Plan Review Details - Permit 19060791
Plan Review Stops For Permit 19060791
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-06-27 Cont ID  
Sent By rmcdouga Date 2019-06-27 Time 16:56 Rev Time 0.00
Received By rmcdouga Date 2019-06-27 Time 14:54 Sent To E
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2019-06-28 Cont ID  
Sent By jleahy Date 2019-06-28 Time 12:49 Rev Time 0.00
Received By jleahy Date 2019-06-28 Time 12:49 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-07-15 Cont ID  
Sent By lcrespo Date 2019-07-15 Time 07:25 Rev Time 0.00
Received By lcrespo Date 2019-07-08 Time 14:32 Sent To  
Notes
2019-07-09 14:33:04RESUB ROUTED TO LCRESPO

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-06-28 Cont ID  
Sent By jleahy Date 2019-06-28 Time 12:51 Rev Time 0.00
Received By jleahy Date 2019-06-18 Time 11:03 Sent To  
Notes
2019-06-19 11:03:20ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2019-07-15 Cont ID  
Sent By lcrespo Date 2019-07-15 Time 07:23 Rev Time 0.00
Received By lcrespo Date 2019-07-15 Time 07:23 Sent To  
Notes
2019-07-15 07:29:4407/15/19 REVIEWED FOR CODE COMPLIANCE (PLUMBING/POOL)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2019-06-26 Cont ID  
Sent By lcrespo Date 2019-06-26 Time 07:21 Rev Time 0.00
Received By lcrespo Date 2019-06-26 Time 07:21 Sent To  
Notes
2019-06-26 13:13:4006/26/2019 1ST PLUMBING/POOL REVIEW **DENIED** WITH
 COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. SUBMIT SPECIFICATION AND SHOW ON DOCUMENTATION THAT
 THE GAS POOL HEATER MEETS THE MINIMUM REQUIRED
 EFFICIENCY AS REQUIRED BY THE 2017 FBC-ENERGY
 SEC.R403.10.4. ALL GAS AND SPA HEATERS SHALL HAVE A
 MINIMUM THERMAL EFFICIENCY OF 82 % FOR HEATERS
 MANUFACTURED ON OR AFTER APRIL 16, 2013, WHEN TESTED IN
 ACCORDANCE WITH ANSI Z 21.56.
 2. BACKFLOW PREVENTER REQUIRED PER THE CITY OF WEST
 PALM BEACH ORD #2853-95. A PERMIT REQUIRED BY A
 LICENSED CONTRACTOR AND MUST BE CERTIFIED BY UTILITIES
 PRIOR TO FINAL INSPECTION. A RPZ IS REQUIRED AT METER
 AND A PVB REQUIRED FOR POOL FILL. PLEASE ADD NOTES ON
 PLANS AND IF OR BY OTHER!
 3. ON GENERAL NOTES ITEM 15 IS REFERRING TO 5TH EDITION
 2014, PLEASE CHANGE TO CURRENT CODE, WPB AMEND. TO FBC
 SEC. 107.2.1.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  

Review Stop Z ZONING
Rev No 1 Status P Date 2019-06-25 Cont ID  
Sent By ajones Date 2019-06-25 Time 10:56 Rev Time 0.00
Received By ajones Date 2019-06-25 Time 10:56 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved