| 2019-08-08 11:58:34 | 1) PLEASE PROVIDE A RESPONSE NARRATIVE THAT CLEARLY |
| | DESCRIBES THE CHANGES BEING MADE TO THE PLUMBING SYSTEM |
| | AND THAT RESPONDS TO THE PREVIOUS PLAN REVIEW COMMENTS |
| | DATED 6/20/19 AND ALSO TO THESE COMMENTS.. WPB AMEND. |
| | TO FBC SEC. 107.2.1. |
| | 2) INSERT THE REVISED PLUMBING PLANS INTO THE MASTER |
| | SET OF PLANS.WPB AMEND. TO FBC SEC. 107.1. |
| | 3) IT IS OBVIOUS THE DEVELOPED LENGTH DISTANCE FROM THE |
| | SOURCE OF HOT WATER TO THE FIXTURES THAT REQUIRES HOT |
| | WATER EXCEEDS 50 FEET. THEREFORE A HOT WATER |
| | RECIRCULATING SYSTEM WILL BE REQUIRED PER 2017 |
| | FBC-PLUMBING SEC.607.2. 3RD REQUEST. |
| | 4) THE HOT WATER SYSTEM SHALL BE INSULATED IN |
| | ACCORDANCE WITH 2017 FBC-PLUMBING SEC.607.5 AND THE |
| | 2017 FBC-ENERGY SEC. C404.4 AND TABLE C403.2.10. |
| | 5) A RECIRCULATING PUMP IS REQUIRED ON THE |
| | RECIRCULATION SYSTEM AND MUST BE INSTALLED IN |
| | ACCORDANCE WITH 2017 FBC-ENERGY SEC.C404.6.1. |
| | 6) A MOP SINK IS REQUIRED FOR THIS OCCUPANCY PER 2017 |
| | FBC-PLUMBING TABLE. 403.1. 3RD REQUEST. |
| | 7) SUBMIT A COMPLETE KITCHEN EQUIPMENT SCHEDULE. THERE |
| | ARE SYMBOLS USED FOR KITCHEN EQUIPMET ON SHT. P1.1. |
| | THAT ARE NOT ON THE SCHEDULE ON SHT. P0.1. CLARIFY. |
| | 8) SHT.P1.2 HAS A NOTE THAT STATES THE MOP SINK WILL BE |
| | INSTALLED UNDER A SEPARATE PERMIT. WHY IS THIS BEING |
| | DONE? THE MOP SINK SHALL BE INSTALLED UNDER THIS PERMIT |
| | NUMBER AND SHALL CONNECT TO THE GREASE INTERCEPTOR. |
| | 2017 FBC-PLUMBING SEC.1003..3.1. |
| | 9) THIS SUBMITTAL IS CONFUSING. THE REVISED PLUMBING |
| | PLANS HAVE AN ADDRESS ON THEM AS 518 S. DIXIE HWY.AND |
| | THE OTHER PLANS NOTE THE ADDRESS AS 327 HIBISCUS. |
| | CLARIFY. IN ADDITION, REVISED SHEET S-102R SHOWS |
| | INDIVIDUAL TENANT SPACES BUT THESE SPACES ARE NOT SHOWN |
| | ON ANY OTHER PLAN. CLARIFY. |
| | 10) SHT.P1.2 - SHOWS TWO TANKLESS WAATER HEATERS BUT |
| | THE DETAIL ON SHT. P0.1 ONLY SHOWS ONE. IF THESE ARE |
| | PIPED IN SERIES, BOTH WATER HEATERS SHALL BE SHOWN ON |
| | THE DETAIL. WPB AMEND. TO FBC-SEC.107.2.1. |
| | 11) 3RD REQUEST.HALLWAY FLOOR DRAINS ARE NOT INSTALLED |
| | AS THIS REVISION SHOWS AND ARE ALREADY INSTALLED. |
| | PLEASE CLARIFY. FBC 107.2.1 |
| | 12) SHT. P1.1 - THE HAND SINK (B7) AND FIXTURE B2 |
| | DUMPING INTO FLOOR SINKS IN THE COFFEE BAR AREA SHALL |
| | DISCHARGE TO THE GREASE WASTE SYSTEM. FBC 1003.3.1. |
| | 13) SHT.P1.1 - IDENTIFY EQUIPMENT # D1A, D4, D5, D6, D7 |
| | D16A, #K32 THESE FIXTURES MAY HAVE TO DISCHARGE THROUGH |
| | THE GREASE WASTE SYSTEM. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |