Plan Review Details - Permit 19060907
Plan Review Stops For Permit 19060907
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-10-10 Cont ID  
Sent By pvalenti Date 2019-10-10 Time 07:40 Rev Time 0.00
Received By pvalenti Date 2019-10-10 Time 07:40 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-08-16 Cont ID  
Sent By pvalenti Date 2019-08-16 Time 13:19 Rev Time 0.00
Received By pvalenti Date 2019-08-16 Time 13:18 Sent To  
Notes
2019-08-16 13:20:17PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
 FBC M = FBC MECHANICAL
  
 BUILDING REVIEW APPROVED WITH PROVISO:
  
 AWS D1.1 CLAUSE 3.1: AT TIME OF INSPECTION PLEASE
 PROVIDE A WELD PROCEDURE SPECIFICATION; THE W.P.S.
 SPECIFIES THE REQUIRED ESSENTIAL VARIABLES INCLUDING:
 BASE MATERIALS, JOINTS, PROCESS, AND FILLER METALS TO
 BE USED.
 AWS D1.1 CLAUSE 4.15: AT TIME OF INSPECTION PLEASE
 PROVIDE A WELDER PERFORMANCE QUALIFICATION RECORD; THE
 W.P.Q.R. PROVIDES INFORMATION WHICH CAN BE USED TO
 VERIFY THE WELDER?S QUALIFICATION AND CERTIFICATION AS
 IT RELATES TO THE WELDING REQUIREMENTS OF THE PROJECT.
  

Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2019-10-09 Cont ID  
Sent By rrossano Date 2019-10-09 Time   Rev Time 0.00
Received By rrossano Date 2019-10-09 Time   Sent To B
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2019-09-13 Cont ID  
Sent By rrossano Date 2019-09-13 Time   Rev Time 0.00
Received By   Date 2019-09-13 Time   Sent To I
Notes
2019-09-13 07:02:40PASSED WITH PROVISO: PLEASE ADDRESS ZONING COMMENTS.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2019-07-22 Cont ID  
Sent By rrossano Date 2019-07-22 Time   Rev Time  
Received By rrossano Date 2019-07-22 Time   Sent To B
Notes
2019-07-22 15:15:30PLEASE ADDRESS ZONING COMMENTS.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO
 PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1098
 FAX: (561) 494-1116
 MOBILE: (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 MANNY GONZALEZ
 SENIOR ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2019-10-10 Cont ID  
Sent By pvalenti Date 2019-10-10 Time 07:40 Rev Time 0.00
Received By pvalenti Date 2019-09-16 Time 09:29 Sent To  
Notes
2019-09-18 09:30:09RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-09-13 Cont ID  
Sent By cpuell Date 2019-09-13 Time 12:55 Rev Time 0.00
Received By cpuell Date 2019-08-16 Time 13:42 Sent To  
Notes
2019-09-12 07:40:319/12 TO ENGINEERING
2019-08-16 13:42:39TO JR DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-08-16 Cont ID  
Sent By pvalenti Date 2019-08-16 Time 13:12 Rev Time 0.00
Received By pvalenti Date 2019-08-16 Time 13:12 Sent To  
Notes
2019-06-20 15:19:24ROUTED TO ZONING INBOX

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status N Date 2019-10-10 Cont ID  
Sent By pvalenti Date 2019-10-10 Time 07:39 Rev Time 0.00
Received By pvalenti Date 2019-10-10 Time 07:39 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2019-09-12 Cont ID  
Sent By shill Date 2019-09-12 Time 07:38 Rev Time 0.00
Received By shill Date 2019-09-12 Time 07:38 Sent To  
Notes
2019-09-12 07:40:12****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. THE PLANS SUBMITTED ARE NOT SIGNED AND SEALED.
 EITHER RESUBMIT ORIGINAL SIGNED AND SEALED PLANS OR,
 AFTER ALL REVIEWS HAVE PASSED, SEND A DIGITALLY SIGNED
 PLAN VIA EMAIL.
  
  

Review Stop Z ZONING
Rev No 3 Status P Date 2019-10-07 Cont ID  
Sent By jroach Date 2019-10-07 Time 13:40 Rev Time 0.00
Received By jroach Date 2019-10-07 Time 13:40 Sent To ENG
Notes
2019-10-07 13:40:29ZONING PLAN REVIEW
 ________________________________________
  
 DATE OF REVIEW: 10.07.2019
 PERMIT NO.: 19060907
 ________________________________________
  
 REVIEW STATUS: PASSED WITH PROVISOS
 ________________________________________
  
 THIS REVIEW HAS BEEN PASSED SUBJECT TO THE FOLLOWING
 PROVISOS:
  
 1. PRIOR TO THE ISSUANCE OF A CERTIFICATE OF
 COMPLETION:
  
 1.1. AN UPDATED FDEP PERMIT AND ARMY CORPS APPROVAL
 SHALL BE PROVIDED APPROVING THE SCOPE OF WORK PROPOSED
 AS PART OF THIS PERMIT. IF FDEP AND/OR ARMY CORPS
 APPROVALS ARE NOT REQUIRED FOR THE SCOPE OF THIS
 PERMIT, DOCUMENTATION SHALL BE PROVIDED INDICATING
 SUCH.
  
 1.2. A REVISION SHALL BE SUBMITTED TO PROVIDE A SITE
 PLAN SHOWING THE OVERALL CMPD, ALONG WITH THE LOCATION
 OF THE PROPOSED IMPROVEMENTS (IDENTIFY THE LIMIT OF
 WORK). THE SITE PLAN SHALL BE PROVIDED AT A LARGE
 ENOUGH SCALE SO THAT IT IS LEGIBLE.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
 TTY: 800.955.8771
 E: [email protected]
  
 W: WPB.ORG
  

Review Stop Z ZONING
Rev No 2 Status F Date 2019-09-11 Cont ID  
Sent By jroach Date 2019-09-11 Time 15:24 Rev Time 0.00
Received By jroach Date 2019-08-20 Time 13:22 Sent To  
Notes
2019-09-11 15:32:05ZONING PLAN REVIEW
 ________________________________________
  
 DATE OF REVIEW: 09.11.2019
 PERMIT NO.: 19060907
 ________________________________________
  
 REVIEW STATUS: FAILED
 ________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN
 REVIEW COMMENTS:
  
 1. [ PARTIALLY SATISFIED ] - PURSUANT TO RESOLUTION NO.
 185-18, PRIOR TO THE ISSUANCE OF A BUILDING PERMIT FOR
 ANY NEW DOCK CONSTRUCTION, THE APPLICANT SHALL RECEIVE
 PERMITS FROM THE FLORIDA DEPARTMENT OF ENVIRONMENTAL
 PROTECTION (FDEP) AND THE U.S. ARMY CORPS OF ENGINEERS
 (ACOE). ALL PLANS ASSOCIATED WITH THE FDEP AND ACOE
 PERMITS SHALL BE IN SUBSTANTIAL CONFORMANCE WITH THE
 PLANS APPROVED HEREIN. THESE PERMITS ALSO CONTAIN
 CONDITIONS OF APPROVAL SATISFYING THE APPLICANT?S
 NECESSARY COMPLIANCE WITH THE CITY?S ZONING AND LAND
 DEVELOPMENT REGULATIONS. IN ANY EVENT WHERE THE FDEP OR
 ACOE PERMITS REQUIRE A MODIFICATION TO THE PLANS OR
 CONDITIONS OF APPROVAL, THE MODIFICATION SHALL BE
 REVIEWED BY THE CITY AND AN AMENDMENT TO THE PLANNED
 DEVELOPMENT MAY BE REQUIRED, AT THE DISCRETION OF THE
 DEVELOPMENT SERVICES DIRECTOR, OR HIS/HER DESIGNEE.
  
 1.1. [ NEW COMMENT ] - THE SCOPE OF THE PERMIT DOES NOT
 MATCH THE FDEP OR ARMY CORPS APPROVALS. THE PERMIT
 INDICATES CONSTRUCTION OF AN ALUMINUM CATWALK ONTO THE
 EXISTING CONCRETE PIER?BUT THE FDEP PERMIT AND ARMY
 CORPS APPROVAL IS FOR THE WIDENING OF THE PIER USING
 ADDITIONAL PILINGS, PRECAST WALKWAY AND PILE CAPS.
  
 2. [ PARTIALLY SATISFIED ] - PURSUANT TO THE MARINA
 COMMERCIAL MARINE PLANNED DEVELOPMENT (CMPD) DESIGN
 GUIDELINES, EXPANSION OF THE MARINA SHALL REQUIRE
 APPROVAL OF A FORMAL SITE PLAN REVIEW (LEVEL II). THIS
 APPLICATION HAS BEEN SUBMITTED AND IS CURRENTLY UNDER
 REVIEW.
  
 2.1. [ NEW COMMENT ] ? THE SITE PLAN REVIEW APPLICATION
 HAS NOT BEEN APPROVED, BUT STAFF IS WILLING TO CONSIDER
 ISSUANCE OF THE PERMIT PRIOR TO SITE PLAN APPROVAL UPON
 SATISFACTION OF ALL OTHER COMMENTS IN THIS PLAN REVIEW.
  
 3. [ PARTIALLY SATISFIED ] - THE DOCK PLANS SHALL BE
 ACCOMPANIED BY A SITE PLAN SHOWING THE OVERALL CMPD,
 ALONG WITH THE NECESSARY DATA INDICATING THE TOTAL
 NUMBER OF BOAT SLIPS, COMPLIANCE WITH PARKING
 REQUIREMENTS, ETC. NOTE THAT THE DESIGN GUIDELINES FOR
 THE CMPD LIMIT THE NUMBER OF SLIPS TO 272.
  
 3.1. [ NEW COMMENT ] - THE SITE PLAN PROVIDED WAS ONLY
 11X17 AND IS NOT LEGIBLE. ADDITIONALLY, THE SITE PLAN
 DOES NOT SHOW THE LOCATION OR EXTENT OF THE
 IMPROVEMENTS THAT ARE THE SCOPE OF THIS PERMIT
 APPLICATION.
  
 ________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
 TTY: 800.955.8771
 E: [email protected]
  
 W: WPB.ORG
  

Review Stop Z ZONING
Rev No 1 Status F Date 2019-07-18 Cont ID  
Sent By jroach Date 2019-07-18 Time 12:28 Rev Time 0.00
Received By jroach Date 2019-07-18 Time 12:28 Sent To ENG
Notes
2019-07-18 12:29:27ZONING PLAN REVIEW
 ___________________________________________
  
 DATE OF REVIEW: 07.18.2019
 PERMIT NO.: 19060907
 ___________________________________________
  
 REVIEW STATUS: FAILED
 ___________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN
 REVIEW COMMENTS:
  
 1. PURSUANT TO RESOLUTION NO. 185-18, PRIOR TO THE
 ISSUANCE OF A BUILDING PERMIT FOR ANY NEW DOCK
 CONSTRUCTION, THE APPLICANT SHALL RECEIVE PERMITS FROM
 THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
 (FDEP) AND THE U.S. ARMY CORPS OF ENGINEERS (ACOE). ALL
 PLANS ASSOCIATED WITH THE FDEP AND ACOE PERMITS SHALL
 BE IN SUBSTANTIAL CONFORMANCE WITH THE PLANS APPROVED
 HEREIN. THESE PERMITS ALSO CONTAIN CONDITIONS OF
 APPROVAL SATISFYING THE APPLICANT?S NECESSARY
 COMPLIANCE WITH THE CITY?S ZONING AND LAND DEVELOPMENT
 REGULATIONS. IN ANY EVENT WHERE THE FDEP OR ACOE
 PERMITS REQUIRE A MODIFICATION TO THE PLANS OR
 CONDITIONS OF APPROVAL, THE MODIFICATION SHALL BE
 REVIEWED BY THE CITY AND AN AMENDMENT TO THE PLANNED
 DEVELOPMENT MAY BE REQUIRED, AT THE DISCRETION OF THE
 DEVELOPMENT SERVICES DIRECTOR, OR HIS/HER DESIGNEE.
  
 2. PURSUANT TO THE MARINA COMMERCIAL MARINE PLANNED
 DEVELOPMENT (CMPD) DESIGN GUIDELINES, EXPANSION OF THE
 MARINA SHALL REQUIRE APPROVAL OF A FORMAL SITE PLAN
 REVIEW (LEVEL II). THIS APPLICATION HAS BEEN SUBMITTED
 AND IS CURRENTLY UNDER REVIEW.
  
 3. THE DOCK PLANS SHALL BE ACCOMPANIED BY A SITE PLAN
 SHOWING THE OVERALL CMPD, ALONG WITH THE NECESSARY DATA
 INDICATING THE TOTAL NUMBER OF BOAT SLIPS, COMPLIANCE
 WITH PARKING REQUIREMENTS, ETC. NOTE THAT THE DESIGN
 GUIDELINES FOR THE CMPD LIMIT THE NUMBER OF SLIPS TO
 272.
 ___________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ___________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
 E: [email protected]
  
 W: WPB.ORG
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved