Plan Review Details - Permit 19050463
Plan Review Stops For Permit 19050463
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-06-10 Cont ID  
Sent By jgomez Date 2019-06-10 Time 13:48 Rev Time 0.00
Received By jgomez Date 2019-06-10 Time 13:40 Sent To  
Notes
2019-06-10 13:45:59VALUATION WAS WAIVED THIS TIME BECAUSE CONTRACTOR IS
 CHARGED 4 TIMES FEES FOR WORK WITHOUT PERMIT AND THERE
 WERE OTHER PERMITS FOR OTHER BUILDINGS IN THIS
 DEVELOPMENT APPROVED BY ANOTHER PLAN REVIEWER THAT
 CONSIDERED THE 4X FEES PLUS REQUESTED REVISIONS. JG.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-06-05 Cont ID  
Sent By jgomez Date 2019-06-05 Time 09:04 Rev Time 0.00
Received By jgomez Date 2019-06-04 Time 18:06 Sent To  
Notes
2019-06-05 09:05:21BUILDING REVIEW COMMENTS
 CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS.
  
 NOTE: ALL NEW CONSTRUCTION ELEMENTS, COMPONENTS,
 SYSTEMS, AND SPACES SHALL COMPLY WITH THE REQUIREMENTS
 OF THE FLORIDA BUILDING CODE, BUILDING.
 SEC. 801.3 FBC-EXISTING BUILDING.
  
 1-VALUATION DECLARED IN THE PERMIT APPLICATION IS TOO
 LOW. VALUATION TO INCLUDE ALL LABOR, MATERIALS,
 CONTRACTOR'S OVERHEAD AND PROFIT AND DESIGN
 PROFESSIONAL FEES AS REQUIRED BY SEC. 109.3 CITY
 AMENDMENTS.
 UPDATE VALUATION AND INCLUDE DESIGN PROFESSIONAL FEES.
  
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-06-10 Cont ID  
Sent By jgomez Date 2019-06-10 Time 13:46 Rev Time 0.00
Received By jgomez Date 2019-06-10 Time 13:40 Sent To I
Notes
2019-06-10 13:47:13VALUATION WAS WAIVED THIS TIME BECAUSE CONTRACTOR IS
 CHARGED 4 TIMES FEES FOR WORK WITHOUT PERMIT AND THERE
 WERE OTHER PERMITS FOR OTHER BUILDINGS IN THIS
 DEVELOPMENT APPROVED BY ANOTHER PLAN REVIEWER THAT
 CONSIDERED THE 4X FEES PLUS REQUESTED REVISIONS. JG.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-06-05 Cont ID  
Sent By jgomez Date 2019-06-05 Time 09:13 Rev Time 0.00
Received By jgomez Date 2019-05-16 Time 10:23 Sent To I
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2019-06-05 Cont ID  
Sent By jgomez Date 2019-06-05 Time 09:12 Rev Time 0.00
Received By jgomez Date 2019-06-05 Time 09:12 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved