Plan Review Details - Permit 19050734
Plan Review Stops For Permit 19050734
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-06-03 Cont ID  
Sent By jduprey Date 2019-06-03 Time 16:29 Rev Time 0.00
Received By jduprey Date 2019-06-03 Time 16:29 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-05-28 Cont ID  
Sent By jduprey Date 2019-05-28 Time 10:15 Rev Time 0.00
Received By jduprey Date 2019-05-28 Time 09:56 Sent To  
Notes
2019-05-28 10:23:57BUILDING PLAN REVIEW
 2017 FLORIDA BUILDING CODE, 6TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
  
 JOSEAN A. DUPREY
 BUILDING PLANS EXAMINER
 CONSTRUCTION SERVICES DIVISION
 TEL: 561-805-6716
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
 1ST REVIEW
 RESULTS: DENIED
 YOUR SUBMITTAL IS DEFICIENT FOR THE REASONS LISTED
 BELOW.
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 1. THE DUMPSTER GATE ENGINEERED CALCULATIONS WERE
 PROVIDED WITHOUT ENGINEER SIGN AND SEAL. PLEASE PROVIDE
 THIS DOCUMENT WITH ORIGINAL ENGINEER'S SIGNATURE.
 PLANS THAT HAVE BEEN PREPARED BY AN ENGINEER AND
 SUBMITTED FOR PUBLIC RECORD SHALL BEAR THE SIGNATURE,
 DATE AND SEAL OF THE ENGINEER PER FL ADMIN. CODE RULE
 61G15-23.001.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2019-05-22 Cont ID  
Sent By rrossano Date 2019-05-22 Time   Rev Time 0.00
Received By rrossano Date 2019-05-22 Time   Sent To B
Notes
2019-05-22 07:43:07PASSED WITH PROVISO:
  
 DUMPSTER LOADING AREA SHALL HAVE 10' CONCRETE SURFACE
 FOR TRUCK TO APPROACH. TYPICALLY ASPHALT IS USED IN THE
 AREA APPROACHING THE DUMPSTER AND IT QUICKLY
 DETERIORATES DUE TO THE FRONT WHEELS OF THE SANITATION
 VEHICLE.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
  
 RICK ROSSANO
 PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1098
 FAX: (561) 494-1116
 MOBILE: (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 MANNY GONZALEZ
 SENIOR ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-06-03 Cont ID  
Sent By jduprey Date 2019-06-03 Time 16:29 Rev Time 0.00
Received By jduprey Date 2019-05-31 Time 14:24 Sent To  
Notes
2019-06-03 14:24:55RESUB ROUTED TO JDUPREY

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-05-28 Cont ID  
Sent By jduprey Date 2019-05-28 Time 10:24 Rev Time 0.00
Received By jduprey Date 2019-05-14 Time 12:59 Sent To  
Notes
2019-05-15 12:59:57ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 2 Status F Date   Cont ID  
Sent By   Date 2019-07-03 Time   Rev Time 0.00
Received By pgreilic Date 2019-07-03 Time 14:13 Sent To  
Notes
2019-07-03 14:14:171.) LABEL HEIGHT AND SETBACKS FOR PROPOSED GAZEBOS
  
 PAUL GREILICH, SENIOR PLANNER
 561-822-1443
 [email protected]

Review Stop Z ZONING
Rev No 1 Status P Date   Cont ID  
Sent By   Date 2019-05-21 Time   Rev Time 0.00
Received By pgreilic Date 2019-05-21 Time 09:42 Sent To ENG
Notes
2019-05-21 09:43:05PAUL GREILICH, SENIOR PLANNER
 561-822-1443
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved