Plan Review Details - Permit 19041269
Plan Review Stops For Permit 19041269
Review Stop ENG ENGINEERING CSD
Rev No 1 Status N Date 2019-04-29 Cont ID  
Sent By thunt Date 2019-04-29 Time 09:32 Rev Time 0.00
Received By thunt Date 2019-04-29 Time 09:32 Sent To  
Notes
2019-04-29 09:33:39INSIDE UNDER THE FIXTURE OF A 3-COMPARTMENT SINK. ENG
 REVIEW NOT REQUIRED.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-04-29 Cont ID  
Sent By thunt Date 2019-04-29 Time 09:33 Rev Time 0.00
Received By thunt Date 2019-04-24 Time 13:39 Sent To  
Notes
2019-04-25 13:39:35PLUMBING <5K

Review Stop P PLUMBING
Rev No 1 Status F Date 2019-04-29 Cont ID  
Sent By thunt Date 2019-04-29 Time 09:32 Rev Time 0.00
Received By thunt Date 2019-04-29 Time 09:32 Sent To  
Notes
2019-04-29 09:32:42PLUMBING 1ST REVIEW**DENIED**
  
 1) PROVIDE HOW THE SYSTEM WAS SIZED AND IS IN
 COMPLIANCE WITH EITHER PDI G101, PDI G102, OR FAC
 64E-6. FBC-P 1003.3.4
  
 2) AAV'S ARE NOT PERMITTED AS IT ALLOWS THE TANK TO
 BECOME AIR BOUND AND THE MANUFACTURE ALSO CALLS FOR A
 INTAKE VENT TO BE REVENTED TOGETHER AND VENT TO THE
 OUTDOORS. FBC 1003.2, 1003.9
  
 3) P-TRAP, INLET, OUTLET, AND HORIZONTAL BRANCH SHALL
 BE MIN 3". EACH OF THE COMPARTMENTS IS 2 DFU'S AND THE
 HAND SINK IS ANOTHER 2DFU'S TOTALING 8 DFU'S.MAX DFU'S
 PERMITTED ON 2" IS 6. FBC-P 710.1
  
 4) IS THIS INTERCEPTOR TO BE INSTALLED ABOVE OR BELOW
 GROUND? FBC 107.2.1
  
  
 TIM HUNT
 PLUMBING PLANS EXAMINER/ PLUMBING INSPECTOR
 CITY OF WEST PALM BEACH
 561-248-2703
 [email protected]
 THUNT@CGASOLU


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved