Plan Review Stops For Permit 19060640
Review Stop E ELECTRICAL
Rev No 1 Status P Date 2019-06-24 Cont ID  
Sent By jleahy Date 2019-06-24 Time 15:20 Rev Time 0.00
Received By jleahy Date 2019-06-24 Time 15:20 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2019-09-23 Cont ID  
Sent By pleduc Date 2019-09-23 Time   Rev Time 0.00
Received By pleduc Date 2019-09-23 Time 14:05 Sent To M
Notes
2019-09-23 14:06:55THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
  
 1) THE FIRE SUPPRESSION SYSTEM SHALL BE SUBMITTED AND
 INSTALLED UNDER SEPARATE PERMIT AND SHOP DRAWINGS.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2019-06-19 Cont ID  
Sent By pleduc Date 2019-06-19 Time   Rev Time 0.00
Received By pleduc Date 2019-06-19 Time 13:52 Sent To M
Notes
2019-06-19 14:07:24THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
 1) THERE ARE NO INDICATIONS OF ELECTRICAL WORK OR
 EQUIPMENT.
  
 PER NFPA 33, STANDARD FOR
 SPRAY APPLICATION USING FLAMMABLE OR COMBUSTIBLE
 MATERIALS
 2011 EDITION, CH 6
  
 6.5.2 IF SPRAY APPLICATION OPERATIONS ARE CONDUCTED
 WITHIN A
 CLOSED-TOP, OPEN-FACE OR OPEN-FRONT BOOTH OR ROOM, AS
 SHOWN
 IN FIGURE 6.5.2, ANY ELECTRICAL WIRING OR UTILIZATION
 EQUIPMENT
 LOCATED OUTSIDE THE BOOTH OR ROOM BUT WITHIN 915MM(3
 FT) OF
 ANY OPENING SHALL BE SUITABLE FOR CLASS I, DIVISION 2;
 CLASS I,
 ZONE 2; CLASS II, DIVISION 2; OR ZONE 22 LOCATIONS,
 WHICHEVER IS
 APPLICABLE.
  
 PLEASE PROVIDE DETAILS
  
  
 2) AN EXHAUST IS INDICATED; HOWEVER, NO MAKE UP AIR
 INTAKE IS PROVIDED/DETAILED THAT MEETS CODE.
  
 PER NFPA 33
  
 7.3* MAKE-UP AIR. AN ADEQUATE SUPPLY OF CLEAN MAKE-UP
 AIR
 SHALL BE PROVIDED TO COMPENSATE FOR THE AIR EXHAUSTED
 FROM
 SPRAY OPERATIONS. THE INTAKE FOR THIS MAKE-UP AIR SHALL
 BE LOCATED
 SO THAT THE AIR EXHAUSTED FROM SPRAY OPERATIONS IS NOT
 RECIRCULATED.
  
 PLEASE PROVIDE DETAILS
  
  
 3) A ROOF EXHAUST IS INDICATED HOWEVER THERE ARE NO
 ROOF DETAILS WITH DIMENSION TO OTHER EQUIPMENT IS
 PROVIDED.
  
 PER NFPA 33
  
 7.4 ROUTING OF EXHAUST DUCTS. AIR EXHAUSTED TO THE
 ATMOSPHERE
 FROM LIQUID SPRAY OPERATIONS SHALL BE CONDUCTED BY
 DUCTS DIRECTLY TO THE OUTSIDE OF THE BUILDING. EXHAUST
 DUCTS
 SHALL FOLLOW THE MOST DIRECT ROUTE TO THE POINT OF
 DISCHARGE BUT
 SHALL NOT PENETRATE A FIRE WALL. THE EXHAUST DISCHARGE
 SHALL BE
 DIRECTED AWAY FROM ANY FRESH AIR INTAKES. THE EXHAUST
 DUCT
 DISCHARGE POINT SHALL BE AT LEAST 1830 MM (6 FT) FROM
 ANY EXTERIOR
 WALL OR ROOF. THE EXHAUST DUCT SHALL NOT DISCHARGE IN
 THE
 DIRECTION OF ANY COMBUSTIBLE CONSTRUCTION THAT IS
 WITHIN
 7625 MM (25 FT) OF THE EXHAUST DUCT DISCHARGE POINT,
 NOR SHALL
 IT DISCHARGE IN THE DIRECTION OF ANY UNPROTECTED
 OPENING IN
 ANY NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE CONSTRUCTION
 THAT
 IS WITHIN 7625 MM (25 FT) OF THE EXHAUST DUCT DISCHARGE
 POINT.
  
 PLEASE PROVIDE DETAILS
  
  
  
 4) THERE IS EXHAUST DUCT EQUIPMENT INDICATED HOWEVER,
 NO DETAILS ARE PROVIDED
  
 PER NFPA 33
  
 7.8* SUPPORT OF EXHAUST DUCTS. EXHAUST DUCTS SHALL BE
 SUPPORTED
 TO PREVENT COLLAPSE UNDER FIRE CONDITIONS.
 7.8.1 DUCT SUPPORTS SHALL BE DESIGNED TO CARRY THE
 WEIGHT OF
 THE DUCT SYSTEM ITSELF, PLUS THE ANTICIPATED WEIGHT OF
 ANY RESIDUES.
 IF SPRINKLER PROTECTION IS PROVIDED INSIDE THE DUCT
 SYSTEM,
 THEN THE DUCT SUPPORTS ALSO SHALL BE DESIGNED TO CARRY
 THE
 ANTICIPATED WEIGHT OF ANY ACCUMULATION OF SPRINKLER
 DISCHARGE.
 7.8.2 HANGERS AND SUPPORTS SHALL BE FASTENED SECURELY
 TO THE
 BUILDING OR TO THE STRUCTURE TO AVOID VIBRATION AND
 STRESS ON THE
 DUCT SYSTEM.
 7.8.3 HANGERS AND SUPPORTS SHALL BE DESIGNED TO ALLOW
 FOR
 EXPANSION AND CONTRACTION.
 7.8.4 EXHAUST DUCTS SHALL NOT USE BUILDING WALLS,
 FLOORS, CEILINGS,
 OR ROOFS AS COMPONENT PARTS.
 7.8.5 THE PROVISIONS OF 7.8.4 SHALL NOT DISALLOW THE
 USE OF
 CONCRETE EXHAUST PLENUMS OR EXHAUST DUCTS WHERE SOME OR
 ALL
 OF THE PLENUM OR DUCT IS PART OF THE CONCRETE FLOOR.
 7.9 EXHAUST DUCT ACCESS OPENINGS. EXHAUST DUCTS SHALL
 BE
 PROVIDED WITH DOORS, PANELS, OR OTHER MEANS TO
 FACILITATE INSPECTION,
 MAINTENANCE, CLEANING, AND ACCESS TO FIRE PROTECTION
 DEVICES
  
 PLEASE PROVIDE DETAILS
  
  
  
 5) THERE IS NO INDICATION OF FIRE PROTECTION OF THE
 BOOTH
  
 PER NFPA 33
  
 9.1* GENERAL. SPRAY AREAS, WHICH INCLUDE BY DEFINITION
 ANY ASSOCIATED
 EXHAUST PLENUMS AND EXHAUST DUCTWORK, ANY PARTICULATE
 FILTERS, ANY SOLVENT CONCENTRATOR UNITS, ANY
 RECIRCULATION
 AIR SUPPLY UNITS, AND MIXING ROOMS, SHALL BE PROTECTED
 WITH AN
 APPROVED AUTOMATIC FIRE PROTECTION SYSTEM.
  
 9.1.1 THE AUTOMATIC FIRE PROTECTION SYSTEM SHALL BE
 PERMITTED TO
 BE, AND SHALL BE INSTALLED IN ACCORDANCE WITH, ANY OF
 THE FOLLOWING:
 (1) AN AUTOMATIC WATER SPRINKLER SYSTEM THAT MEETS ALL
 APPLICABLE
 REQUIREMENTS OF NFPA13, STANDARD FOR THE INSTALLATION
 OF SPRINKLER SYSTEMS
 (2) AN AUTOMATIC FOAM WATER SPRINKLER SYSTEM THAT MEETS
 ALL APPLICABLE
 REQUIREMENTS OF NFPA16, STANDARD FOR THE INSTALLATION
 OF FOAM-WATER SPRINKLER AND FOAM-WATER SPRAY SYSTEMS
 (3) A CARBON DIOXIDE EXTINGUISHING SYSTEM THAT MEETS
 ALL APPLICABLE
 REQUIREMENTS OF NFPA 12, STANDARD ON CARBON DIOXIDE
 EXTINGUISHING SYSTEMS
 (4) A DRY CHEMICAL EXTINGUISHING SYSTEM THAT MEETS ALL
 APPLICABLE
 REQUIREMENTS OF NFPA 17, STANDARD FOR DRY CHEMICAL
 EXTINGUISHING SYSTEMS
 (5) A GASEOUS AGENT EXTINGUISHING SYSTEM THAT MEETS ALL
 APPLICABLE
 REQUIREMENTS OF NFPA 2001, STANDARD ON CLEAN AGENT
 FIRE EXTINGUISHING SYSTEMS
 9.1.2 THE AUTOMATIC FIRE PROTECTION SYSTEM ALSO SHALL
 MEET ALL
 APPLICABLE REQUIREMENTS OF SECTION 9.2 AND SECTION 9.3.
 9.1.3 THE FIRE ALARM AND FIRE PROTECTION SYSTEM SHALL
 BE SUPERVISED
 IN ACCORDANCE WITH NFPA 72, NATIONAL FIRE ALARM AND
 SIGNALING
 CODE.
  
 THE FIRE PROTECTION SYSTEM SHALL BE INSTALLED UNDER
 SEPARATE PERMIT AND SHOP DRAWINGS.
  
 PLEASE REVIEW AND PROVIDE A NOTE OF ACKNOWLEDGEMENT.
  
  
  
  
 6) FOR INFORMATIONAL AND COMPLIANCE PURPOSES.
  
 8.3 MIXING.
 8.3.1 DISPENSING OR TRANSFER OF LIQUIDS FROM CONTAINERS
 AND
 FILLING OF CONTAINERS, INCLUDING PORTABLE MIXING TANKS
 AND
 ?PRESSURE POTS,? SHALL BE DONE ONLY IN A SPRAY AREA
 WITH THE
 VENTILATION IN OPERATION OR IN A MIXING ROOM.
  
 PLEASE ENSURE COMPLAINCE ON INSPECTION AND THE LIFE OF
 THE PROCESS
  
  
  
 7) FOR INFORMATIONAL AND COMPLIANCE PURPOSES
  
 8.2 STORAGE IN PROCESS AREAS.
 8.2.1 THE VOLUME OF CLASS I, CLASS II, AND CLASS IIIA
 LIQUIDS
 STORED IN A STORAGE CABINET SHALL NOT EXCEED 454 L (120
 GAL).
  
 PLEASE ENSURE COMPLAINCE ON INSPECTION AND THE LIFE OF
 THE PROCESS.
  
  
  
 6) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
  
 7) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-10-08 Cont ID  
Sent By cmontell Date 2019-10-08 Time 14:59 Rev Time 0.00
Received By cmontell Date 2019-10-08 Time 14:59 Sent To  
Notes
2019-09-20 11:50:43RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-06-24 Cont ID  
Sent By jleahy Date 2019-06-24 Time 15:20 Rev Time 0.00
Received By jleahy Date 2019-06-13 Time 15:29 Sent To  
Notes
2019-06-14 15:30:02ROUTED TO ZONING INBOX

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2019-10-08 Cont ID  
Sent By cmontell Date 2019-10-08 Time 14:58 Rev Time 0.00
Received By cmontell Date 2019-10-08 Time 14:58 Sent To I
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2019-06-24 Cont ID  
Sent By cmontell Date 2019-06-24 Time 14:02 Rev Time 0.00
Received By cmontell Date 2019-06-24 Time 13:57 Sent To  
Notes
2019-06-24 14:02:07MECHANICAL PLAN REVIEW FAIL
  
 1 - SEE FIRE NOTES
  
 2- PLEASE INDICATE THE AMOUNT OF AIR TO BE EXHAUSTED
  
 CHRIS MONTELLO
 561-805-6733

Review Stop Z ZONING
Rev No 2 Status P Date 2019-09-23 Cont ID  
Sent By llouie Date 2019-09-23 Time   Rev Time 0.00
Received By llouie Date 2019-09-23 Time   Sent To FIRE
Notes
2019-09-23 12:10:57REFERENCE: ZBA 3329

Review Stop Z ZONING
Rev No 1 Status P Date 2019-06-17 Cont ID  
Sent By llouie Date 2019-06-17 Time   Rev Time  
Received By llouie Date 2019-06-17 Time   Sent To FIRE
Notes
2019-06-17 12:58:58REFERENCE: ZBA 3329.