| Plan Review Stops For Permit 19050085 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2019-08-22 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-08-22 |
Time |
15:36 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-08-22 |
Time |
15:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2019-08-06 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-08-06 |
Time |
16:49 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-08-06 |
Time |
16:49 |
Sent To |
|
|
| Notes |
| 2019-08-06 16:50:51 | FLORIDA BUILDING CODE 2017 6TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | | NFPA 70 2014 EDITION | | | | | | JAKE LEAHY BN, BU, PX | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | NEED CUT SHEETS ON CABLES RISER AND PLENUM CABLE BEING | | | USED? 110.3 | | | | | | PLEASE SUBMIT A SIGNED CONTRACT FOR WORK INVOLVED. | | | | | | FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING | | | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE | | | TOTAL REPLACEMENT VALUE TO INCLUDE | | | STRUCTURAL, ELECTRIC, PLUMBING, MECHANICAL, INTERIOR | | | FINISH, RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN | | | FEES, MARKETING COSTS, OVERHEAD AND PROFIT; | | | EXCLUDING ONLY LAND VALUE. VALUATION REFERENCES MAY | | | INCLUDE THE LATEST PUBLISHED DATA OF NATIONAL | | | CONSTRUCTION COST ANALYSIS SERVICES (MARSHALL- | | | SWIFT, MEANS, ETC.), AS PUBLISHED BY INTERNATIONAL CODE | | | CONGRESS. FINAL BUILDING PERMIT VALUATION SHALL BE SET | | | BY THE BUILDING OFFICIAL. | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2019-06-05 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-06-05 |
Time |
15:09 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-06-05 |
Time |
15:09 |
Sent To |
|
|
| Notes |
| 2019-06-05 15:12:07 | FLORIDA BUILDING CODE 2017 6TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | | NFPA 70 2014 EDITION | | | | | | JAKE LEAHY | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | | | | NEED TO SHOW HOW YOU GET FROM POINT TO POINT IN | | | BUILDING. | | | | | | RISER DOES NOT SHOW WHERE CABLES SHALL BE INSTALLED. | | | | | | NEEDS FIRE REVIEW. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2019-07-31 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2019-07-31 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2019-07-31 |
Time |
09:48 |
Sent To |
|
|
| Notes |
| 2019-07-31 15:44:55 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | | INSPECTION. | | | | | | | | | 1) ENSURE THE INSTALL COMPLIES WITH NFPA 72, CH 24, | | | INCLUDING BUT NOT LIMITED TO | | | | | | 24.5.2.5.2 COMPONENT ENCLOSURES. ALL REPEATER, | | | TRANSMITTER, RECEIVER, | | | SIGNAL BOOSTER COMPONENTS, AND BATTERY SYSTEM | | | COMPONENTS | | | SHALL BE CONTAINED IN A NEMA4- OR 4X-TYPE ENCLOSURE(S). | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2019-06-11 |
|
|
Cont ID |
|
| Sent By |
J.Walker |
Date |
2019-06-11 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
2019-05-28 |
Time |
|
Sent To |
E |
|
| Notes |
| 2019-06-11 15:16:13 | POSTED FAILED... | | | WILL REQUIRE MORE DETAILS. | | | EQUIPMENT MOUNTING LOCATIONS. | | | WIRE CHASES AND / OR CONDUIT | | | SECONDARY POWER SOURCE | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2019-08-22 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-08-22 |
Time |
15:36 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-08-15 |
Time |
12:35 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2019-08-12 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2019-08-12 |
Time |
10:23 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2019-07-29 |
Time |
10:18 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2019-06-12 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-06-12 |
Time |
16:43 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2019-05-28 |
Time |
14:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2019-08-22 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-08-22 |
Time |
15:36 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-08-22 |
Time |
15:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2019-08-12 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-08-12 |
Time |
09:23 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-08-06 |
Time |
16:51 |
Sent To |
|
|
| Notes |
| 2019-08-12 09:25:02 | SEE PREVIOUS REVIEW NOTES. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2019-06-05 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-06-05 |
Time |
15:15 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-06-05 |
Time |
15:15 |
Sent To |
|
|
| Notes |
| 2019-06-05 15:15:40 | NO ELECTRONIC SIGNATURE ON THESE PLANS. |
|
|