|
 |
 |
 |
 |
 |
Plan Review Details - Permit 19051302
| Plan Review Stops For Permit 19051302 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2019-07-18 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2019-07-18 |
Time |
10:36 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2019-07-18 |
Time |
10:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2019-06-20 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2019-06-20 |
Time |
15:24 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2019-06-20 |
Time |
15:24 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
P |
Date |
2019-07-19 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2019-07-19 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
2019-07-19 |
Time |
|
Sent To |
|
|
| Notes |
| 2019-07-19 07:01:46 | PASSED WITH PROVISO: | | | | | | THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS | | | PROJECT INCLUDING A 24 INCH SANITARY FORCE MAIN AND A | | | 30 INCH STORMWATER MAIN. PER CHAPTER 556 OF THE FLORIDA | | | STATE STATUTES, YOU MUST CALL 811 FOR UTILITY LOCATES | | | AT LEAST TWO FULL BUSINESS DAYS IN ADVANCE OF ANY | | | CONSTRUCTION OR DEMOLITION WORK. MORE INFORMATION CAN | | | BE FOUND HERE: HTTP://WWW.SUNSHINE811.COM/ | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | | | | RICK ROSSANO | | | PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1098 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 246-9525 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | MANNY GONZALEZ | | | SENIOR ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 644-7301 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | CENTRAL OPERATIONS CENTER (DISPATCH): | | | 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC | | | UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210 | | | |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
2019-07-09 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2019-07-09 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
2019-07-09 |
Time |
|
Sent To |
|
|
| Notes |
| 2019-07-09 07:39:05 | PLEASE ADDRESS ZONING COMMENTS. | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | | | | RICK ROSSANO | | | PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1098 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 246-9525 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | MANNY GONZALEZ | | | SENIOR ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 644-7301 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | CENTRAL OPERATIONS CENTER (DISPATCH): | | | 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC | | | UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210 | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2019-07-24 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2019-07-24 |
Time |
10:40 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2019-07-11 |
Time |
15:50 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2019-07-09 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2019-07-09 |
Time |
07:41 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2019-06-12 |
Time |
14:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2019-07-18 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2019-07-18 |
Time |
10:37 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2019-07-18 |
Time |
10:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2019-06-20 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2019-06-20 |
Time |
15:25 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2019-06-20 |
Time |
15:25 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2019-07-24 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
2019-07-24 |
Time |
10:30 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
2019-07-18 |
Time |
11:36 |
Sent To |
|
|
| Notes |
| 2019-07-24 10:31:01 | PROVISO:PLEASE INSTALL A DIRECTIONAL SIGN (MAX. 4SF) TO | | | INDICATE LOCATION OF PEDESTRAIN ACCESS. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2019-07-02 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2019-07-02 |
Time |
11:18 |
Rev Time |
0.00 |
| Received By |
eschneid |
Date |
2019-06-20 |
Time |
14:09 |
Sent To |
|
|
| Notes |
| 2019-06-20 14:21:14 | FAILED | | | | | | EAST PORTION OF SITE: | | | | | | 1) SHEET LH 1.07 SHOWS A NEW WATER LINE ALONG THE NORTH | | | SIDE OF THE VALET GARAGE THAT RUNS DIRECTLY THROUGH THE | | | AREA DESIGNATED FOR THE ROW OF BUFFER TREES. THE WATER | | | LINE MUST BE RELOCATED TO NOT INTERFERE WITH THE TREES. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446. | | | [email protected] | | | | | | WEST PORTION OF SITE: | | | | | | 1. PLEASE RELOCATE THE BOLLARDS ADJACENT TO THE CURB | | | LINE, NOT WITHIN THE PEDESTRIAN PLAZA. | | | 2. PLEASE REMOVE TRUNCATED DOMES FROM BIKE LANE. | | | 3. APPROVED SITE PLAN INCLUDED A SIDEWALK CONNECTION TO | | | THE COHEN PAVILION FROM THE SIDEWALK ON THE WEST SIDE | | | OF THE EXIT CURB CUT. | | | 4. AS BUILTS WILL BE NECESSARY TO UPDATE THE SITE PLAN | | | APPROVAL FILE. | | | | | | CONTACT ANA MARIA APONTE @ (561) 822-1439 | | | [email protected] | | | |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |