Plan Review Details - Permit 19051267
Plan Review Stops For Permit 19051267
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-07-16 Cont ID  
Sent By pvalenti Date 2019-07-16 Time 16:29 Rev Time 0.00
Received By pvalenti Date 2019-07-16 Time 16:29 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-06-12 Cont ID  
Sent By jwitmer Date 2019-06-12 Time 09:24 Rev Time 0.00
Received By jwitmer Date 2019-06-12 Time 08:38 Sent To  
Notes
2019-06-12 09:09:192017 FBC- BUILDING PLAN REVIEW
 W. P. B. PERMIT: 19051267
 ADD: 2427 PRESIDENTIAL WAY SUITE: PH4
 CONT: REGOSA ENGINEERING SERVICES
 TEL: 786-262-2964
 E-MAIL: [email protected]
  
 2017 FLORIDA BUILDING CODE W 2017 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION.
  
 2017 EXISTING BUILDING CODE. 801.3 COMPLIANCE. ALL NEW
 CONSTRUCTION ELEMENTS, COMPONENTS, SYSTEMS, AND SPACES
 SHALL COMPLY WITH THE REQUIREMENTS OF THE FLORIDA
 BUILDING CODE, BUILDING.
  
 1ST REVIEW
 DATE: WED. JUNE 12, 2019
 ACTION: BUILDING PROVISO
  
 1) THE BASE FOR TILE IN A SHOWER SHALL COMPLY WITH THE
 2017 FBC-B SECTION:
  
 2509.2 BASE FOR TILE. MATERIALS USED AS A BASE FOR WALL
 TILE IN TUB AND SHOWER AREAS AND WALL AND CEILING
 PANELS IN SHOWER AREAS SHALL BE OF MATERIALS LISTED IN
 TABLE 2509.2 AND INSTALLED IN ACCORDANCE WITH THE
 MANUFACTURER'S RECOMMENDATIONS.
  
 TABLE 2509.2 BACKERBOARD MATERIALS
  
 MATERIAL-----------------------------------------------
 ----------------- STANDARD
 GLASS MAT GYPSUM BACKING PANEL
 -----------------------------ASTM C1178
 NONASBESTOS FIBER-CEMENT BACKER BOARD-------------M
 C1288 OR ISO 8336,
 -------------------------------------------------------
 ----------------------------CATEGORY C
  
 NONASBESTOS FIBER-MAT REINFORCED
 -----------------------------ASTM C1325
 CEMENTITIOUS BACKER UNIT
  
  
 WATER-RESISTANT GYPSUM BACKING BOARD SHALL NOT BE USED
 AS A BASE FOR TILE IN SHOWERS.
  
 JAMES A. WITMER BN, PX, CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 BUILDING DIVISION / DEVELOPMENT SERVICES DEPARTMENT
 401 CLEMATIS ST. WEST PALM BEACH. FL 33402
 TEL: 561-805-6717
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
 DEVELOPMENT SERVICES HOME PAGE
 HTTP://WWW.CITYOFWPB.COM/CONSTRUCTION/INDEX.PHP
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2019-07-17 Cont ID  
Sent By jleahy Date 2019-07-17 Time 12:39 Rev Time 0.00
Received By jleahy Date 2019-07-17 Time 12:32 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2019-06-18 Cont ID  
Sent By fgiaquin Date 2019-06-18 Time 06:44 Rev Time 0.00
Received By fgiaquin Date 2019-06-18 Time 06:21 Sent To I
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2019-07-01 Cont ID  
Sent By pleduc Date 2019-07-01 Time   Rev Time 0.00
Received By pleduc Date 2019-07-01 Time 15:26 Sent To  
Notes
2019-07-01 15:29:407/1/19
  
 THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
 1) THERE ARE NO INDICATIONS OF FIRE SPRINKLER COVERAGE
 WITHIN THE PROPOSED REMODEL AREA.
  
 1A) ANY REMOVAL AND/OR CONSTRUCTION OF THE CEILING AREA
 MAY REQUIRE AN EVALUATION OR MODIFICATION OF THE FIRE
 SPRINKLER SYSTEM FOR CODE COVERAGE AND COMPLIANCE BY A
 CERTIFIED FIRE SPRINKLER CONTRACTOR.
  
 2) ANY AND ALL WORK ON THE FIRE SPRINKLER SYSTEMS SHALL
 BE DONE UNDER SEPARATE SHOP DRAWINGS AND BY A CERTIFIED
 FIRE SPRINKLER CONTRACTOR.
  
 3) THE FIRE SPRINKLER SHALL REMAIN ACTIVE THROUGHOUT
 THE CONSTRUCTION PERIOD.
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 WEST PALM BEACH FIRE RESCUE
 561-804-4709
 [email protected]

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2019-05-30 Cont ID  
Sent By pleduc Date 2019-05-30 Time   Rev Time 0.00
Received By pleduc Date 2019-05-30 Time 10:29 Sent To  
Notes
2019-05-30 10:31:065/30/19
  
 THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
 1) THERE ARE NO INDICATIONS OF FIRE SPRINKLER COVERAGE
 WITHIN THE PROPOSED REMODEL AREA.
  
 1A) ANY REMOVAL AND/OR CONSTRUCTION OF THE CEILING AREA
 MAY REQUIRE AN EVALUATION OR MODIFICATION OF THE FIRE
 SPRINKLER SYSTEM FOR CODE COVERAGE AND COMPLIANCE BY A
 CERTIFIED FIRE SPRINKLER CONTRACTOR.
  
 2) ANY AND ALL WORK ON THE FIRE SPRINKLER SYSTEMS SHALL
 BE DONE UNDER SEPARATE SHOP DRAWINGS AND BY A CERTIFIED
 FIRE SPRINKLER CONTRACTOR.
  
 3) THE FIRE SPRINKLER SHALL REMAIN ACTIVE THROUGHOUT
 THE CONSTRUCTION PERIOD.
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 WEST PALM BEACH FIRE RESCUE
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-07-17 Cont ID  
Sent By jleahy Date 2019-07-17 Time 12:39 Rev Time 0.00
Received By jleahy Date 2019-06-27 Time 11:31 Sent To  
Notes
2019-06-28 11:31:11B24

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-06-18 Cont ID  
Sent By fgiaquin Date 2019-06-18 Time 06:44 Rev Time 0.00
Received By fgiaquin Date 2019-05-24 Time 15:18 Sent To  
Notes
2019-05-28 15:18:38B01

Review Stop P PLUMBING
Rev No 2 Status P Date 2019-07-11 Cont ID  
Sent By gjohnson Date 2019-07-11 Time 16:06 Rev Time 0.00
Received By gjohnson Date 2019-07-11 Time 08:56 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2019-06-11 Cont ID  
Sent By thunt Date 2019-06-11 Time 09:31 Rev Time 0.00
Received By thunt Date 2019-06-11 Time 09:06 Sent To  
Notes
2019-06-11 09:31:45PLUMBING 1ST REVIEW**DENIED**
  
 1) VALUE APPEARS LOW. PLEASE PROVIDE A SIGNED BONA FIDE
 CONTRACT. WPB AMEND 109.3
  
 2) PROVIDE COMPLETE INSTALLATION MANUAL FOR THE STEAM
 UNIT. FBC 107.2.1
  
 3) PROVIDE STEAM UNIT DETAIL SHOWING THE PAN AND WHERE
 THE PAN DRAIN IS GOING TO TERMINATE AT. FBC 107.2.1
  
 4) PROVIDE SHOWER PAN AND SEAT DETAIL SHOWING PRE-PITCH
 @ 2% AND MATERIAL TO BE USED. FBC-P 417.4, 417.5.1,
 417.5.2
  
  
  
  
 TIM HUNT
 PLUMBING PLANS EXAMINER/ PLUMBING INSPECTOR
 BUILDING DIVISION
 CITY OF WEST PALM BEACH
 401 CLEMATIS STREET, 1ST FLOOR
 WEST PALM BEACH, FL 33401
 561-248-2703
 [email protected]
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved