|
 |
 |
 |
 |
 |
Plan Review Details - Permit 19051428
| Plan Review Stops For Permit 19051428 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2019-06-26 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-06-26 |
Time |
14:24 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-06-26 |
Time |
14:24 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2019-06-12 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-06-12 |
Time |
15:57 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-06-12 |
Time |
15:57 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2019-06-26 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-06-26 |
Time |
14:24 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-05-29 |
Time |
14:53 |
Sent To |
|
|
| Notes |
| 2019-05-30 14:54:10 | ROUTED TO ZONING INBOX |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2019-06-17 |
|
|
Cont ID |
|
| Sent By |
thunt |
Date |
2019-06-17 |
Time |
15:57 |
Rev Time |
0.00 |
| Received By |
thunt |
Date |
2019-06-17 |
Time |
15:57 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2019-06-03 |
|
|
Cont ID |
|
| Sent By |
thunt |
Date |
2019-06-03 |
Time |
14:06 |
Rev Time |
0.00 |
| Received By |
thunt |
Date |
2019-06-03 |
Time |
14:06 |
Sent To |
|
|
| Notes |
| 2019-06-03 14:07:52 | PLUMBING 1ST REVIEW**DENIED** | | | | | | | | | 1) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE | | | MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM | | | ITS PUMP CURVE AND THE SIMPLIFIED TOTAL DYNAMIC HEAD | | | CALCULATION IS NO LONGER ALLOWED TO BE USED IN | | | DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC | | | 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION | | | ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT | | | REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED | | | THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET | | | FITTING ASSEMBLY (DRAIN COVER).THE TDH CALCULATIONS | | | MUST INCLUDE ALL OF THE SYSTEM COMPONENTS INCLUDING | | | SUCTION AND RETURN PIPING, FITTINGS, VALVES, HEATER, | | | FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS EXCEPT | | | THE PUMP. | | | | | | 2) INDICATE ON THE PUMP CURVE WHICH CURVE KEY IS FOR | | | THE PUMP BEING INSTALLED ON THIS SYSTEM. WPB AMEND. TO | | | FBC SEC. 107.2.1. | | | | | | TIM HUNT | | | PLUMBING PLANS EXAMINER/ PLUMBING INSPECTOR | | | BUILDING DIVISION | | | CITY OF WEST PALM BEACH | | | 401 CLEMATIS STREET, 1ST FLOOR | | | WEST PALM BEACH, FL 33401 | | | 561-248-2703 | | | [email protected] | | | [email protected] |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2019-05-31 |
|
|
Cont ID |
|
| Sent By |
mcruz |
Date |
2019-05-31 |
Time |
10:23 |
Rev Time |
0.00 |
| Received By |
mcruz |
Date |
2019-05-31 |
Time |
10:21 |
Sent To |
|
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |