Plan Review Details - Permit 19060681
Plan Review Stops For Permit 19060681
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2019-11-19 Cont ID  
Sent By pvalenti Date 2019-11-19 Time 14:05 Rev Time 0.00
Received By pvalenti Date 2019-11-19 Time 14:05 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-07-31 Cont ID  
Sent By pvalenti Date 2019-07-31 Time 09:04 Rev Time 0.00
Received By pvalenti Date 2019-07-31 Time 09:04 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-07-08 Cont ID  
Sent By pvalenti Date 2019-07-08 Time 06:59 Rev Time 0.00
Received By pvalenti Date 2019-07-08 Time 06:59 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status N Date 2019-09-18 Cont ID  
Sent By jleahy Date 2019-09-18 Time 14:48 Rev Time 0.00
Received By jleahy Date 2019-09-18 Time 14:48 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2019-07-31 Cont ID  
Sent By jleahy Date 2019-07-31 Time 08:37 Rev Time 0.00
Received By jleahy Date 2019-07-31 Time 08:37 Sent To B
Notes
2019-07-31 08:38:32PLANS SHOW NO ELECTRIC, BUT YOU SUBMITTED AN ELECTRICAL
 PERMIT ??????

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2019-07-11 Cont ID  
Sent By jleahy Date 2019-07-11 Time 15:59 Rev Time 0.00
Received By jleahy Date 2019-07-11 Time 15:59 Sent To  
Notes
2019-07-11 16:00:34SUBMIT A CONTRACT SHOWING COST OF SIGN AND THE COST OF
 LABOR SIGNED BY CUSTOMER.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2019-11-19 Cont ID  
Sent By pvalenti Date 2019-11-19 Time 14:05 Rev Time 0.00
Received By pvalenti Date 2019-11-08 Time 15:57 Sent To  
Notes
2019-11-18 14:41:23ROUTED FROM ZONING TO PERMIT LIBRARIAN EL
2019-11-12 15:57:51RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-07-31 Cont ID  
Sent By pvalenti Date 2019-07-31 Time 09:05 Rev Time 0.00
Received By pvalenti Date 2019-07-23 Time 13:45 Sent To  
Notes
2019-07-30 11:47:25ROUTED FROM ZONING TO PERMIT LIBRARIAN 7/30/19 EL
2019-07-24 13:45:49RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-07-11 Cont ID  
Sent By jleahy Date 2019-07-11 Time 16:00 Rev Time 0.00
Received By jleahy Date 2019-06-14 Time 16:04 Sent To  
Notes
2019-06-25 15:50:21ROUTED FROM ZONING TO PERMIT LIBRARIAN 6/25/19 EL
2019-06-17 16:04:16ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 3 Status P Date 2019-11-18 Cont ID  
Sent By elevesqu Date 2019-11-18 Time 14:41 Rev Time 0.00
Received By elevesqu Date 2019-11-18 Time 14:41 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2019-07-30 Cont ID  
Sent By elevesqu Date 2019-07-30 Time 11:47 Rev Time 0.00
Received By elevesqu Date 2019-07-30 Time 11:45 Sent To E
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2019-06-25 Cont ID  
Sent By elevesqu Date 2019-06-25 Time 15:50 Rev Time 0.00
Received By elevesqu Date 2019-06-25 Time 15:48 Sent To B
Notes
2019-06-25 15:50:02SIGN BANDS WITHIN RESIDENTIAL ENCLAVE AREAS (BPD-5): AN
 EXTERNAL SIGN BAND MAY BE APPLIED ON THE FACADE OF EACH
 BUILDING PROVIDED THAT IT SHALL NOT EXCEED 36 INCHES IN
 HEIGHT BY 40 PERCENT OF THE STOREFRONT WIDTH. THE SIGN
 BAND SHALL BE LOCATED WITHIN THE FIRST TWO STORIES OF
 THE BUILDING. SIGNAGE MAY BE PERMITTED ON AWNINGS OR
 CANOPIES, BUT SHALL BE CALCULATED AS SQUARE FOOTAGE
 AGAINST THE ALLOWABLE SIGNAGE AREA. SUCH SIGNS SHALL
 NOT BE INTERNALLY ILLUMINATED. EXTERNAL ILLUMINATION IS
 PERMITTED.
  
 PLEASE ADJUST SIZE AND LIGHTING
  
 LIZ LEVESQUE, URBAN DESIGN PLANNER
 561 822 1426
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved