Review Stop G GAS REVIEW
Rev No 4 Status P Date 2020-02-06 Cont ID  
Sent By gjohnson Date 2020-02-06 Time 14:50 Rev Time 0.00
Received By gjohnson Date 2020-02-06 Time 14:50 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 3 Status F Date 2020-01-28 Cont ID  
Sent By tklarge Date 2020-01-28 Time 14:09 Rev Time 0.00
Received By tklarge Date 2020-01-28 Time 13:16 Sent To  
Notes
2020-01-28 14:09:001) THE GAS PLAN NOTES AN EXISTING LP UNDERGROUND TANK
 BUT TANK SPECIFICATIONS/DETAILS HAVE BEEN UPLOADED. IF
 THIS IS AN EXISTING TANK WHY ARE DETAILS FOR A NEW TANK
 BEING SUBMITTED? IF THESE DETAILS DO NOT APPLY THEN
 REMOVE THEM FROM THE SUBMITTAL. WPB AMEND. TO FBC SEC.
 107.2.1.
 2) TWO DIFFERENT MANUFACTURER'S SPECIFICATIONS HAVE
 BEEN SUBMITTED FOR THE FIRST AND SECOND STAGE
 REGULATORS. WHICH ONES ARE BEING INSTALLED? REMOVE THE
 DOCUMENTS FROM THIS SUBMITTAL THAT DO NOT APPLY.WPB
 AMEND. TO FBC SEC. 107.2.1.
 3) THE SUBMITTED LINE DIAGRAM NOTES THE BTU LOAD OF THE
 BBQ AS 35,000 BUT THE MANUFACTURER'S SPECIFICATIONS
 SHOWS BTU VALUES OF 62,000, 89,000 AND 118,000.
 IDENTIFY THE MODEL OF THE BBQ BEING INSTALLED AND THE
 CORRECT BTU LOAD. 2017 FBC-RES. SEC. G2413.3, G2413.4
 AND TABLES G2413.4 (1 ) THROUGH G2413.4 (21).
 4) THE MANUFACTURER'S SPECIFICATIONS FOR THE MOSQUITO
 MAGNET SPECIFY THAT THE UNIT SHOULD BE CONNECTED TO A
 MAXIMUM 20 LB. LP GAS CYLINDER/CONTAINER. I CONTACTED
 THE MANUFACTURER AND SPOKE TO ONE OF THEIR SERVICE
 REPRESENTATIVES WHO EXPLAINED THAT THIS UNIT IS NOT
 RECOMMENDED TO BE CONNECTED TO A CYLINDER LARGER THAN
 20 LBS. BECAUSE IT WAS NOT TESTED IN THAT MANNER.
 THEREFORE, THIS UNIT IS NOT PERMITTED TO BE CONNECTED
 TO THIS GAS SYSTEM.
 5) A GAS SIZING TABLE FOR LOW PRESSURE PE PIPE HAS BEEN
 SUBMITTED BUT THE LINE DIAGRAM SHOWS ALL THE PE PIPING
 BEING UNDER AN ELEVATED PRESSURE . CLARIFY.
 6) SHOW THE DISTANCE FROM THE MP REGULATORS TO ALL THE
 APPLIANCES. 2017 FBC-RES. SEC. G 2413.4.1, G2413.4.2.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2019-12-16 Cont ID  
Sent By shill Date 2019-12-16 Time 06:57 Rev Time 0.00
Received By shill Date 2019-12-10 Time 17:35 Sent To  
Notes
2019-12-16 06:57:48GAS 2ND REVIEW**DENIED**19070210** IT HELPS TO SUPPLY A
 NARRATIVE WHEN RESPONDING TO THE COMMENTS
  
 1) YOU ARE PROVIDING MANUFACTURE MANUALS FOR NEW L.P
 TANK BUT CALL OUT TANK AS EXISTING. PLEASE CLARIFY 2ND
 REQUEST. FBC 107.2.1
 2) VALUE SEEMS LOW. PLEASE PROVIDE A SIGNED BONA FIDE
 CONTRACT. VALUE MUST INCLUDE ALL NEW EQUIPMENT. FBC
 109.3
 3) PROVIDE MANUFACTURE MANUALS SHOWING REGULATORS
 COMPLY WITH FBC-GAS AND ARE ANSI Z21.80 APPROVED.
 FBC-GAS 410.1
 4) PLEASE PROVIDE WHICH MODEL OF GAS REGULATOR YOU ARE
 USING. MANUFACTURE MANUAL PROVIDE SHOWS 8 DIFFERENT
 MODELS. FBC 107.2.1
 5) PROVIDE MANUFACTURES INSTALL MANUALS FOR ALL NEW
 EQUIPMENT BEING INSTALLED. FBC 107.3.5 2ND REQUEST.
 6) PROVIDE SURVEY SHOWING LOCATION OF EQUIPMENT ON
 PROPERTY INCLUDING NEW L.P TANK. FBC 107.3.5 2ND
 REQUEST
 7) SHOW THE DISTANCE FROM THE 2PSI REGULATORS TO ALL
 APPLIANCES. FBC-RES GAS G2413.4.1, G2413.4.2. 2ND
 REQUEST
 8) WHERE CONNECTED TO RIDGED PIPING A UNION SHALL BE
 INSTALLED WITHIN 1 FOOT OF EITHER SIDE OF THE MP
 REGULATOR. FBC-GAS 410.2. 2ND REQUEST.
  
 TIM HUNT
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH (CGA SOLUTIONS)
 THUNT@CGASOLUTIONS
 561-248-2703
  
  
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2019-08-05 Cont ID  
Sent By tklarge Date 2019-08-05 Time 11:38 Rev Time 0.00
Received By tklarge Date 2019-08-05 Time 06:03 Sent To  
Notes
2019-08-05 09:32:021) SUBMIT MANUFACTURER'S SPECIFICATIONS AND
 INSTALLATION INSTRUCTIONS FOR THE PRESSURE REGULATORS.
 REGULATORS INSTALLED ON THE EXTERIOR OF THE BUILDING
 SHALL BE APPROVED FOR OUTDOOR INSTALLATION. IDENTIFY ON
 THE SPECIFICATION SHEETS WHICH MODEL REGULATOR IS BEING
 INSTALLED AND THE ORIFICE SIZE TO ENSURE THE REGULATOR
 CAN ACCOMMODATE THE BTU LOAD THROUGH THE REGULATOR.2017
 FGC SEC.410.1, 2017 FBC-RES. SEC. G2421.1. YOU HAVE
 ONLY SUBMITTED ONE SPECIFICATION SHEET FOR EACH
 REGULATOR.
 2) THE APPLICATION NOTES THAT TIKKI TORCHES ARE TO BE
 INSTALLED YET THE TIKKI TORCHES ARE NOT SHOWN ON THE
 GAS DRAWING. THE TIKKI TORCHES SHALL BE SHOWN ON THE
 GAS DRAWING ALONG WITH THE LENGTH OF ALL PIPING AND THE
 PLAN SHALL CLEARLY SHOW THE LENGTH OF ALL CUT SECTIONS
 OF PIPE PER 2017 FBC-FUEL GAS, SECS. 402.4.1, 402.4.2.
 OR 2017 FBC-R SEC. G2413.4.1, G2413.4.2.
 3) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED FOR
 THE TIKKI TORCHES AND THE SECOND MOUSQUITO TRAP AND ALL
 PIPE SIZES. WPB AMEND. TO FBC SEC. 107.2.1.
 4) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL
 BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC-FUEL GAS
 SECS.401.8, 402.2, AND TABLES 402.4 (1) THRU 402.4 (37)
 OR 2017 FBC-RES. SEC. G2413.3, G2413.4 AND TABLES
 G2413.4 (1 ) THROUGH G2413.4 (21).
 5) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS
 METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2017
 FBC-FUEL GAS SEC.402.4.1, 402.4.2, OR 2017 FBC-RES.
 SEC. G 2413.4.1, G2413.4.2.
 6) SUBMIT TWO COPIES OF THE MANUFACTURER'S
 SPECIFICATION SHEETS / INSTALLATION MANUAL FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA 54,
 NFPA 58, AND FBC-2017 FUEL GAS CODE SEC. 402.2, AND
 301.3 OR 2017 FBC-RES. SEC. G2404.3. GAS APPLIANCES
 SHALL BE LISTED AND LABELED. THE INSTALLATION MANUALS
 FOR ALL GAS APPLIANCES / EQUIPMENT SHALL BE ONSITE AT
 THE TIME OF INSPECTION. FGC SEC.305.1, FBC-RES.
 SEC.G2408.1.
 7) SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS.
 A LISTED SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY
 AHEAD OF EACH MP REGULATOR. 2017 FBC-FUEL GAS
 SEC.409.4, FBC-RESIDENTIAL SEC. G 2420.4.
 8) THE PLAN NOTES THAT TWO MOSQUITO TRAPS WILL BE
 INSTALLED BUT ONLY ONE IS SHOWN ON THE GAS DRAWING AND
 NOTED ON THE PERMIT APPLICATION. CLARIFY.
 9) SUBMIT A SURVEY/SITE PLAN SHOWING THE LOCATION OF
 THE MOSQUITO TRAPS AND ALSO THE TIKKI TORCHES.WPB
 AMEND. TO FBC SEC. 107.2.1.
 10) THE PLANS INDICATE AN EXISTING LP TANK AND CITY
 RECORDS SHOW AN EXISTING GAS SYSTEM FOR THIS ADDRESS.
 THE BTU LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED
 INTO THE TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE
 EXISTING SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE
 EXISTING SYSTEM MUST BE REDONE TO ENSURE A SAFE
 OPERATING SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM
 THAT SHOWS THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD
 OF EACH APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO
 EACH APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH
 OF PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE
 OUTLET AND THE LOAD OF THE SECTION. FGC SECS. 401.4,
 401.8, 402.1, 402.2, 402.3 OR FBCR SECS.G2412.4,
 G2412.8, G2413.1, G2413.2, G2413.3.
 11) SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO ALL
 APPLIANCES. COMPLY WITH 2017 FBC-FUEL GAS SEC. 402.4.1
 OR 2017 FBC-RES. SEC. G2413.4.1, G2413.4.2 FOR THE
 PROPER PIPE SIZE AND BTU LOAD.
 12) SHOW THE DISTANCE FROM THE GAS METER TO THE MOST
 REMOTE REGULATOR ON THE SYSTEM.
 13) WHERE CONNECTED TO RIDGID PIPING, A UNION SHALL BE
 INSTALLED WITHIN ONE FOOT OF EITHER SIDE OF THE MP
 REGULATOR. 2017 FBC-FUEL GAS SEC. 410.2 (7).
 14) THE SUBMITTED MANUFACTURER'S SPECIFICATIONS FOR THE
 REGULATORS DO NOT CORRELATE WITH THE REGULATORS NOTED
 ON THE GAS DRAWING. CLARIFY.
 15) DOCUMENTS HAVE BEEN SUBMITTED FOR THE MAGNESIUM
 ANODE, ANCHORING OF THE UNDERGROUND LP TANK, AND TANK
 DATA SHEET. IF YOU ARE CONNECTING TO AN EXISTING LP
 TANK, WHY ARE THESE DOCUMENTS BEING SUBMITTED? CLARIFY.
 16)THE DOCUMENTS THAT HAVE BEEN SUBMITTED FOR THE LP
 TANK ANCHORING BEAR A COPIED ENGINEER'S SIGNATURE AND
 SEAL. DOCUMENTS THAT ARE BEING SUBMITTED FOR PUBLIC
 RECORD MUST BEAR THE ORIGINAL SEAL AND SIGNATURE OF THE
 ENGINEER PER THE FL. ADMIN. CODE RULE 61G15-23.001.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY
 REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED
 SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD
 SHEETS.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2020-02-06 Cont ID  
Sent By gjohnson Date 2020-02-06 Time 14:50 Rev Time 0.00
Received By gjohnson Date 2020-01-30 Time 14:25 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2020-01-28 Cont ID  
Sent By lmarchan Date 2020-01-28 Time 14:12 Rev Time 0.00
Received By lmarchan Date 2020-01-27 Time 11:52 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-12-16 Cont ID  
Sent By shill Date 2019-12-16 Time 07:34 Rev Time 0.00
Received By shill Date 2019-11-22 Time 08:56 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-08-05 Cont ID  
Sent By lmarchan Date 2019-08-05 Time 11:42 Rev Time 0.00
Received By lmarchan Date 2019-07-03 Time 09:07 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status N Date 2020-02-06 Cont ID  
Sent By gjohnson Date 2020-02-06 Time 14:50 Rev Time 0.00
Received By gjohnson Date 2020-02-06 Time 14:50 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status N Date 2020-01-28 Cont ID  
Sent By tklarge Date 2020-01-28 Time 14:09 Rev Time 0.00
Received By tklarge Date 2020-01-28 Time 14:09 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2019-12-16 Cont ID  
Sent By shill Date 2019-12-16 Time 06:57 Rev Time 0.00
Received By shill Date 2019-12-10 Time 17:35 Sent To  
Notes
2019-12-16 06:58:10SEE GAS COMMENTS, REVIEWED REMOTELY BY TIM HUNT
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status N Date 2020-01-28 Cont ID  
Sent By tklarge Date 2020-01-28 Time 14:09 Rev Time 0.00
Received By tklarge Date 2020-01-28 Time 14:09 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2019-12-16 Cont ID  
Sent By shill Date 2019-12-16 Time 07:27 Rev Time 0.00
Received By shill Date 2019-12-16 Time 07:27 Sent To  
Notes
2019-12-16 07:29:35****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 1. FBC 107, THE SPEC SHEETS SHOULD BE IN THE SUPPORTING
 DOCUMENTS FILE, PLAN PAGES SHOULD BE IN THE DRAWINGS
 FOLDER. REFER TO PROJECTDOX QUICK START GUIDE AND
 COORDINATE WITH [email protected].
  
 2. THE DOCUMENT PREVIOUS SIGNED AND SEALED BY ERIC J.
 SVOBODA, PE (FORT PIERCE ENGINEERING, INC.) HAS NOW
 BEEN SUPERSEDED WITH A DOCUMENT WITH THE ENGINEER'S
 INFORMATION REMOVED, BUT NO INFORMATION AS TO WHO IS
 TAKING RESPONSIBILITY FOR THE DESIGN, SEE FBC 107. SEE
 ALSO FAC61G15-23 REGARDING SUCCESSOR ENGINEERS (A
 CERTIFIED LETTER TO THE ORIGINAL ENGINEER ADVISING THAT
 HIS WORK IS BEING USED IS REQUIRED).
  
  
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2019-08-05 Cont ID  
Sent By tklarge Date 2019-08-05 Time 11:39 Rev Time 0.00
Received By tklarge Date 2019-08-05 Time 11:38 Sent To  
Notes
2019-08-05 11:40:35LP TANK ANCHORING DETAILS HAVE COPY OF ENGINEER'S SEAL.
 IF DOCUMENT IS TO BE PART OF THIS SUBMITTAL AN
 ELECTORNIC SIGNATURE IS REQD. PER FAC.RULE
 61G-15-23.004 & 61G15-23.005.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved