| Plan Review Stops For Permit 19060276 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2019-07-12 |
|
|
Cont ID |
|
| Sent By |
dbattles |
Date |
2019-07-12 |
Time |
08:28 |
Rev Time |
0.00 |
| Received By |
dbattles |
Date |
2019-07-11 |
Time |
11:11 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2019-07-19 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2019-07-19 |
Time |
06:23 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2019-07-19 |
Time |
06:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2019-06-13 |
|
|
Cont ID |
|
| Sent By |
jpearson |
Date |
2019-06-13 |
Time |
14:24 |
Rev Time |
0.00 |
| Received By |
jpearson |
Date |
2019-06-13 |
Time |
14:24 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2019-06-11 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2019-06-11 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2019-06-11 |
Time |
15:32 |
Sent To |
|
|
| Notes |
| 2019-06-11 15:49:09 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | | INSPECTION. | | | | | | | | | 1) SHEE A0.02 - THERE IS AN INCORRECT REFERENCE TO THE | | | CURRENT EDITIONS OF NFPA 13 & 72 (2016). | | | | | | THE CORRECT EDITIONS ARE 2013 RESPECTIVELY. | | | | | | PLEASE REVIEW AND ENSURE COMPLIANCE WITH THE CURRENT | | | EDITIONS. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2019-08-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2019-08-01 |
Time |
14:57 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2019-07-17 |
Time |
10:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2019-07-12 |
|
|
Cont ID |
|
| Sent By |
dbattles |
Date |
2019-07-12 |
Time |
08:33 |
Rev Time |
0.00 |
| Received By |
dbattles |
Date |
2019-06-06 |
Time |
16:24 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
1 |
Status |
N |
Date |
2019-07-12 |
|
|
Cont ID |
|
| Sent By |
dbattles |
Date |
2019-07-12 |
Time |
08:31 |
Rev Time |
0.00 |
| Received By |
dbattles |
Date |
2019-07-11 |
Time |
11:13 |
Sent To |
|
|
| Notes |
| 2019-07-12 08:32:39 | NO CHANGE OCCUPANCY AND NO ADDED SPACE. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
P |
Date |
2019-08-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2019-08-01 |
Time |
14:57 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2019-08-01 |
Time |
14:57 |
Sent To |
|
|
| Notes |
| 2019-08-01 14:57:28 | OK PER C.COLE WORKING REMOTELY | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2019-07-15 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2019-07-15 |
Time |
15:39 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2019-07-15 |
Time |
15:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2019-06-13 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2019-06-13 |
Time |
11:53 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2019-06-13 |
Time |
11:53 |
Sent To |
|
|
| Notes |
| 2019-06-13 11:56:57 | 1ST REVIEW FBC-2017 MECHANICAL | | | PERMIT #19060276 | | | 6/13/19 | | | | | | CODES IN EFFECT: | | | | | | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 | | | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 | | | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION | | | 2017 | | | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION | | | 2017 | | | FS- FLORIDA STATUTES | | | FAC- FLORIDA ADMINISTRATIVE CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | | EDITION 2017 | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) PROVIDE ENGINEERING FOR INSTALLING THE NEW CONDENSER | | | (CU-1) ON THE EXISTING ROOF STAND- SECTION 301.15 FBC | | | M. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE | | | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND | | | KEEP THEM WITH THE SUBMITTALS. | | | | | | CHRISTOPHER L. COLE | | | BUILDING PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2019-07-25 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2019-07-25 |
Time |
18:39 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2019-07-25 |
Time |
18:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2019-06-18 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2019-06-18 |
Time |
07:52 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2019-06-17 |
Time |
10:48 |
Sent To |
|
|
| Notes |
| 2019-06-17 10:48:46 | LOGGED IN FOR GEORGE JOHNSON. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2019-08-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2019-08-01 |
Time |
14:57 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2019-08-01 |
Time |
14:57 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2019-07-26 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2019-07-26 |
Time |
09:10 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2019-07-26 09:09:54 | | | | PLUMBING SHEET: THE DIGITAL SIGNATURE BLOCK DOES NOT | | | CONTAIN THE WORDS" SIGNED AND SEALED" IN IT. A DIGITAL | | | PLAN REQUIRES A DIGITAL SIGNATURE WITH THE PROPER THIRD | | | PARTY VERIFICATION. SELF-CERTIFICATION IS NOT | | | ACCEPTABLE FOR ENGINEERS. ADDITIONALLY, THE DIGITAL | | | SIGNATURE MUST INCLUDE THE STATEMENT "SIGNED AND | | | SEALED" AS PER FAC 61G15-23.004. PROVIDE CORRECTION. | | | WPB FBC 107.1; FS 471/481 | | 2019-07-19 06:23:40 | ELECTRICAL SHEETS: PER THE WPB AMENDMENTS TO THE FBC, | | | EACH SHEET OF PLAN IS REQUIRED TO BE SIGNED AND SEALED | | | BY THE PERSON RESPONSIBLE FOR THE DESIGN. A DIGITAL | | | PLAN REQUIRES A DIGITAL SIGNATURE WITH THE PROPER THIRD | | | PARTY VERIFICATION. SELF-CERTIFICATION IS NOT | | | ACCEPTABLE FOR ENGINEERS. PROVIDE CORRECTION. WPB FBC | | | 107.1; FS 471/481 |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2019-07-12 |
|
|
Cont ID |
|
| Sent By |
dbattles |
Date |
2019-07-12 |
Time |
08:33 |
Rev Time |
0.00 |
| Received By |
dbattles |
Date |
2019-07-12 |
Time |
08:33 |
Sent To |
|
|
| Notes |
| 2019-07-12 08:35:02 | ANY SHEETS TO BE RE-SUBBMITTED NEED TO COMPLY WITH | | | COMMENTS FROM MECHANICAL SIGNATURE REVIEW. | | 2019-06-13 13:01:37 | ELECTRICAL PLANS HAVE A DIGITAL SIGNATURE, BUT THE | | | DIGITAL SIGNATURE DOES NOT INCLUDE THE STATEMENT | | | "SIGNED AND SEALED" AS PER FAC 61G15-23.004 . THE | | | SIGNATURE ONLY STATES THAT IT IS SIGNED. PROVIDE | | | CORRECTION. WPB FBC 107.2.1 | | | | | 2019-06-13 12:00:00 | MECHANICAL PLANS ARE DIGITALLY SIGNED BUT NOT SEALED- | | | SECTION 61G15-23.005 FAC. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2019-06-28 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
2019-06-28 |
Time |
13:45 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
2019-06-28 |
Time |
13:45 |
Sent To |
|
|
| Notes |
|
|