| 2019-09-10 16:54:34 | 09/10/2019 1ST GAS/LP/TANK REVIEW **DENIED** WITH |
| | COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. SUBMIT ANCHORING DETAILS FOR THE LP TANK. NFPA 58-11 |
| | SEC. 5.2.4.3. |
| | 2. PROVIDE THE SIZE OF THE HOLD-DOWN CABLES/STRAPS FOR |
| | THE TANK AND THE TYPE AND LENGTH OF GROUND ANCHORS TO |
| | BE INSTALLED TO PREVENT FLOTATION. NFPA 58 SEC. |
| | 6.6.1.6. |
| | 3. A CATHODIC PROTECTION SYSTEM SHALL BE REQUIRED PER |
| | NFPA 58 SECS. 5.2.1.11, 6.6.6.1 (I) AND SHALL BE |
| | MONITORED PER NFPA 58 SEC.6.6.6.1 (J). SUBMIT DETAILS |
| | ON THE TYPE OF CATHODIC PROTECTION, SIZE (LBS.) & A |
| | NUMBER OF MAGNESIUM BAG(S), SIZE & TYPE OF ANODE CABLE. |
| | 4. SHOW THE DEPTH OF THE LP GAS CONTAINER BELOW GRADE. |
| | COMPLY WITH NFPA 58 SEC. 6.6.6.1. |
| | 5. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| | METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER THE 2017 FBC |
| | RES. SEC. G2413.4.1. |
| | 6. SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE |
| | PRESSURE REGULATORS. REGULATORS INSTALLED ON THE |
| | EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR |
| | INSTALLATION PER THE 2017 FBC RES. SEC. G2421.1. |
| | 7. SHOW LISTED SHUTOFF VALVE IMMEDIATELY AHEAD OF EACH |
| | MP REGULATOR, LEASE SHOW ALL UNIONS IN FRONT OF |
| | REGULATOR 1' OF EITHER SIDE PER THE 2017 FBC FG SEC |
| | 410.2. |
| | 8. SHOW DRIP LEG ON EQUIPMENT INSTALLED PER THE 2017 |
| | FBC RES. SEC. G2419.2. |
| | 9. A FULL ADDRESS OF THE PROJECT OR RESIDENCE MUST BE |
| | ON PLAN (CITY). WPB AMENDMENTS TO THE FBC SEC.107.2.1 |
| | INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | 10. SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL |
| | PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE |
| | CORRUGATED STAINLESS-STEEL TUBING (IF APPLICABLE) FOR |
| | EACH PIPE SIZE. WPB AMENDMENTS TO THE FBC SEC.107.2.1 |
| | INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | 11. SUBMIT COMBUSTION AIR CALCULATIONS FOR THE ADDED |
| | GAS APPLIANCES. WHERE IS COMBUSTION AIR PROVIDED BY THE |
| | BUILDING'S MECHANICAL VENTILATION SYSTEM, THE SYSTEM |
| | SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN |
| | ADDITION TO THE REQUIRED VENTILATION AIR PER THE 2017 |
| | FBC RES. SEC. G2407.9.3. COMBINED COMBUSTION AIR AND |
| | VENTILATION AIR SYSTEM. |
| | 12. SUBMIT MANUFACTURER'S SPECIFICATION |
| | SHEETS/INSTALLATION MANUAL FOR ALL GAS EQUIPMENT (DRYER |
| | AND GRILL) TO VERIFY COMPLIANCE WITH 2017 FBC RES. SEC. |
| | G2408.1. |
| | 13. SUBMIT COMPLETE MANUFACTURER'S SPECIFICATIONS FOR |
| | THE GAS DRYER. THE GAS DRYER SHALL BE LISTED AND |
| | LABELED PER THE 2017 FBC FG RES. SEC. G2404.3. THE |
| | MANUFACTURER'S SPECIFICATIONS SHALL NOTE THE CFM'S THAT |
| | ARE BEING EXHAUSTED BY THE DRYER. |
| | 14. A GAS GRILL IS SHOWN, IS IT FOR OUTSIDE USE AND IT |
| | SEEMS TO BE IN A COVERED PATIO, IF SO PLEASE PROVIDE |
| | MANUFACTURES RECOMMENDATION FOR A VENTILATION HOOD PER |
| | THE 2017 FBC RES. SEC. G2408.1. |
| | 15. THE MANUFACTURER'S SPECIFICATIONS FOR THE GENERATOR |
| | SHALL BE ONSITE FOR FINAL GAS INSPECTION. THE GENERATOR |
| | SHALL BE LISTED AND APPROVED. NFPA 58 SEC. 5.20.1. THE |
| | GENERATOR SHALL MEET THE REQUIREMENTS OF UL 2200. |
| | |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | 561-805-6720 |
| | |