time 12:39 Sent To  
Notes
2019-07-15 12:39:21ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2020-02-25 Cont ID  
Sent By abelisle Date 2020-02-25 Time 15:46 Rev Time 0.00
Received By abelisle Date 2020-02-25 Time 15:46 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2019-07-22 Cont ID  
Sent By abelisle Date 2019-07-22 Time 06:54 Rev Time 0.00
Received By abelisle Date 2019-07-22 Time 06:55 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2020-02-21 Cont ID  
Sent By rfalcone Date 2020-02-21 Time 14:08 Rev Time 0.00
Received By rfalcone Date 2020-02-21 Time 14:08 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2019-07-19 Cont ID  
Sent By ajones Date 2019-07-19 Time 11:25 Rev Time 0.00
Received By ajones Date 2019-07-19 Time 11:25 Sent To  
Notes
2019-07-19 11:27:207/19/19- FAILED. SHOW LOCATION OF GENERATOR ON THE
 SURVEY.
  
 ANGELLA VANN
 561-822-1441
 [email protected]