Plan Review Details - Permit 19070276
Plan Review Stops For Permit 19070276
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-07-25 Cont ID  
Sent By rmcdouga Date 2019-07-25 Time 11:27 Rev Time 0.00
Received By rmcdouga Date 2019-07-25 Time 11:27 Sent To Z
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2019-07-23 Cont ID  
Sent By fgiaquin Date 2019-07-23 Time 06:55 Rev Time 0.00
Received By fgiaquin Date 2019-07-23 Time 06:52 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2019-08-04 Cont ID  
Sent By abelisle Date 2019-08-04 Time 05:16 Rev Time 0.00
Received By abelisle Date 2019-08-04 Time 05:16 Sent To I
Notes
2019-08-04 08:50:198/4/19 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 ATELYO BELISLE
 PLUMBING PLANS EXAMINER
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2019-07-23 Cont ID  
Sent By abelisle Date 2019-07-10 Time 07:11 Rev Time 0.00
Received By abelisle Date 2019-07-10 Time 06:09 Sent To  
Notes
2019-07-10 07:19:317/10/19 DENIED
  
 THE GENERATOR SHALL BE ONE FOOT SIX INCHES (1?-6?) FROM
 THE HOUSE, FIVE (5?-0?) FROM THE PROPERTY LINE, EXHAUST
 SHALL BE TEN (10?-0?) FROM ANY OPENING UNLESS OTHERWISE
 STATED IN THE MANUFACTURES SPECIFICATION INSTRUCTIONS.
  
 SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO THE
 APPLIANCE. COMPLY WITH 2017 FBC FUEL GAS TABLE 402.4
 (28) OR 2017 FBC FUEL GAS RES.TABLE G2413.4 (12)
 SCHEDULE 40 METALLIC PIPE FOR THE PROPER PIPE SIZE AND
 BTU LOAD.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION
  
 ATELYO BELISLE
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6695
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-08-04 Cont ID  
Sent By cpuell Date 2019-08-04 Time 10:04 Rev Time 0.00
Received By cpuell Date 2019-08-01 Time 14:01 Sent To  
Notes
2019-08-02 14:01:50RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-07-30 Cont ID  
Sent By cpuell Date 2019-07-30 Time 10:20 Rev Time 0.00
Received By cpuell Date 2019-07-08 Time 14:03 Sent To  
Notes
2019-07-09 14:04:12ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 1 Status P Date   Cont ID  
Sent By   Date 2019-07-29 Time   Rev Time 0.00
Received By pgreilic Date 2019-07-29 Time 14:36 Sent To  
Notes
2019-07-29 14:37:57LANDSCAPE SCREENING REQUIRED
  
 PAUL GREILICH, SENIOR PLANNER
 561-822-1443
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved