Plan Review Details - Permit 19050338
Plan Review Stops For Permit 19050338
Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2019-07-12 Cont ID  
Sent By rrossano Date 2019-07-12 Time   Rev Time 0.00
Received By rrossano Date 2019-07-12 Time   Sent To I
Notes
2019-07-12 06:47:50PASSED WITH PROVISO:
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES,
 YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL
 BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR
 DEMOLITION WORK. MORE INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO
 PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1098
 FAX: (561) 494-1116
 MOBILE: (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 MANNY GONZALEZ
 SENIOR ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2019-05-20 Cont ID  
Sent By rrossano Date 2019-05-20 Time   Rev Time  
Received By rrossano Date 2019-05-20 Time   Sent To I
Notes
2019-05-20 07:05:42PASSED WITH PROVISOS:
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES,
 YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL
 BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR
 DEMOLITION WORK. MORE INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
  
 RICK ROSSANO
 PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1098
 FAX: (561) 494-1116
 MOBILE: (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 MANNY GONZALEZ
 SENIOR ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-07-12 Cont ID  
Sent By cpuell Date 2019-07-12 Time 14:38 Rev Time 0.00
Received By cpuell Date 2019-07-09 Time 15:29 Sent To  
Notes
2019-07-10 15:30:00RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-05-20 Cont ID  
Sent By lmarchan Date 2019-05-20 Time 09:35 Rev Time 0.00
Received By lmarchan Date 2019-05-09 Time 15:36 Sent To  
Notes
2019-05-09 15:37:08ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 2 Status P Date 2019-07-11 Cont ID  
Sent By jroach Date 2019-07-11 Time 12:16 Rev Time 0.00
Received By jroach Date 2019-07-11 Time 12:16 Sent To ENG
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2019-05-17 Cont ID  
Sent By mcruz Date 2019-05-17 Time 08:35 Rev Time 0.00
Received By mcruz Date 2019-05-17 Time 08:11 Sent To ENG
Notes
2019-05-17 08:35:20ZONING REVIEW FAILED, DUE TO THE FOLLOWING:
  
 1) DRIVEWAY WIDTH AT PROPERTY LINE SHALL NOT EXCEED 20'
 IN WIDTH.
  
 LOTS WITH ONE FRONTAGE ARE ONLY ALLOWED ONE ACCESS
 POINT UNLESS IT IS A CIRCULAR DRIVEWAY. THE TOTAL WIDTH
 AT THE PROPERTY LINE SHALL BE 20 FEET, SEE ENCLOSED
 ILLUSTRATION FOR YOUR REFERENCE.
  
 TWO DRIVEWAYS ON A LOT MUST BE TOTAL 20 FEET AND ACCESS
 FOR CIRCULAR DRIVEWAYS SHALL BE 10 FEET WIDE EACH, SEE
 ENCLOSED ILLUSTRATION FOR YOUR REFERENCE.
  
 2) INDICATE THE SETBACK FROM THE PROPOSED DRIVEWAY TO
 THE SIDE PROPERTY LINE, SHOULD BE AT LEAST 3 FEET.
 3) ENSURE FRONT YARD MEETS LANDSCAPING REQUIREMENTS,
 WHEREBY, THE LESSER OF 1,000 SQUARE FEET OR 75 PERCENT
 OF THE FRONT YARD AREA SHALL BE LANDSCAPED WITH LIVING
 PLANT MATERIAL (SUCH AS GRASS, GROUND COVER, SHRUBS,
 HEDGES, VINES OR TREES). FRONT YARD AREA IS CALCULATED
 AS FOLLOWS: 25' X LENGTH OF FRONTAGE = FRONT YARD AREA.
  
 NOTE: IF MATERIAL OF NEW DRIVEWAY ARE PAVERS, THEN 60%
 LANDSCAPING IS REQUIRED.
  
  
 FOR ADDITIONAL INFORMATION, THE ZONING AND LAND
 DEVELOPMENT REGULATIONS MAY BE VIEWED ONLINE AT
 WWW.MUNICODE.COM OR VISIT THE CITY OF WEST PALM BEACH
 PLANNING DEPARTMENT WEBSITE AT
 WWW.CITYOFWPB.COM/PLAN/INDEX.HTM.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE DO NOT HESITATE TO
 CONTACT ME. IF YOU WANT TO MEET IN PERSON TO GO OVER
 THE ABOVE COMMENTS, PLEASE CALL OR E-MAIL ME TO
 SCHEDULE AN APPOINTMENT.
  
 MAGGIE CRUZ
 ASSOCIATE PLANNER
 PLANNING AND ZONING DEPARTMENT
 TEL: 561-822-1442
 E-MAIL: [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved