| 2019-04-17 16:38:35 | GAS 1ST REVIEW**DENIED** |
| | |
| | 1) VALUE OF JOB MUST INCLUDE THE COST OF THE PIZZA |
| | OVEN. PROVIDE SIGNED BONA FIDE CONTRACT WITH THE COST |
| | OF THE PIZZA OVEN. WPB AMEND TO FBC 109.3 |
| | |
| | 2) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL |
| | PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE |
| | CORRUGATED STAINLESS STEEL TUBING (IF APPLICABLE) FOR |
| | EACH PIPE SIZE. WPB AMENDMENTS TO FBC SEC.107.2.1. |
| | |
| | 3)TYPE OF GAS (LP OR NATURAL).WPB AMEND. TO FBC SEC. |
| | 107.2.1. |
| | |
| | 4) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL |
| | BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC-FUEL GAS |
| | SECS.401.8, 402.2, AND TABLES 402.4 (1) THRU 402.4 (37) |
| | |
| | 5)SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| | METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2017 |
| | FBC-FUEL GAS SEC.402.4.1, 402.4.2, |
| | |
| | 6)INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM ON |
| | THE PLAN PER 2017 FBC-FUEL GAS SEC.402.1, 402.4.3 THRU |
| | 402.6 |
| | |
| | 7) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / |
| | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY |
| | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND |
| | FBC-2017 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2017 |
| | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED |
| | AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS |
| | APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF |
| | INSPECTION. FGC SEC.305.1 |
| | |
| | 8) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE ADDED GAS |
| | APPLIANCES. WHERE COMBUSTION AIR IS PROVIDED BY THE |
| | BUILDING?S MECHANICAL VENTILATION SYSTEM, THE SYSTEM |
| | SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN |
| | ADDITION TO THE REQUIRED VENTILATION AIR. 2017 FBC-FUEL |
| | GAS SEC.304.9.3 |
| | |
| | 9) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES |
| | USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE |
| | PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM |
| | THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE |
| | DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC-FUEL |
| | GAS SECS. 401.4, 401.8, 402.3, AND TABLES 402.4 (1) |
| | THRU 402.4 (37) |
| | |
| | 10) SUBMIT THE VENTING SYSTEM AND AND ROOF DETAIL |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | TIM HUNT |
| | PLUMBING PLANS EXAMINER |
| | BUILDING DIVISION |
| | CITY OF WEST PALM BEACH |
| | 401 CLEMATIS STREET, 1ST FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | 561-248-2703 |
| | [email protected] |
| | [email protected] |
| | |
| | |
| | |
| | |