 |
Plan Review Details - Permit 19060845
| Plan Review Stops For Permit 19060845 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2019-07-08 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2019-07-08 |
Time |
07:35 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2019-07-08 |
Time |
07:35 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2019-08-20 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-08-19 |
Time |
11:10 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-08-19 |
Time |
11:10 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2019-07-30 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-07-30 |
Time |
15:38 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-07-30 |
Time |
15:38 |
Sent To |
Z |
|
| Notes |
| 2019-07-30 16:23:35 | FLORIDA BUILDING CODE 2017 6TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | | NFPA 70 2014 EDITION | | | | | | JAKE LEAHY BN, BU, PX | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | VALUE OF THE WORK TO INCLUDE ALL LABOR AND MATERIAL | | | | | | YOUR CONTRACT DOES NOT INCLUDE THE 35KW GENERATOR AND | | | FUEL TANK????? IT DOES NOT MATTER WHO FURNISHES | | | GENERATOR AND TANK, ITS PART OF THE JOB...... | | | | | | FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING | | | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE | | | TOTAL REPLACEMENT | | | VALUE TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING, | | | MECHANICAL, INTERIOR FINISH, RELATIVE SITE WORK, | | | ARCHITECTURAL AND DESIGN FEES, | | | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY | | | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST | | | PUBLISHED DATA | | | OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES | | | (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY | | | INTERNATIONAL CODE CONGRESS. | | | FINAL BUILDING PERMIT VALUATION SHALL BE SET BY THE | | | BUILDING OFFICIAL |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2019-07-02 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-07-02 |
Time |
07:42 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-07-02 |
Time |
07:42 |
Sent To |
B |
|
| Notes |
| 2019-07-02 07:46:43 | FLORIDA BUILDING CODE 2017 6TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | | NFPA 70 2014 EDITION | | | | | | JAKE LEAHY | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | 1) CONTRACT VALUE DOES NOT ICLUDE ALL MATERIAL, | | | EQUIPMENT, AND LABOR | | | | | | FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING | | | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE | | | TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, | | | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, | | | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, | | | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY | | | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST | | | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS | | | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY | | | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT | | | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. | | | | | | 2) NEED TO SUBMIT CUT SHEETS FOR GENERATOR, TRANSFER | | | SWITCH ECT., ECT. | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2019-08-19 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-08-19 |
Time |
11:10 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-08-09 |
Time |
14:46 |
Sent To |
|
|
| Notes |
| 2019-08-12 14:46:53 | RESUB ROUTED TO JLEAHY |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2019-08-01 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2019-08-01 |
Time |
11:20 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2019-07-24 |
Time |
14:03 |
Sent To |
|
|
| Notes |
| 2019-07-25 14:03:21 | RESUB ROUTED TO ZONING INBOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2019-07-08 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2019-07-08 |
Time |
07:35 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2019-06-18 |
Time |
11:09 |
Sent To |
|
|
| Notes |
| 2019-06-19 11:09:44 | ROUTED TO ZONING INBOX |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2019-07-31 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2019-07-31 |
Time |
16:49 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2019-07-31 |
Time |
16:42 |
Sent To |
PC |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2019-06-20 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2019-06-20 |
Time |
15:34 |
Rev Time |
0.50 |
| Received By |
eschneid |
Date |
2019-06-20 |
Time |
15:34 |
Sent To |
E |
|
| Notes |
| 2019-06-20 16:02:53 | FAILED | | | | | | 1) ALL ELEMENTS NEED TO BE BELOW THE HEIGHT OF THE | | | EIGHT (8) FOOT TALL PERIMETER FENCE: | | | | | | A. THE WAVEGUIDE BRIDGE IS SHOWN POSSIBLY EXCEEDING | | | EIGHT FEET IN HEIGHT. PROVIDE THE EXACT HEIGHT AND | | | ENSURE THAT IT IS NO TALLER THEN EIGHT FEET. | | | B. NO HEIGHT INFORMATION PROVIDED ON THE CABINET | | | HEIGHTS - NOTE THIS MUST INCLUDE THE SLAB HEIGHT THAT | | | THEY SIT ON AND BE LESS THEN EIGHT FEET TALL. | | | C. THE ELECTRICAL H-FRAME AND EVERYTHING MOUNTED TO IT | | | NEEDS TO BE SHOWN AS LOWER THEN EIGHT FEET IN HEIGHT. | | | D. THE TOP OF THE POLE FOR THE AMOB UNITS NEEDS TO BE | | | SHOWN AT NO TALLER THEN EIGHT FEET - INCLUDING THE SLAB | | | IT IS MOUNTED ON. | | | | | | 2) THE GENERATOR REQUIRES A SEPARATE PERMIT WITH PLANS. | | | PLEASE NOTE THAT YOU WILL NEED TO PROVIDE THE FULL | | | HEIGHT OF THE GENERATOR, INCLUDING THE SLAB IT IS | | | MOUNTED ON. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | | [email protected] | | | |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |