Plan Review Details - Permit 19051302
Plan Review Stops For Permit 19051302
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-07-18 Cont ID  
Sent By pvalenti Date 2019-07-18 Time 10:36 Rev Time 0.00
Received By pvalenti Date 2019-07-18 Time 10:36 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-06-20 Cont ID  
Sent By pvalenti Date 2019-06-20 Time 15:24 Rev Time 0.00
Received By pvalenti Date 2019-06-20 Time 15:24 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2019-07-19 Cont ID  
Sent By rrossano Date 2019-07-19 Time   Rev Time 0.00
Received By rrossano Date 2019-07-19 Time   Sent To  
Notes
2019-07-19 07:01:46PASSED WITH PROVISO:
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT INCLUDING A 24 INCH SANITARY FORCE MAIN AND A
 30 INCH STORMWATER MAIN. PER CHAPTER 556 OF THE FLORIDA
 STATE STATUTES, YOU MUST CALL 811 FOR UTILITY LOCATES
 AT LEAST TWO FULL BUSINESS DAYS IN ADVANCE OF ANY
 CONSTRUCTION OR DEMOLITION WORK. MORE INFORMATION CAN
 BE FOUND HERE: HTTP://WWW.SUNSHINE811.COM/
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO
 PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1098
 FAX: (561) 494-1116
 MOBILE: (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 MANNY GONZALEZ
 SENIOR ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2019-07-09 Cont ID  
Sent By rrossano Date 2019-07-09 Time   Rev Time 0.00
Received By rrossano Date 2019-07-09 Time   Sent To  
Notes
2019-07-09 07:39:05PLEASE ADDRESS ZONING COMMENTS.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO
 PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1098
 FAX: (561) 494-1116
 MOBILE: (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 MANNY GONZALEZ
 SENIOR ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-07-24 Cont ID  
Sent By lmarchan Date 2019-07-24 Time 10:40 Rev Time 0.00
Received By lmarchan Date 2019-07-11 Time 15:50 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-07-09 Cont ID  
Sent By shill Date 2019-07-09 Time 07:41 Rev Time 0.00
Received By shill Date 2019-06-12 Time 14:19 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2019-07-18 Cont ID  
Sent By pvalenti Date 2019-07-18 Time 10:37 Rev Time 0.00
Received By pvalenti Date 2019-07-18 Time 10:37 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2019-06-20 Cont ID  
Sent By pvalenti Date 2019-06-20 Time 15:25 Rev Time 0.00
Received By pvalenti Date 2019-06-20 Time 15:25 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2019-07-24 Cont ID  
Sent By aaponte Date 2019-07-24 Time 10:30 Rev Time 0.00
Received By aaponte Date 2019-07-18 Time 11:36 Sent To  
Notes
2019-07-24 10:31:01PROVISO:PLEASE INSTALL A DIRECTIONAL SIGN (MAX. 4SF) TO
 INDICATE LOCATION OF PEDESTRAIN ACCESS.

Review Stop Z ZONING
Rev No 1 Status F Date 2019-07-02 Cont ID  
Sent By eschneid Date 2019-07-02 Time 11:18 Rev Time 0.00
Received By eschneid Date 2019-06-20 Time 14:09 Sent To  
Notes
2019-06-20 14:21:14FAILED
  
 EAST PORTION OF SITE:
  
 1) SHEET LH 1.07 SHOWS A NEW WATER LINE ALONG THE NORTH
 SIDE OF THE VALET GARAGE THAT RUNS DIRECTLY THROUGH THE
 AREA DESIGNATED FOR THE ROW OF BUFFER TREES. THE WATER
 LINE MUST BE RELOCATED TO NOT INTERFERE WITH THE TREES.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446.
 [email protected]
  
 WEST PORTION OF SITE:
  
 1. PLEASE RELOCATE THE BOLLARDS ADJACENT TO THE CURB
 LINE, NOT WITHIN THE PEDESTRIAN PLAZA.
 2. PLEASE REMOVE TRUNCATED DOMES FROM BIKE LANE.
 3. APPROVED SITE PLAN INCLUDED A SIDEWALK CONNECTION TO
 THE COHEN PAVILION FROM THE SIDEWALK ON THE WEST SIDE
 OF THE EXIT CURB CUT.
 4. AS BUILTS WILL BE NECESSARY TO UPDATE THE SITE PLAN
 APPROVAL FILE.
  
 CONTACT ANA MARIA APONTE @ (561) 822-1439
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved