Plan Review Details - Permit 19050235
Plan Review Stops For Permit 19050235
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2019-05-20 Cont ID  
Sent By pvalenti Date 2019-05-20 Time 06:29 Rev Time 0.00
Received By pvalenti Date 2019-05-20 Time 06:29 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2019-05-10 Cont ID  
Sent By pvalenti Date 2019-05-10 Time 07:05 Rev Time 0.00
Received By pvalenti Date 2019-05-10 Time 07:05 Sent To  
Notes
2019-05-10 07:18:18***CORRECTIONS***
 PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 2ND BUILDING REVIEW DENIED:
  
 FBC B 107.1/FL. STATUTE 471/FL. ADMINISTRATIVE RULES
 61G15-23.001: THE ENGINEER FOR THIS SUBMITTAL NEEDS TO
 SIGN AND SEAL(RAISED) THIS PAGE AND THE DESIGNER OF
 RECORD FOR THIS PROJECT NEEDS TO STAMP, REVIEW, AND
 SIGN THIS DOCUMENT FOR APPROVAL.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-05-08 Cont ID  
Sent By pvalenti Date 2019-05-08 Time 08:00 Rev Time 0.00
Received By pvalenti Date 2019-05-08 Time 08:00 Sent To  
Notes
2019-05-08 08:06:56***CORRECTIONS***
 PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 BUILDING REVIEW DENIED:
  
 1. FBC B 107.2.1 MORE INFORMATION IS REQUIRED. PLEASE
 PROVIDE INFORMATION ON THE SUBSTRATE MATERIALS AND
 DIMENSIONS AT CONNECTION POINTS FOR THE WALL AND FLOOR
 CONNECTION POINTS.
 2. FBC B 1607.8.1 PROVIDE CALCULATIONS FOR THE LOAD
 RESISTANCE OF THE HANDRAILS MEETING CODE REQUIREMENTS.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2019-05-18 Cont ID  
Sent By pvalenti Date 2019-05-18 Time 10:22 Rev Time 0.00
Received By pvalenti Date 2019-05-16 Time 13:44 Sent To  
Notes
2019-05-17 13:44:41RESUB ROUTED TO PVALENTI

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-05-10 Cont ID  
Sent By pvalenti Date 2019-05-10 Time 07:18 Rev Time 0.00
Received By pvalenti Date 2019-05-08 Time 11:46 Sent To  
Notes
2019-05-09 11:47:06RESUB ROUTED TO PVALENTI

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-05-08 Cont ID  
Sent By pvalenti Date 2019-05-08 Time 08:07 Rev Time 0.00
Received By pvalenti Date 2019-05-06 Time 12:51 Sent To  
Notes
2019-05-07 12:52:11BLDG <5K


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved