| Plan Review Stops For Permit 19061433 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2019-07-12 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-07-12 |
Time |
15:24 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-07-12 |
Time |
14:32 |
Sent To |
|
|
| Notes |
| 2019-07-12 15:25:50 | POOL IS LOCATED IN A SPECIAL FLOOD HAZARD AREA. THE | | | POOL EQUIPMENT IS REQUIRED TO BE LOCATED AT OR ABOVE | | | THE FINISH FLOOR ELEVATION OF THE HOUSE. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2019-08-14 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-08-14 |
Time |
09:19 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-08-14 |
Time |
09:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2019-07-12 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-07-12 |
Time |
11:37 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-07-12 |
Time |
11:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2019-07-08 |
|
|
Cont ID |
|
| Sent By |
thunt |
Date |
2019-07-08 |
Time |
07:42 |
Rev Time |
0.00 |
| Received By |
thunt |
Date |
2019-07-08 |
Time |
06:39 |
Sent To |
|
|
| Notes |
| 2019-07-08 07:42:32 | A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL | | | PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT | | | THIS TIME. A SEPARATE GAS PERMIT IS REQUIRED FOR A | | | CONTRACTOR TO PERFORM THE RELATED WORK. PROVIDE | | | COMPLETE PLANS THAT REFLECT THE ENTIRE SCOPE OF GAS | | | WORK TO BE DONE. WPB AMEND. TO FBC SEC.107.2.1. | | | | | | |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
1 |
Status |
P |
Date |
2019-08-12 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2019-08-12 |
Time |
12:48 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2019-08-12 |
Time |
12:48 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2019-09-13 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2019-09-13 |
Time |
07:00 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2019-09-11 |
Time |
13:42 |
Sent To |
|
|
| Notes |
| 2019-09-12 13:42:23 | RESUB ROUTED TO TKLARGE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2019-08-29 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2019-08-29 |
Time |
15:15 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2019-08-22 |
Time |
11:47 |
Sent To |
|
|
| Notes |
| 2019-08-22 11:48:43 | RESUB ROUTED HISTORIC INBOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2019-08-14 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-08-14 |
Time |
09:19 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-07-29 |
Time |
15:36 |
Sent To |
|
|
| Notes |
| 2019-07-30 15:36:48 | RESUB ROUTED TO ZONING INBOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2019-07-12 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-07-12 |
Time |
15:24 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-06-28 |
Time |
10:51 |
Sent To |
|
|
| Notes |
| 2019-07-01 10:51:55 | ROUTED TO ZONING INBOX |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
4 |
Status |
P |
Date |
2019-09-13 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2019-09-13 |
Time |
07:00 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2019-09-13 |
Time |
06:29 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
F |
Date |
2019-08-29 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2019-08-29 |
Time |
15:15 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2019-08-29 |
Time |
14:19 |
Sent To |
|
|
| Notes |
| 2019-08-29 14:41:35 | 1) THE PUMP CURVE AND PRINTING THAT IS ON SHT. 3 0F 4 | | | IS ILLEGIBLE.SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP | | | CURVE. IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS | | | SPECIFIC TO THE PUMP BEING INSTALLED ON THIS POOL. THIS | | | IS NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE | | | TDH CALCULATIONS. ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, | | | 4.4.9.1. | | | 2) GAS FIRED POOL HEATERS SHALL HAVE A MINIMUM THERMAL | | | EFFICIENCY OF 82% PER THE 2017 FBC-ENERGY SEC. | | | R403.10.4. THE SUBMITTED SPECS DO NOT SHOW THIS. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2019-08-13 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2019-08-13 |
Time |
09:47 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2019-08-13 |
Time |
09:01 |
Sent To |
|
|
| Notes |
| 2019-08-13 09:47:02 | 1) SUBMIT TWO COPIES OF MANUFACTURER'S SPECIFICATIONS | | | FOR THE POOL HEATER THAT SHOWS THE HEATER HAS A THERMAL | | | EFFICIENCY OF AT LEAST 82% PER THE 2017 FBC- ENERGY | | | SEC.R403.10.4. | | | 2) SUBMIT TWO COPIES OF AN ENLARGED POOL PUMP CURVE. | | | THE PRINTING IS ILLEGIBLE ON THE PLANS. IDENTIFY ON THE | | | PUMP CURVE WHICH CURVE KEY IS SPECIFIC TO THE PUMP | | | BEING INSTALLED ON THIS POOL. THIS IS NEEDED TO CONFIRM | | | THE MAXIMUM SYSTEM FLOW FROM THE TDH CALCULATIONS. | | | 3) SUBMIT LEGIBLE TOTAL DYNAMIC HEAD CALCULATIONS. THE | | | PRINTING IS BARELY LEGIBLE. WPB AMEND. TO FBC SEC. | | | 107.2.1. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2019-07-08 |
|
|
Cont ID |
|
| Sent By |
thunt |
Date |
2019-07-08 |
Time |
07:47 |
Rev Time |
0.00 |
| Received By |
thunt |
Date |
2019-07-08 |
Time |
06:39 |
Sent To |
|
|
| Notes |
| 2019-07-08 07:47:00 | PLUMBING 1ST REVIEW**DENIED** | | | | | | 1) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE | | | MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM | | | ITS PUMP CURVE AND THE SIMPLIFIED TOTAL DYNAMIC HEAD | | | CALCULATION IS NO LONGER ALLOWED TO BE USED IN | | | DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC | | | 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION | | | ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT | | | REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED | | | THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET | | | FITTING ASSEMBLY (DRAIN COVER).THE TDH CALCULATIONS | | | MUST INCLUDE ALL OF THE SYSTEM COMPONENTS INCLUDING | | | SUCTION AND RETURN PIPING, FITTINGS, VALVES, HEATER, | | | FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS EXCEPT | | | THE PUMP. | | | | | | 2) IINDICATE ON THE PUMP CURVE WHICH CURVE KEY IS FOR | | | THE PUMP BEING INSTALLED ON THIS SYSTEM. WPB AMEND. TO | | | FBC SEC. 107.2.1. | | | | | | 3) SHT. 3 MAIN DRAIN GPM DOES NOT MATCH MANUFACTURES | | | MANUAL. PLEASE CALL OUT WICH MAIN DRAIN ON THE | | | INSTALLATION MANUAL YOU ARE USING. FBC 107.2.1 | | | | | | TIM HUNT | | | PLUMBING PLANS EXAMINER/ PLUMBING INSPECTOR | | | CITY OF WEST PALM BEACH | | | 561-248-2703 | | | [email protected] | | | | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2019-08-26 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2019-08-26 |
Time |
16:44 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2019-08-26 |
Time |
16:44 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2019-08-12 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2019-08-12 |
Time |
12:48 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2019-08-01 |
Time |
13:53 |
Sent To |
|
|
| Notes |
| 2019-08-12 12:49:30 | INCLUDE DIMENSION OF SETBACKS INCLUDING WATER | | | FEATURE/BASIN. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2019-07-02 |
|
|
Cont ID |
|
| Sent By |
ajones |
Date |
2019-07-02 |
Time |
17:05 |
Rev Time |
0.00 |
| Received By |
ajones |
Date |
2019-07-02 |
Time |
17:05 |
Sent To |
|
|
| Notes |
| 2019-07-02 17:07:54 | 7/2/19- FAILED. PLEASE SHOW POOL SETBACK FOR PROPERTY | | | LINE ON SURVEY. MINIMUM SETBACK FROM FLAGLER DRIVE | | | (CORNER SIDE) IS 12.6 FEET. | | | | | | ANGELLA VANN, AICP | | | 561-822-1441 | | | [email protected] |
|
|