| Plan Review Stops For Permit 19070092 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2019-08-16 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2019-08-16 |
Time |
13:56 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2019-08-16 |
Time |
13:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2019-07-26 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2019-07-26 |
Time |
08:52 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2019-07-25 |
Time |
18:21 |
Sent To |
|
|
| Notes |
| 2019-07-26 08:55:15 | REVISION SECOND BUILDING REVIEW CHECKLIST. | | | FBC 6TH EDITION (2017). | | | | | | ORIGINAL COMMENT: | | | 1- CHECK IN DESK WAS REVISED. PLEASE REVISE HEIGHT OF | | | CHECK-IN DESK TO SHOW COMPLIANCE WITH SEC. 904.4 | | | FBC-ACCESSIBILITY. | | | | | | RESPONSE: | | | PROPOSED REVISED COUNTER SHOWN ON SHEET A4.2 (SHEET 012 | | | A403 ON DOWNLOADED DIGITAL DRAWING) DOESN'T COMPLY WITH | | | SEC. 904.4 FBC-ACCESSIBILITY. THE LENGTH OF THE COUNTER | | | DOESN'T COMPLY WITH EITHER SEC. 904.4.1 OR SEC. | | | 904.4.2. PLEASE REVISE AS REQUIRED. CLEARLY SHOW IF THE | | | COUNTER IS FOR PARALLEL APPROACH OR FORWARD APPROACH. | | | NOTE: PLEASE REVISE THE EQUIPMENT FLOOR PLAN TO REFLECT | | | ANY CHANGES ON THIS COUNTER. | | | | | | | | | | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW | | | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION | | | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE | | | THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR | | | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2019-07-15 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2019-07-15 |
Time |
10:11 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2019-07-12 |
Time |
15:36 |
Sent To |
|
|
| Notes |
| 2019-07-15 10:11:30 | REVISION BUILDING REVIEW COMMENTS. | | | FBC 6TH EDITION (2017). | | | | | | 1- CHECK IN DESK WAS REVISED. PLEASE REVISE HEIGHT OF | | | CHECK-IN DESK TO SHOW COMPLIANCE WITH SEC. 904.4 | | | FBC-ACCESSIBILITY. | | | | | | | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW | | | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION | | | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE | | | THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR | | | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2019-08-08 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2019-08-08 |
Time |
10:47 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2019-08-08 |
Time |
10:46 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2019-07-23 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2019-07-23 |
Time |
09:14 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2019-07-23 |
Time |
09:14 |
Sent To |
|
|
| Notes |
| 2019-07-23 09:15:13 | PLANS NOT STAMPED UNTIL SIGNATURE ISSUE RESOLVED. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2019-07-14 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2019-07-14 |
Time |
10:44 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2019-07-14 |
Time |
10:44 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2019-07-22 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2019-07-22 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2019-07-22 |
Time |
09:24 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2019-07-05 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2019-07-05 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2019-07-05 |
Time |
13:13 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2019-08-16 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2019-08-16 |
Time |
14:09 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2019-08-06 |
Time |
08:20 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2019-08-05 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2019-08-05 |
Time |
08:26 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2019-07-18 |
Time |
08:00 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2019-07-15 |
Time |
|
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2019-07-02 |
Time |
12:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
P |
Date |
2019-08-13 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2019-08-13 |
Time |
08:57 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2019-08-13 |
Time |
08:57 |
Sent To |
|
|
| Notes |
| 2019-08-13 09:00:59 | 3RD MECHANICAL REVIEW | | | APPROVED BY CHRIS COLE (REMOTELY) |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2019-08-02 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2019-08-02 |
Time |
16:35 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2019-08-02 |
Time |
16:35 |
Sent To |
|
|
| Notes |
| 2019-08-02 16:36:46 | PASSED PER CHRIS COLE (WORKING REMOTELY) |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2019-07-15 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2019-07-15 |
Time |
16:10 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2019-07-15 |
Time |
15:24 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2019-08-16 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2019-08-16 |
Time |
14:09 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2019-08-16 |
Time |
14:09 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2019-07-27 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2019-07-27 |
Time |
10:17 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2019-07-27 |
Time |
09:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2019-07-08 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2019-07-08 |
Time |
14:00 |
Rev Time |
0.00 |
| Received By |
thunt |
Date |
2019-07-08 |
Time |
12:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2019-08-16 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2019-08-16 |
Time |
14:09 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2019-08-16 |
Time |
14:09 |
Sent To |
|
|
| Notes |
| 2019-08-08 10:47:27 | ELECTRICAL SHEETS OK. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2019-08-05 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2019-08-05 |
Time |
08:26 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2019-08-05 |
Time |
08:24 |
Sent To |
|
|
| Notes |
| 2019-07-23 09:14:38 | ELECTRICAL SHEETS: PER THE WPB AMENDMENTS TO THE FBC, | | | EACH SHEET OF PLAN IS REQUIRED TO BE SIGNED AND SEALED | | | BY THE PERSON RESPONSIBLE FOR THE DESIGN. A DIGITAL | | | PLAN REQUIRES A DIGITAL SIGNATURE WITH THE PROPER THIRD | | | PARTY VERIFICATION. SELF-CERTIFICATION IS NOT | | | ACCEPTABLE FOR ENGINEERS. ADDITIONALLY, THE DIGITAL | | | SIGNATURE MUST INCLUDE THE STATEMENT "SIGNED AND | | | SEALED" AS PER FAC 61G15-23.004. PROVIDE CORRECTION. | | | WPB FBC 107.1; FS 471/481 |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2019-07-15 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2019-07-15 |
Time |
15:15 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2019-07-15 |
Time |
15:15 |
Sent To |
|
|
| Notes |
| 2019-07-25 18:35:53 | ARCHITECT'S SIGNATURE OK. JG | | 2019-07-15 15:17:31 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | MEP PAGES ARE SIGNED BY "DOCUSIGN"; IDENTITY OF THE | | | PERSON SEALING THE PLAN IS NOT CLEAR, FAC61G15-23.004. | | | | | | | | 2019-07-15 10:17:34 | ARCHITECTURAL SHEETS ARE OK. . JG. | | 2019-07-14 10:46:39 | ELECTRICAL SHEETS: PER THE WPB AMENDMENTS TO THE FBC, | | | EACH SHEET OF PLAN IS REQUIRED TO BE SIGNED AND SEALED | | | BY THE PERSON RESPONSIBLE FOR THE DESIGN. A DIGITAL | | | PLAN REQUIRES A DIGITAL SIGNATURE WITH THE PROPER THIRD | | | PARTY VERIFICATION. SELF-CERTIFICATION IS NOT | | | ACCEPTABLE FOR ENGINEERS. ADDITIONALLY, THE DIGITAL | | | SIGNATURE MUST INCLUDE THE STATEMENT "SIGNED AND | | | SEALED" AS PER FAC 61G15-23.004. PROVIDE CORRECTION. | | | WPB FBC 107.1; FS 471/481 |
|
|