Plan Review Details - Permit 19050328
Plan Review Stops For Permit 19050328
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2019-06-24 Cont ID  
Sent By dbattles Date 2019-06-24 Time 10:12 Rev Time 0.00
Received By dbattles Date 2019-06-24 Time 10:12 Sent To  
Notes
2019-06-24 10:16:20PROVISO:
 FDOT PERMIT NEEDED FOR R.O.W. ALONG QUADRILLE.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2019-06-18 Cont ID  
Sent By dbattles Date 2019-06-18 Time 08:31 Rev Time 0.00
Received By dbattles Date 2019-06-18 Time 08:31 Sent To  
Notes
2019-06-18 08:34:12BUILDING REVIEW COMMENTS:
  
 W.P.B. PERMIT: 19050328
 REVIEWED: JUNE 18, 2019
  
 PLEASE SHOW WHERE THE COVERED WALKWAY IS BEING PLACED
 ON THE TEMP FENCE PLAN.
  
 DYLAN BATTLES
 BUILDING PLANS EXAMINER PX4191
 [email protected]
 561-805-6718
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-06-03 Cont ID  
Sent By dbattles Date 2019-06-03 Time 08:38 Rev Time 0.00
Received By dbattles Date 2019-05-31 Time 14:43 Sent To  
Notes
2019-06-03 08:39:13BUILDING REVIEW COMMENTS:
  
 W.P.B. PERMIT: 19050328
 REVIEWED: JUNE 3, 2019
  
 DYLAN BATTLES
 BUILDING PLANS EXAMINER PX4191
 [email protected]
 561-805-6718
  
 FBC[AMENDED] = FLORIDA BUILDING CODE,6TH EDITION (2017)
 FBC[B] = FBC BUILDING
 FBC[A] = FBC ACCESSIBILITY
  
 1) 3306.1 FBC[B] PROTECTION REQUIRED.
 -PLEASE VERIFY LEVEL OF PROTECTION REQUIRED ALONG
 QUADRILLE.
 -WILL THERE BE A COVERED WALKWAY ALONG QUADRILLE?
  
 3104.1.1 FBC[B] APPLICATION. PEDESTRIAN WALKWAYS SHALL
 BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH SECTIONS
 3104.2 THROUGH 3104.9. TUNNELS SHALL BE DESIGNED AND
 CONSTRUCTED IN ACCORDANCE WITH SECTIONS 3104.2 AND
 3104.10.
  
 2) 107.3.5 FBC(AMENDED) DETAILS ON SHEET SD-01 ARE FOR
 FENCE IN GRADE. DO YOU HAVE A DETAIL FOR INSTALLING IN
 R.O.W CONDITIONS?
  
 3) PROVISO:
 R.O.W. PERMIT THAT WAS SUBMITTED TO ENGINEERING NEEDS
 TO BE APPROVED PRIOR TO RE-LOCATING FENCE BEYOND
 PROPERTY LINES.
  
 PLEASE FEEL FREE TO CONTACT ME AT 561-805-6718 (M-F
 8-5) TO DISCUSS COMMENTS, OR E-MAIL ANYTIME
 [email protected]
  
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2019-06-18 Cont ID  
Sent By pleduc Date 2019-06-18 Time   Rev Time 0.00
Received By pleduc Date 2019-06-18 Time 16:03 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2019-05-13 Cont ID  
Sent By pleduc Date 2019-05-13 Time   Rev Time 0.00
Received By pleduc Date 2019-05-13 Time 14:04 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-06-24 Cont ID  
Sent By dbattles Date 2019-06-24 Time 10:21 Rev Time 0.00
Received By dbattles Date 2019-06-17 Time 15:02 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-06-05 Cont ID  
Sent By shill Date 2019-06-05 Time 10:29 Rev Time 0.00
Received By shill Date 2019-05-07 Time 12:42 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2019-06-24 Cont ID  
Sent By dbattles Date 2019-06-24 Time 10:34 Rev Time 0.00
Received By dbattles Date 2019-06-24 Time 10:34 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2019-06-18 Cont ID  
Sent By dbattles Date 2019-06-18 Time 08:28 Rev Time 0.00
Received By dbattles Date 2019-06-18 Time 08:28 Sent To  
Notes
2019-06-18 08:31:35COVERED WALKWAY ENGINEERING - OK
  
 ANY NEW SHEETS SUBMITTED WILL BE VERIFIED.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2019-06-03 Cont ID  
Sent By dbattles Date 2019-06-03 Time 08:39 Rev Time 0.00
Received By dbattles Date 2019-06-03 Time 08:39 Sent To  
Notes
2019-06-03 08:40:35PLEASE ADD DIGITAL SIGNATURE TO PLAN SHEET.

Review Stop Z ZONING
Rev No 2 Status P Date 2019-06-24 Cont ID  
Sent By aaponte Date 2019-06-24 Time 08:43 Rev Time 0.00
Received By aaponte Date 2019-06-24 Time 08:43 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2019-06-05 Cont ID  
Sent By aaponte Date 2019-06-05 Time 10:18 Rev Time 0.00
Received By aaponte Date 2019-06-05 Time 10:18 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved