Plan Review Details - Permit 19041480
Plan Review Stops For Permit 19041480
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2019-06-07 Cont ID  
Sent By dbattles Date 2019-06-07 Time 12:23 Rev Time 0.00
Received By dbattles Date 2019-06-07 Time 12:23 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2019-06-03 Cont ID  
Sent By pvalenti Date 2019-06-03 Time 11:20 Rev Time 0.00
Received By pvalenti Date 2019-06-03 Time 11:20 Sent To  
Notes
2019-06-03 11:24:04***CORRECTIONS***
 PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 2ND BUILDING PLAN REVIEW DENIED:
  
 FBC B 107.
 1. PROVIDE 2ND SET OF SUBMITTED PLANS/DETAILS.
 2. PROVIDE DESIGN PROFESSIONAL SIGNATURES ON SUBMITTED
 PLANS/DETAILS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-05-13 Cont ID  
Sent By pleduc Date 2019-05-09 Time 10:55 Rev Time 0.00
Received By dbattles Date 2019-05-13 Time 11:14 Sent To  
Notes
2019-05-13 15:58:46****CORRECTIONS****
 W.P.B. PERMIT: 19041480
 REVIEWED: MAY 13, 2019
  
 DYLAN BATTLES
 BUILDING PLANS EXAMINER PX4191
 [email protected]
 561-805-6718
  
 FBC[AMENDED] = FLORIDA BUILDING CODE,6TH EDITION (2017)
  
 1) 3306.6 BARRIER DESIGN. PLEASE PROVIDE DETAILS OF
 BARRIER:
 BARRIER HEIGHT (3306.5 BARRIERS), POST TYPE, POST
 DEPTH, METHOD OF INSTALL, LOCATION OF ACCESS POINTS AND
 GATE POST DETAILS.
  
 2) 3306.1 PROTECTION REQUIRED. AT WHAT POINT IN
 CONSTRUCTION WILL PHASE TWO BE IMPLEMENTED?
 ENGINEERING DEPARTMENT WILL NEED TO APPROVE ALL WORK
 THAT INVOLVES RIGHT OF WAY. CONTACT ENGINEERING AT
 561-494-1040 FOR MORE INFO.
  
 NOTES:
  
 -ADDITIONAL COMMENTS MAY BE FORTHCOMING PENDING REVIEW
 OF MATERIALS REQUESTED.
  
 -WHEN RESUBMITTING, PROVIDE TWO IDENTICAL COLLATED SETS
 OF DOCUMENTS FOR ISSUANCE. OLD SHEETS (BOTH SETS)
 SHOULD BE RETAINED IN THE PACKAGE; PLEASE DO NOT
 DISCARD ANY DOCUMENTS. THEY SHOULD BE BOUND TOGETHER
 SEPARATELY FROM THE TWO ISSUANCE SETS AND MARKED "VOID"
 OR "OLD SHEETS". PLEASE DO NOT STAMP THE PLANS VOID AS
 APPLICANTS ARE INADVERTENTLY STAMPING SHEETS THAT WE
 NEED "VOID", RENDERING THEM NOT USABLE.
  
 PLEASE FEEL FREE TO CONTACT ME AT 561-805-6718 (M-F
 8-5) TO DISCUSS COMMENTS, OR E-MAIL ANYTIME
 [email protected]
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2019-05-31 Cont ID  
Sent By pleduc Date 2019-05-31 Time   Rev Time 0.00
Received By pleduc Date 2019-05-31 Time 14:58 Sent To B
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2019-05-09 Cont ID  
Sent By pleduc Date 2019-05-09 Time   Rev Time 0.00
Received By pleduc Date 2019-05-09 Time 10:48 Sent To B
Notes
2019-05-09 10:55:04THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
  
 1) THERE ARE NO INDICATIONS OF FIRE DEPARTMENT
 ACCESS/GATES. A 20' FIRE LANE ACCESS WIDTH IS REQUIRED
 FOR SITE ACCESS.
  
 PER NFPA 1
  
 18.2.3 FIRE DEPARTMENT ACCESS ROADS.
 18.2.3.1 REQUIRED ACCESS.
 18.2.3.1.1 APPROVED FIRE DEPARTMENT ACCESS ROADS SHALL
 BE PROVIDED
 FOR EVERY FACILITY, BUILDING, OR PORTION OF A BUILDING
 HEREAFTER
 CONSTRUCTED OR RELOCATED.
 18.2.3.1.2 FIRE DEPARTMENT ACCESS ROADS SHALL CONSIST
 OF ROADWAYS, FIRE
 LANES, PARKING LOT LANES, OR A COMBINATION THEREOF.
  
 18.2.3.4.1 DIMENSIONS.
 18.2.3.4.1.1 FIRE DEPARTMENT ACCESS ROADS SHALL HAVE AN
 UNOBSTRUCTED
 WIDTH OF NOT LESS THAN 20 FT (6.1 M).
  
  
 PLEASE REVIEW AND PROVIDE LOCATION(S)
  
  
 2) IT IS HIGHLY RECOMMENDED THAT THESE GATES BE
 PROVIDED WITH A KNOX PADLOCK FOR EMERGENCY INCIDENT
 ACCESS SHOULD THE GATE BE LOCAKED AT ANY TIME.
  
  
  
 3) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
  
  
 4) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2019-06-07 Cont ID  
Sent By dbattles Date 2019-06-07 Time 12:24 Rev Time 0.00
Received By dbattles Date 2019-06-07 Time 12:24 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-06-03 Cont ID  
Sent By pvalenti Date 2019-06-03 Time 11:24 Rev Time 0.00
Received By pvalenti Date 2019-05-15 Time 14:35 Sent To  
Notes
2019-05-30 11:44:02ROUTED FROM ZONING TO PERMIT LIBRARIAN 5/30/19 EL
2019-05-16 14:35:58RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-05-13 Cont ID  
Sent By dbattles Date 2019-05-13 Time 15:58 Rev Time 0.00
Received By dbattles Date 2019-04-29 Time 14:02 Sent To  
Notes
2019-05-03 16:37:13ROUTED FROM ZONING TO PERMIT LIBRARIAN 5/3/2019 EL
2019-04-30 14:02:30ROUTED TO FIRE INBOX

Review Stop Z ZONING
Rev No 2 Status P Date 2019-05-30 Cont ID  
Sent By elevesqu Date 2019-05-22 Time 16:13 Rev Time 0.00
Received By elevesqu Date 2019-05-30 Time 11:43 Sent To FIRE
Notes
2019-05-30 11:43:42PROVISOS:
 1. PHASE II NOT TO BE INSTALLED UNTIL ROW PERMIT IS
 PAID FOR IN FULL
  
 2. NO MORE THAN 200 SF OF RENDERING/PROJECT INFO ON
 FENCE SCREEN PER STREET FRONTAGE
  
 LIZ LEVESQUE, URBAN DESIGN PLANNER
 561 822 1426
 [email protected]
2019-05-22 10:58:31MEETING WITH APPLICANT ON 5/30/19 EL

Review Stop Z ZONING
Rev No 1 Status F Date 2019-05-03 Cont ID  
Sent By elevesqu Date 2019-05-03 Time 16:36 Rev Time 0.00
Received By elevesqu Date 2019-05-03 Time 16:33 Sent To FIRE
Notes
2019-05-03 16:36:57SECTION 94-316: NO TEMPORARY CONSTRUCTION FENCE MAY BE
 ERECTED UNTIL A SITE PLAN DEPICTING THE MATERIALS,
 LOCATION AND ACCESS GATES HAS BEEN APPROVED AS PART OF
 THE FENCE PERMIT ISSUANCE.
  
 PLEASE PROVIDE INFORMATION ON FENCE MATERIAL AND
 LOCATION OF ACCESS GATES.
  
 SCREENING DETAILS SHALL BE SUBMITTED WITH THE TEMPORARY
 CONSTRUCTION FENCE PERMIT APPLICATION. WIND SCREENING
 SHALL BE SUBSTANTIAL ENOUGH TO AVOID RIPS OR TEARS DUE
 TO WIND OR SUN, AND SHALL HAVE NO LESS THAN 85 PERCENT
 OPACITY.
  
 LIZ LEVESQUE, URBAN DESIGN PLANNER
 [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved