Plan Review Details - Permit 19040527
Plan Review Stops For Permit 19040527
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2019-06-20 Cont ID  
Sent By rmcdouga Date 2019-06-20 Time 07:56 Rev Time 0.00
Received By rmcdouga Date 2019-06-20 Time 07:13 Sent To I
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2019-06-06 Cont ID  
Sent By rmcdouga Date 2019-06-06 Time 14:01 Rev Time 0.00
Received By rmcdouga Date 2019-06-06 Time 13:57 Sent To I
Notes
2019-06-06 14:01:22PLAN
 REVIEW COMMENTS
  
 3RD REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 SUBMITTAL IS DENIED BY BUILDING.
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE NEW SIGNED AND SEALED DRAWINGS THAT WERE
 SUBMITTED DO NOT HAVE THE SHOP DRAWING REVIEW STAMP
 FROM THE ARCHITECT (DESIGNER OF RECORDS).
 2) IN ORDER TO AVOID NEEDLESS DELAYS, PLEASE REVIEW
 SUBMITTALS FOR ERRORS PRIOR TO SUBMITTING THEM.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2019-05-23 Cont ID  
Sent By rmcdouga Date 2019-05-23 Time 16:36 Rev Time 0.00
Received By rmcdouga Date 2019-05-23 Time 16:36 Sent To I
Notes
2019-05-23 16:42:16PLAN
 REVIEW COMMENTS
  
 2ND REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 SUBMITTAL IS DENIED BY BUILDING.
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) ON SHEET 2 OF 10, THE MAXIMUM DESIGN LOAD PRESSURE
 FOR ZONE 5 IS SPECIFIED AS -407 PSF AND IT SHOULD -47
 PSF TO MATCH THE APPROVED PLANS. FBC 107.2.1 PLEASE
 CORRECT.
  
 2) IN ORDER TO AVOID NEEDLESS DELAYS, PLEASE REVIEW
 SUBMITTALS FOR ERRORS PRIOR TO SUBMITTING THEM.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-05-07 Cont ID  
Sent By rmcdouga Date 2019-05-07 Time 18:24 Rev Time 0.00
Received By rmcdouga Date 2019-05-07 Time 18:03 Sent To I
Notes
2019-05-07 18:23:51PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 SUBMITTAL IS DENIED BY BUILDING.
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE VULT WINDSPEED ON THE APPROVED PLANS IS 170 MPH
 AND ON SHEET 1 OF THE DOOR AND WINDOW ENGINEERING IT IS
 SPECIFIED AS 165 MPH. PLEASE COORDINATE THE TWO. FBC
 107.2.1
  
 2) THE MAXIMUM DESIGN LOAD PRESSURES FOR WALL ZONES 4
 AND 5 ON SHEET 1 OF THE DOOR AND WINDOW ENGINEERING IS
 LOWER THAN THE ONES SPECIFIED ON THE APPROVED PLANS.
 PLEASE COORDINATE THE TWO. FBC 107.2.1
 THE PLANS HAVE +35.2 PSF, -38.2 PSF FOR ZONE 4 AND
 +35.2 PSF, -47.0 PSF FOR ZONE 5.
  
 3) WHEN BEING SUBMITTED FOR PUBLIC RECORD, THE 10
 SHEETS OF DOOR AND WINDOW DRAWINGS FROM THE ENGINEER,
 THOMAS J. TWOMEY, P.E. ARE REQUIRED TO HAVE THE
 ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE AND SEAL IN
 ACCORDANCE WITH FAC 61G15-23.003 AND FS 471.
  

Review Stop HIST HISTORICAL
Rev No 4 Status P Date 2019-06-19 Cont ID  
Sent By fmittner Date 2019-06-19 Time 10:10 Rev Time 0.00
Received By fmittner Date 2019-06-19 Time 10:10 Sent To B
Notes
***NONE***

Review Stop HIST HISTORICAL
Rev No 3 Status P Date 2019-06-05 Cont ID  
Sent By fmittner Date 2019-06-05 Time 14:24 Rev Time 0.00
Received By fmittner Date 2019-06-05 Time 14:24 Sent To B
Notes
***NONE***

Review Stop HIST HISTORICAL
Rev No 2 Status P Date 2019-05-21 Cont ID  
Sent By fmittner Date 2019-05-21 Time 12:59 Rev Time 0.00
Received By fmittner Date 2019-05-21 Time 12:59 Sent To B
Notes
***NONE***

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2019-05-02 Cont ID  
Sent By fmittner Date 2019-05-02 Time 14:33 Rev Time 0.00
Received By fmittner Date 2019-05-02 Time 14:33 Sent To B
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2019-06-20 Cont ID  
Sent By rmcdouga Date 2019-06-20 Time 07:56 Rev Time 0.00
Received By rmcdouga Date 2019-06-12 Time 15:32 Sent To  
Notes
2019-06-13 15:32:59RESUB ROUTED TO HISTORIC INBOX

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2019-06-06 Cont ID  
Sent By rmcdouga Date 2019-06-06 Time 14:01 Rev Time 0.00
Received By rmcdouga Date 2019-05-30 Time 13:28 Sent To  
Notes
2019-05-31 13:28:27RESUB ROUTED TO HISTORIC INBOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-05-23 Cont ID  
Sent By rmcdouga Date 2019-05-23 Time 16:36 Rev Time 0.00
Received By rmcdouga Date 2019-05-13 Time 11:49 Sent To  
Notes
2019-05-14 11:49:58RESUB ROUTED TO HISTORIC INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-05-07 Cont ID  
Sent By rmcdouga Date 2019-05-07 Time 18:24 Rev Time 0.00
Received By rmcdouga Date 2019-04-10 Time 15:50 Sent To  
Notes
2019-04-11 15:50:13SUBMITTAL ROUTED TO HISTORIC INBOX