| Plan Review Stops For Permit 19051097 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2019-08-30 |
|
|
Cont ID |
|
| Sent By |
dbattles |
Date |
2019-08-30 |
Time |
13:43 |
Rev Time |
0.00 |
| Received By |
dbattles |
Date |
2019-08-30 |
Time |
13:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2019-08-06 |
|
|
Cont ID |
|
| Sent By |
jbrooks |
Date |
2019-08-06 |
Time |
14:30 |
Rev Time |
0.00 |
| Received By |
jbrooks |
Date |
2019-08-06 |
Time |
14:30 |
Sent To |
|
|
| Notes |
| 2019-08-06 14:31:21 | JONATHAN BROOKS JR. | | | BUILDING PLANS EXAMINER | | | WORK HOURS TUESDAY & THURSDAY 7:00 AM TO 3:00 PM | | | (561) 805-6716 ALTERNATE: CONTACT SAMANTHA HILL (561) | | | 805-6724 | | | [email protected] | | | | | | 1ST REVIEW: FBC 2017 6TH EDITION | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | | FBC B = FBC BUILDING | | | FBC R = FBC RESIDENTIAL | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC | | | RESULTS: DENIED | | | YOUR SUBMITTAL IS DEFICIENT FOR THE REASONS LISTED | | | BELOW. | | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | | | | | 1. AN ENGINEERING EVALUATION AND ANALYSIS THAT | | | ESTABLISHES THE STRUCTURAL ADEQUACY OF THE ALTERED | | | STRUCTURE SHALL BE PREPARED BY A REGISTERED DESIGN | | | PROFESSIONAL AND SUBMITTED TO THE CODE OFFICIAL. AS PER | | | 907.4.1 AND 907.4.2 FBC-EB. PROVIDE TWO SETS. | | | 2. FBC B 107.2.1. PLEASE CLARIFY; CONNECTION DETAIL | | | PAGE S-1 SHOWS 2?X 6? WOOD BEAMS, DECK FRAMING PLAN | | | PAGE S-2 SHOWS 2?X 10? WOOD BEAMS AT PERIMETER. VERIFY | | | JOIST HANGERS TO BE USED. | | | 3. FBC B 107.2.1. PLEASE CLARIFY; ELEVATION DETAILS | | | PAGE S-1. WEST ELEVATION DETAIL SHOULD BE NORTH | | | ELEVATION AND EAST ELEVATION DETAIL SHOULD BE WEST | | | ELEVATION. | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2019-06-13 |
|
|
Cont ID |
|
| Sent By |
jbrooks |
Date |
2019-06-13 |
Time |
09:41 |
Rev Time |
0.00 |
| Received By |
jbrooks |
Date |
2019-06-13 |
Time |
09:40 |
Sent To |
|
|
| Notes |
| 2019-06-13 09:42:49 | JONATHAN BROOKS JR. | | | BUILDING PLANS EXAMINER | | | WORK HOURS TUESDAY & THURSDAY 7:00 AM TO 3:00 PM | | | (561) 805-6716 ALTERNATE: CONTACT SAMANTHA HILL (561) | | | 805-6724 | | | [email protected] | | | | | | 1ST REVIEW: FBC 2017 6TH EDITION | | | 1ST REVIEW FBC 2017 EXISTING BUILDING | | | RESULTS: DENIED | | | YOUR SUBMITTAL IS DEFICIENT FOR THE REASONS LISTED | | | BELOW. | | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | | | | | 1. CHANGE OCCUPANCY; MIXED USE GROUP B & R2 AS PER | | | 508.1 FBC | | | 2. CHANGE ALTERATION LEVEL TO LEVEL 3 ALTERATION AS PER | | | 505.1 FBC-EB | | | 3. AN ENGINEERING EVALUATION AND ANALYSIS THAT | | | ESTABLISHES THE STRUCTURAL ADEQUACY OF THE ALTERED | | | STRUCTURE SHALL BE PREPARED BY A REGISTERED DESIGN | | | PROFESSIONAL AND SUBMITTED TO THE CODE OFFICIAL. AS PER | | | 907.4.1 AND 907.4.2 FBC-EB. | | | 4. THE STRUCTURAL FRAME AND ROOF CONSTRUCTION | | | SUPPORTING IMPOSED LOADS UPON THE ROOF BY ANY ROOFTOP | | | STRUCTURE SHALL COMPLY WITH THE REQUIREMENTS OF TABLE | | | 601. THE FIRE-RESISTANCE REDUCTION PERMITTED BY TABLE | | | 601, NOTE A, SHALL NOT APPLY TO ROOFS CONTAINING | | | ROOFTOP STRUCTURES. AS PER 1510.9 FBC. | | | 5. ROOFTOP STRUCTURES NOT REGULATED BY SECTIONS 1510.2 | | | THROUGH 1510.7 SHALL COMPLY WITH SECTIONS 1510.8.1 | | | THROUGH 1510.8.5, AS APPLICABLE. | | | 6. HANDRAILS AND GUARDS SHALL BE DESIGNED TO RESIST A | | | LINEAR LOAD OF 50 POUNDS PER LINEAR FOOT (PLF) (0.73 | | | KN/M) IN ACCORDANCE WITH SECTION 4.5.1 OF ASCE 7. GLASS | | | HANDRAIL ASSEMBLIES AND GUARDS SHALL ALSO COMPLY WITH | | | SECTION 2407. | | | 7. PLEASE INCREASE THE VALUATION OF THE PROPOSED | | | PROJECT TO REFLECT THE ADDITIONAL REQUIREMENTS. | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2019-08-22 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2019-08-22 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2019-08-22 |
Time |
12:42 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2019-07-22 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2019-07-22 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2019-07-22 |
Time |
10:36 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2019-06-10 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2019-06-10 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2019-06-10 |
Time |
15:02 |
Sent To |
B |
|
| Notes |
| 2019-06-10 15:35:40 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | | | | | | | 1) SHEET S 1 - THE PROPOSED PROJECT INDICATED A DOOR; | | | HOWEVER, THE SIZE OF THE DOOR IS NOT PROVIDED. | | | | | | THIS DOOR SHALL BE WIDE ENOUGH TO MEET THE MINIMUM | | | WIDTH FOR AN EXIT. | | | | | | PER NFPA 101, CH 7 | | | | | | 7.3.4.1.2 IN EXISTING BUILDINGS, THE WIDTH OF EXIT | | | ACCESS SHALL BE | | | PERMITTED TO BE NOT LESS THAN 28 IN. | | | | | | PLEASE PROVIDE THE DOOR WIDTH. | | | | | | | | | | | | 2) SHEET S 1 - THERE IS NO DOOR HARDWARE INDICATED FOR | | | THE DOOR. | | | | | | 7.2.1.5 LOCKS, LATCHES, AND ALARM DEVICES. | | | 7.2.1.5.1 DOOR LEAVES SHALL BE ARRANGED TO BE OPENED | | | READILY FROM | | | THE EGRESS SIDE WHENEVER THE BUILDING IS OCCUPIED. | | | | | | 7.2.1.5.3 LOCKS, IF PROVIDED, SHALL NOT REQUIRE THE USE | | | OF A KEY, A | | | TOOL, OR SPECIAL KNOWLEDGE OR EFFORT FOR OPERATION FROM | | | THE EGRESS | | | SIDE. | | | | | | PLEASE PROVIDE DOOR HARDWARE DETAILS. | | | | | | | | | 3) SHEET S 1 - THERE ARE NO ROOF DECKING MANUFACTORES | | | SPECIFICATION SHEETS. | | | | | | PLEASE PROVIDE. | | | | | | | | | 4) SHEET S 1 - IT APPEARS ON THE EAST ELEVATION THERE | | | IS A STEP DOWN IN THE MIDDLE OF THE DECKING. | | | | | | THE DECK FLOOR PLAN DOES NOT SHOW IT. | | | | | | PLEASE CLARIFY AND PROVIDE THE STEP DIMENSION COMPLIANT | | | WITH THE CODE. | | | | | | | | | 5) SHEET S 1 - THERE IS NO INDICATION OF THE TRAVEL | | | DISTANCE TO THE EXIT DISCHARGE GOING THROUGH THE DOOR | | | TO THE INTERIOR OF THE BUILDING. | | | | | | PLEASE PROVIDE THE EXISTING EXIT PATH AND TRAVEL | | | DISTANCE THROUGH THE INTERIOR OF THE BUILDING TO THE | | | EXIT DISCHARGE. | | | | | | PER NFPA 101, CH 12 | | | | | | 12.2.6 TRAVEL DISTANCE TO EXITS. | | | 12.2.6.1 TRAVEL DISTANCE SHALL BE MEASURED IN | | | ACCORDANCE WITH | | | SECTION 7.6. | | | | | | PLEASE SHOW FLOOR PLAN AND PROVIDE DETAILS | | | | | | | | | | | | 6) THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, | | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | | | | | | | 7) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET | | | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE | | | ABOVE. | | | | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2019-08-30 |
|
|
Cont ID |
|
| Sent By |
dbattles |
Date |
2019-08-30 |
Time |
13:46 |
Rev Time |
0.00 |
| Received By |
dbattles |
Date |
2019-08-20 |
Time |
15:40 |
Sent To |
|
|
| Notes |
| 2019-08-21 16:08:36 | ROUTED FROM ZONING TO PERMIT LIBRARIAN 8/21/19 EL | | 2019-08-20 15:40:32 | RESUB ROUTED TO ZONING INBOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2019-08-06 |
|
|
Cont ID |
|
| Sent By |
jbrooks |
Date |
2019-08-06 |
Time |
14:32 |
Rev Time |
0.00 |
| Received By |
jbrooks |
Date |
2019-07-11 |
Time |
14:49 |
Sent To |
|
|
| Notes |
| 2019-07-18 16:14:56 | ROUTED FROM ZONING TO PERMIT LIBRARIAN 7/18/19 EL | | 2019-07-12 14:49:25 | RESUB ROUTED TO ZONING INBOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2019-06-13 |
|
|
Cont ID |
|
| Sent By |
jbrooks |
Date |
2019-06-13 |
Time |
09:43 |
Rev Time |
0.00 |
| Received By |
jbrooks |
Date |
2019-05-22 |
Time |
14:19 |
Sent To |
|
|
| Notes |
| 2019-06-06 15:37:01 | TO LMARCHAN | | 2019-06-05 14:19:45 | ROUTED TO ZONING INBOX |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2019-08-21 |
|
|
Cont ID |
|
| Sent By |
elevesqu |
Date |
2019-08-21 |
Time |
16:08 |
Rev Time |
0.00 |
| Received By |
elevesqu |
Date |
2019-08-21 |
Time |
16:08 |
Sent To |
FIRE |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2019-07-18 |
|
|
Cont ID |
|
| Sent By |
elevesqu |
Date |
2019-07-18 |
Time |
16:14 |
Rev Time |
0.00 |
| Received By |
elevesqu |
Date |
2019-07-18 |
Time |
16:14 |
Sent To |
FIRE |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2019-06-06 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
2019-06-06 |
Time |
15:33 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
2019-06-06 |
Time |
15:33 |
Sent To |
FIRE |
|
| Notes |
|
|