Plan Review Details - Permit 19040469
Plan Review Stops For Permit 19040469
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2019-08-08 Cont ID  
Sent By jgomez Date 2019-08-08 Time 14:11 Rev Time 0.00
Received By jgomez Date 2019-08-08 Time 13:35 Sent To  
Notes
2019-08-08 13:36:36BUILDING REVIEW APPROVED WITH PROVISO:
  
 1- ATTIC VENT RATIO ON PAGE 2 OF 5 WAS REVISED FROM
 1/150 TO 1/300. REVISE THE ATTIC VENT RATIO BACK TO
 1/150 OR PERSON PREPARING THE ENERGY CALCULATIONS TO
 PROVIDE COMPLETE DOCUMENTATION SHOWING COMPLIANCE WITH
 THE 1/300 RATIO AS REQUIRED BY THE EXCEPTION ON SEC.
 R806.2.
  
 2- BUILDER TO COMPLETE THE ENERGY PERFORMANCE LEVEL
 (EPL) DISPLAY CARD. SEC. R405.4.3 FBC- ENERGY
 CONSERVATION.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2019-07-09 Cont ID  
Sent By jgomez Date 2019-07-09 Time 18:25 Rev Time 0.00
Received By jgomez Date 2019-07-09 Time 15:40 Sent To  
Notes
2019-07-09 16:58:20NEW SINGLE FAMILY RESIDENCE (R3) THIRD BUILDING REVIEW
 CHECKLIST.
 CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS.
  
 NOTE:
 BUILDING REVIEW MAY BE APPROVED WITH PROVISO. PROVISO
 MEANS CONTRACTOR WILL SUBMIT REQUIRED INFORMATION AFTER
 THE PERMIT IS ISSUED BUT BEFORE INSPECTIONS TO AVOID
 CONFLICTS/DELAYS. REVISION FEES APPLY. CONTRACTOR TO
 ADVICE IF PROVISO OPTION IS PREFERRED AT THIS TIME OR
 IF RE-SUBMITTING REQUIRED INFORMATION BEFORE PERMIT
 ISSUANCE.
  
  
 ORIGINAL COMMENT:
 1- PROVIDE DRAINAGE PLAN SHOWING COMPLIANCE WITH THE
 FOLLOWING:
 SEC. R401.3 FBC-RESIDENTIAL (DRAINAGE).
 SEC. 107.2.5 CITY AMENDMENTS (SITE PLAN).
 SEC. 110.9 CITY AMENDMENTS (IMPACT OF CONSTRUCTION).
 NOTE: THERE IS NO MUCH ROOM ON THE REAR OF THE LOT.
 CLEARLY SHOW HOW RETAINING THE WATER IN THE REAR OF THE
 LOT WITHOUT DUMPING INTO THE NEIGHBOR'S PROPERTY.
  
 RESPONSE:
 SURVEY WAS REVISED AGAIN. NOW IT SHOWS A "DRY RETENTION
 AREA" ON THE FRONT OF THE LOT. A RETENTION AREA IS NOT
 REQUIRED ON THE FRONT OF THE LOT AND THIS IS NOT WHAT
 IT WAS REQUESTED ON MY PREVIOUS COMMENT. THE PREVIOUS
 SURVEY SHOWED A DRAINAGE FLOW DIRECTION ARROW GOING
 TOWARDS THE STREET. THIS WAS OK. THE RETENTION AREA IS
 NOT REQUIRED ON THE FRONT OF THE LOT, BUT IF CONTRACTOR
 WANTS TO BUILD A RETENTION AREA IS OK. THE CONCERN WAS
 ON THE REAR OF THE PROPERTY. NEED TO KEEP THE WATER
 WITHIN THE LOT AND NOT DRAINING TOWARDS THE NEIGHBOR'S
 PROPERTIES. THAT IS WHY THE PROPOSED BERM ON THE REAR
 OF THE PROPERTY WAS NOT ALLOWED. REVISE AS REQUIRED.
  
  
 2- ENERGY CALCULATIONS SUBMITTED:
 A) OK.
  
 B)OK.
  
 ORIGINAL COMMENT:
 C) PROVIDE THE NAME OF THE PERSON DOING THE
 CALCULATIONS AS REQUIRED BY SEC. R405.4.2.1 FBC-ENERGY
 CONSERVATION.
  
 RESPONSE:
 REPEAT COMMENT. THREE TIMES. NAME OF PERSON DOING THE
 CALCULATIONS WAS NOT PROVIDED. ONLY THE SIGNATURE WAS
 PROVIDED.
  
 D) OK.
  
 ORIGINAL COMMENT:
 E)WINDOW AREA SHOWN ON PAGE 3 OF 4 DOESN'T MATCH
 INFORMATION SHOWN ON PLANS. REVISE AS REQUIRED TO
 MATCH. SEC. R101.5.1.1.2 FBC-ENERGY CONSERVATION.
  
 RESPONSE:
 WINDOW AREA IS CORRECT NOW BUT THE BUILDING ORIENTATION
 WAS CHANGED. SEE PLANS AND REVISE AS REQUIRED. SEC.
 R101.5.1.1.2 FBC-ENERGY CONSERVATION.
 NOTE: TYPICALLY PLANS ARE SHOWN WITH NORTH ARROW FACING
 UP. PLANS SUBMITTED SHOW NORTH ARROW FACING DOWN. KEEP
 THIS IN CONSIDERATION WHEN REVISING THE ENERGY
 CALCULATIONS.
  
 F) OK.
  
 NEW COMMENTS:
 G) NEW ENERGY CALCULATIONS SHOW ONLY ONE BEDROOM ON
 ITEM #4 OF PAGE 1 OF 5. THIS IS INCORRECT. SEE PLANS
 AND REVISE AS REQUIRED. SEC. R101.5.1.1.2 FBC-ENERGY
 CONSERVATION.
  
 H) REVISE DOORS INFORMATION ON SHEET 3 OF 5 TO MATCH
 PLANS AND PRODUCT APPROVALS. REVISE ORIENTATION OF
 DOORS. COORDINATE WITH ITEM #2(E) ABOVE. AND SEE
 PRODUCT APPROVALS FOR DOORS. EXTERIOR DOORS ARE NOT
 WOOD. SEC. R101.5.1.1.2 FBC-ENERGY CONSERVATION.
  
 I) CLARIFY SPACES INFORMATION SHOWN ON PAGE 2 OF 5. WHY
 CALCULATING FOUR OCCUPANTS ON ONE BEDROOM HOUSE?.
 COORDINATE WITH ITEM #2(G) ABOVE. SEC. R101.5.1.1.2
 FBC-ENERGY CONSERVATION.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 PLEASE, INSERT CORRECTED PAGES INTO THE SUBMITTAL AND
 REMOVE/VOID THE PREVIOUSLY REVIEWED SHEETS.
 PLEASE DON'T STAPLE OLD DRAWINGS/DOCUMENTS . SUBMIT OLD
 DRAWINGS/DOCUMENTS FOR REFERENCE.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2019-06-26 Cont ID  
Sent By jgomez Date 2019-06-26 Time 13:08 Rev Time 0.00
Received By jgomez Date 2019-06-26 Time 10:35 Sent To  
Notes
2019-06-26 13:08:58NEW SINGLE FAMILY RESIDENCE (R3) SECOND BUILDING REVIEW
 CHECKLIST.
 CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS.
  
 NOTE:
 BUILDING REVIEW MAY BE APPROVED WITH PROVISO. PROVISO
 MEANS CONTRACTOR WILL SUBMIT REQUIRED INFORMATION AFTER
 THE PERMIT IS ISSUED BUT BEFORE INSPECTIONS TO AVOID
 CONFLICTS/DELAYS. REVISION FEES APPLY. CONTRACTOR TO
 ADVICE IF PROVISO OPTION IS PREFERRED AT THIS TIME OR
 IF RE-SUBMITTING REQUIRED INFORMATION BEFORE PERMIT
 ISSUANCE.
  
  
  
 ORIGINAL COMMENT:
 1- PROVIDE DRAINAGE PLAN SHOWING COMPLIANCE WITH THE
 FOLLOWING:
 SEC. R401.3 FBC-RESIDENTIAL (DRAINAGE).
 SEC. 107.2.5 CITY AMENDMENTS (SITE PLAN).
 SEC. 110.9 CITY AMENDMENTS (IMPACT OF CONSTRUCTION).
 NOTE: THERE IS NO MUCH ROOM ON THE REAR OF THE LOT.
 CLEARLY SHOW HOW RETAINING THE WATER IN THE REAR OF THE
 LOT WITHOUT DUMPING INTO THE NEIGHBOR'S PROPERTY.
  
 RESPONSE:
 SURVEY WAS REVISED. BUT IT DOESN'T PROVIDE
 SPECIFICATIONS OF HOW TO KEEP THE WATER WITHIN THIS
 LOT. BASED ON THE GRADE ELEVATION SHOWN, IT LOOKS LIKE
 THE INTENTION IS TO CREATE A BERM ON THE REAR OF THE
 PROPERTY. THIS IS NOT ACCEPTABLE. NEED TO KEEP THE
 WATER WITHIN THE LOT. A BERM WILL DIRECT WATER TO THE
 ADJACENT PROPERTIES. NEED TO KEEP THE WATER WITHIN THE
 SITE. REVISE AS REQUIRED.
  
 2- ENERGY CALCULATIONS SUBMITTED:
 A) OK.
  
 B)OK.
  
 ORIGINAL COMMENT:
 C) PROVIDE THE NAME OF THE PERSON DOING THE
 CALCULATIONS AS REQUIRED BY SEC. R405.4.2.1 FBC-ENERGY
 CONSERVATION.
  
 RESPONSE:
 REPEAT COMMENT. NAME OF PERSON DOING THE CALCULATIONS
 WAS NOT PROVIDED.
  
 ORIGINAL COMMENT:
 D) ACCORDING TO PROJECT INFORMATION ON TOP OF PAGE 2 OF
 4, THE HOUSE WAS ROTATED 180 DEGREES. CLARIFY WHY ITEM
 #5 ON PAGE 1 OF 4 STATES THAT THIS IS NOT A WORST CASE
 SCENARIO AND THEN THE HOUSE IS ROTATED 180 DEGREES?.
 CALCULATIONS NEED TO BE DONE FOR THE ACTUAL ORIENTATION
 OF THE HOUSE AS REQUIRED BY SEC. R405.4.2.1 FBC-ENERGY
 CONSERVATION. REVISE CALCULATIONS AS REQUIRED.
  
 RESPONSE:
 REPEAT COMMENT. NOT ADDRESSED. CALCULATIONS WERE NOT
 REVISED.
  
 ORIGINAL COMMENT:
 E)WINDOW AREA SHOWN ON PAGE 3 OF 4 DOESN'T MATCH
 INFORMATION SHOWN ON PLANS. REVISE AS REQUIRED TO
 MATCH. SEC. R101.5.1.1.2 FBC-ENERGY CONSERVATION.
  
 RESPONSE:
 REPEAT COMMENT. NOT ADDRESSED. CALCULATIONS WERE NOT
 REVISED.
  
 ORIGINAL COMMENT:
 F) BUILDER TO COMPLETE THE ENERGY PERFORMANCE LEVEL
 (EPL) DISPLAY CARD. SEC. R405.4.3 FBC- ENERGY
 CONSERVATION.
  
 RESPONSE:
 REPEAT COMMENT. NOT ADDRESSED. CALCULATIONS WERE NOT
 REVISED.
  
  
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 PLEASE, INSERT CORRECTED PAGES INTO THE SUBMITTAL AND
 REMOVE/VOID THE PREVIOUSLY REVIEWED SHEETS.
 PLEASE DON'T STAPLE OLD DRAWINGS/DOCUMENTS . SUBMIT OLD
 DRAWINGS/DOCUMENTS FOR REFERENCE.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-05-16 Cont ID  
Sent By cthroop Date 2019-05-16 Time 18:18 Rev Time 0.00
Received By jgomez Date 2019-05-16 Time 14:56 Sent To  
Notes
2019-05-16 18:18:44NEW SINGLE FAMILY RESIDENCE (R3) BUILDING REVIEW
 COMMENTS
 CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS.
  
 1- PROVIDE DRAINAGE PLAN SHOWING COMPLIANCE WITH THE
 FOLLOWING:
 SEC. R401.3 FBC-RESIDENTIAL (DRAINAGE).
 SEC. 107.2.5 CITY AMENDMENTS (SITE PLAN).
 SEC. 110.9 CITY AMENDMENTS (IMPACT OF CONSTRUCTION).
 NOTE: THERE IS NO MUCH ROOM ON THE REAR OF THE LOT.
 CLEARLY SHOW HOW RETAINING THE WATER IN THE REAR OF THE
 LOT WITHOUT DUMPING INTO THE NEIGHBOR'S PROPERTY.
  
 2- THE ADDRESS OF THE JOB SHOWN ON PLANS IS INCOMPLETE.
 ALL PLANS NEED TO HAVE THE COMPLETE ADDRESS OF THE
 PROPOSED HOUSE. SEC. 107.2.1 CITY AMENDMENTS.
  
 3- ENERGY CALCULATIONS SUBMITTED:
 A) THE BUILDING OWNER, THE ARCHITECT OR OTHER
 AUTHORIZED AGENT LEGALLY DESIGNATED BY THE OWNER SHALL
 CERTIFY AT THE BOTTOM OF THE FORM THAT THE BUILDING IS
 IN COMPLIANCE WITH THE CODE PRIOR TO RECEIVING THE
 PERMIT AS REQUIRED BY SEC. R103.1.1.2 FBC-ENERGY
 CONSERVATION.
  
 B)PROVIDE COMPLETE INFORMATION ON TOP OF FORM,
 INCLUDING PROJECT ADDRESS, BUILDER'S NAME, PERMIT
 OFFICE, JURISDICTION, ETC. SEC. R101.5.1.1.2 FBC-ENERGY
 CONSERVATION.
  
 C) PROVIDE THE NAME OF THE PERSON DOING THE
 CALCULATIONS AS REQUIRED BY SEC. R405.4.2.1 FBC-ENERGY
 CONSERVATION.
  
 D) ACCORDING TO PROJECT INFORMATION ON TOP OF PAGE 2 OF
 4, THE HOUSE WAS ROTATED 180 DEGREES. CLARIFY WHY ITEM
 #5 ON PAGE 1 OF 4 STATES THAT THIS IS NOT A WORST CASE
 SCENARIO AND THEN THE HOUSE IS ROTATED 180 DEGREES?.
 CALCULATIONS NEED TO BE DONE FOR THE ACTUAL ORIENTATION
 OF THE HOUSE AS REQUIRED BY SEC. R405.4.2.1 FBC-ENERGY
 CONSERVATION. REVISE CALCULATIONS AS REQUIRED.
  
 E)WINDOW AREA SHOWN ON PAGE 3 OF 4 DOESN'T MATCH
 INFORMATION SHOWN ON PLANS. REVISE AS REQUIRED TO
 MATCH. SEC. R101.5.1.1.2 FBC-ENERGY CONSERVATION.
  
 F) BUILDER TO COMPLETE THE ENERGY PERFORMANCE LEVEL
 (EPL) DISPLAY CARD. SEC. R405.4.3 FBC- ENERGY
 CONSERVATION.
  
 4- VALUATION DECLARED IN THE PERMIT APPLICATION IS TOO
 LOW. VALUATION TO INCLUDE ALL LABOR, MATERIALS,
 CONTRACTOR'S OVERHEAD AND PROFIT AND DESIGN
 PROFESSIONAL FEES AS REQUIRED BY SEC. 109.3 CITY
 AMENDMENTS. VALUATION WAS UPDATED TO $196,950. THE
 PERMIT FEE BALANCE IS $3937.32.
  
 5- OWNER IS APPLYING FOR AN OWNER/BUILDER PERMIT UNDER
 THE SECTION 489.103 FLORIDA STATUTES. ACCORDING TO
 PROPERTY APPRAISER RECORDS, THE OWNER ALSO OWN OTHER 6
 HOUSES/PROPERTIES. PLEASE CLARIFY PURPOSE OF THE
 CONSTRUCTION OF THIS HOUSE FOR THE RECORDS. A LICENSED
 CONTRACTOR MAY BE REQUIRED IF THE HOUSE IS GOING TO BE
 SOLD OR RENTED WITHIN ONE YEAR AFTER THE CONSTRUCTION
 IS COMPLETE.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 PLEASE, INSERT CORRECTED PAGES INTO THE SUBMITTAL AND
 REMOVE/VOID THE PREVIOUSLY REVIEWED SHEETS.
 PLEASE DON'T STAPLE OLD DRAWINGS/DOCUMENTS . SUBMIT OLD
 DRAWINGS/DOCUMENTS FOR REFERENCE.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2019-06-26 Cont ID  
Sent By jpearson Date 2019-06-26 Time 13:55 Rev Time 0.00
Received By jpearson Date 2019-06-26 Time 13:55 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2019-05-02 Cont ID  
Sent By jpearson Date 2019-05-02 Time 09:56 Rev Time 0.00
Received By jpearson Date 2019-05-02 Time 09:56 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2019-04-26 Cont ID  
Sent By fgiaquin Date 2019-04-26 Time 06:47 Rev Time 0.00
Received By fgiaquin Date 2019-04-26 Time 06:01 Sent To  
Notes
2019-04-26 06:46:57ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 1. ELECTRICAL PLAN IS REQUIRED TO BE SIGNED BY PERSON
 RESPONSIBLE FOR THE DESIGN. PROVIDE CORRECTION. FS
 481.229; WPB FBC 107.2.1, 107.3.5.1.2
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE
 PREVIOUSLY REVIEWED SHEETS.
 CODES IN EFFECT:
  
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA
 BUILDING CODE 2017 6TH ED.
 FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2017
 6TH EDITION
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 V/R,
  
 FRANK GIAQUINTO III
 ELECTRICAL INSPECTOR
 ELECTRICAL PLANS EXAMINER
 CITY OF WEST PALM BEACH
 [email protected]
 CELL: 561-657-1653
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2019-08-08 Cont ID  
Sent By jgomez Date 2019-08-08 Time 14:16 Rev Time 0.00
Received By jgomez Date 2019-07-12 Time 13:04 Sent To I
Notes
2019-07-15 13:04:10R16

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2019-07-09 Cont ID  
Sent By jgomez Date 2019-07-09 Time 18:28 Rev Time 0.00
Received By jgomez Date 2019-07-03 Time 15:17 Sent To  
Notes
2019-07-03 15:17:47RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-07-03 Cont ID  
Sent By cthroop Date 2019-07-03 Time 09:42 Rev Time 0.00
Received By cthroop Date 2019-05-31 Time 14:58 Sent To  
Notes
2019-06-03 14:58:26R17

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-05-16 Cont ID  
Sent By jgomez Date 2019-05-16 Time 18:20 Rev Time 0.00
Received By jgomez Date 2019-04-09 Time 09:55 Sent To I
Notes
2019-04-10 09:57:58R06

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 4 Status P Date 2019-08-14 Cont ID  
Sent By jgomez Date 2019-08-14 Time 09:57 Rev Time 0.00
Received By jgomez Date 2019-08-14 Time 09:50 Sent To  
Notes
2019-08-14 10:10:08$9,766.49 PAID. MU-2019-025270.

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 3 Status F Date 2019-07-09 Cont ID  
Sent By jgomez Date 2019-07-09 Time 17:43 Rev Time 0.00
Received By jgomez Date 2019-07-09 Time 17:43 Sent To  
Notes
2019-07-09 17:44:08IMPACT FEES - PAPER SUBMITTALS
 PLANS REQUIRE REVIEW BY THE PBC IMPACT FEE OFFICE. CALL
 (561) 233-5025. UPON APPROVAL OF PLANS, YOU MAY CHECK
 OUT ONE PLAN SET AND TAKE TO THAT OFFICE FOR REVIEW.
 PLEASE RETURNED STAMPED AND WITH A COPY OF THE RECEIPT
 AS APPLICABLE. PLEASE PROVIDE THE MUNICIPAL IMPACT FEE
 QUESTIONNAIRE FORM TO THE PBC IMPACT FEE OFFICE. THE
 FORM CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/AD
 MINISTRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF
  

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status F Date 2019-06-26 Cont ID  
Sent By jgomez Date 2019-06-26 Time 11:39 Rev Time 0.00
Received By jgomez Date 2019-06-26 Time 11:39 Sent To  
Notes
2019-06-26 11:39:52IMPACT FEES - PAPER SUBMITTALS
 PLANS REQUIRE REVIEW BY THE PBC IMPACT FEE OFFICE. CALL
 (561) 233-5025. UPON APPROVAL OF PLANS, YOU MAY CHECK
 OUT ONE PLAN SET AND TAKE TO THAT OFFICE FOR REVIEW.
 PLEASE RETURNED STAMPED AND WITH A COPY OF THE RECEIPT
 AS APPLICABLE. PLEASE PROVIDE THE MUNICIPAL IMPACT FEE
 QUESTIONNAIRE FORM TO THE PBC IMPACT FEE OFFICE. THE
 FORM CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/AD
 MINISTRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF
  

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2019-05-16 Cont ID  
Sent By jgomez Date 2019-05-16 Time 18:19 Rev Time 0.00
Received By jgomez Date 2019-05-16 Time 18:18 Sent To  
Notes
2019-05-16 18:19:39IMPACT FEES - PAPER SUBMITTALS
 PLANS REQUIRE REVIEW BY THE PBC IMPACT FEE OFFICE. CALL
 (561) 233-5025. UPON APPROVAL OF PLANS, YOU MAY CHECK
 OUT ONE PLAN SET AND TAKE TO THAT OFFICE FOR REVIEW.
 PLEASE RETURNED STAMPED AND WITH A COPY OF THE RECEIPT
 AS APPLICABLE. PLEASE PROVIDE THE MUNICIPAL IMPACT FEE
 QUESTIONNAIRE FORM TO THE PBC IMPACT FEE OFFICE. THE
 FORM CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/AD
 MINISTRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF
  

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2019-08-08 Cont ID  
Sent By jgomez Date 2019-08-08 Time 14:16 Rev Time 0.00
Received By jgomez Date 2019-08-08 Time 14:09 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2019-07-10 Cont ID  
Sent By cthroop Date 2019-07-03 Time 09:42 Rev Time 0.00
Received By cthroop Date 2019-07-03 Time 08:34 Sent To  
Notes
2019-07-10 09:12:03MECHANICAL PLAN REVIEW
 2017 FLORIDA BUILDING CODE, 6TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
  
 CHRISTOPHER S. THROOP, C.B.O.
 BUILDING PLANS EXAMINER, PX3169
 1&2 FAMILY PLANS EXAMINER, SFP306
 CONSTRUCTION SERVICES DIVISION
 TEL: 561-805-6726
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
 2ND REVIEW
  
 RESULTS: DENIED
  
 YOUR SUBMITTAL IS DEFICIENT FOR THE REASONS LISTED
 BELOW.
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 1. NEW ENERGY SUBMITTAL HAS WRONG BUILDING ORIENTATION.
 FRONT DOOR FACES NORTH. SEE PLAN PAGE 1-4.
 FBC 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 CORRECT AND RE-SUBMIT NEW ENERGY SUBMITTAL.
  
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2019-05-02 Cont ID  
Sent By ccole Date 2019-05-02 Time 12:38 Rev Time 0.00
Received By ccole Date 2019-05-02 Time 12:38 Sent To  
Notes
2019-05-06 16:25:481ST REVIEW FBC-2017 MECHANICAL
 PERMIT #19040469
  
 CODES IN EFFECT:
  
  
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC R- FLORIDA RESIDENTIAL CODE SIXTH EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SHEET M-1: RETURN AIR FROM THE GARAGE IS PROHIBITED
 PER SECTION M1602.2 FBC R. PROVIDE A DUCTED ENCLOSURE
 FROM THE 24X24 GRILL.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  

Review Stop P PLUMBING
Rev No 2 Status P Date 2019-06-12 Cont ID  
Sent By thunt Date 2019-06-12 Time 08:15 Rev Time 0.00
Received By thunt Date 2019-06-12 Time 06:43 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2019-04-18 Cont ID  
Sent By thunt Date 2019-04-18 Time 16:08 Rev Time 0.00
Received By thunt Date 2019-04-18 Time 16:08 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status P Date 2019-06-26 Cont ID  
Sent By jgomez Date 2019-06-26 Time 11:40 Rev Time 0.00
Received By jgomez Date 2019-06-26 Time 11:40 Sent To  
Notes
2019-06-26 11:41:03SHINGLES FL 10124-R20.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2019-05-16 Cont ID  
Sent By jgomez Date 2019-05-16 Time 18:19 Rev Time 0.00
Received By jgomez Date 2019-05-16 Time 18:19 Sent To  
Notes
2019-05-16 18:20:40SHINGLES FL 10124-R20.

Review Stop Z ZONING
Rev No 4 Status P Date   Cont ID  
Sent By   Date 2019-07-24 Time   Rev Time 0.00
Received By pgreilic Date 2019-07-24 Time 15:30 Sent To  
Notes
2019-07-24 15:31:011.) SEPARATE PERMITS REQUIRED FOR DRIVEWAY,
 LANDSCAPING, MECHANICAL EQUIPMENT ETC.
 2.) LANDSCAPE PERMIT REQUIRED
  
 PAUL GREILICH, SENIOR PLANNER
 561-822-1443
 [email protected]

Review Stop Z ZONING
Rev No 3 Status P Date   Cont ID  
Sent By   Date 2019-07-08 Time   Rev Time 0.00
Received By pgreilic Date 2019-07-08 Time 13:10 Sent To B
Notes
2019-07-08 13:11:421.) SEPARATE PERMITS REQUIRED FOR DRIVEWAY,
 LANDSCAPING, MECHANICAL EQUIPMENT ETC.
 2.) LANDSCAPE PERMIT REQUIRED
  
 PAUL GREILICH, SENIOR PLANNER
 561-822-1443
 [email protected]

Review Stop Z ZONING
Rev No 2 Status F Date   Cont ID  
Sent By   Date 2019-06-13 Time   Rev Time 0.00
Received By pgreilic Date 2019-06-13 Time 12:51 Sent To  
Notes
2019-06-13 12:52:091.) LABEL OVERALL HEIGHT ON ARCHITECTURAL ELEVATIONS
 WHERE APPLICABLE
 2.) LANDSCAPE PERMIT REQUIRED
  
 PAUL GREILICH, SENIOR PLANNER
 561-822-1443
 [email protected]

Review Stop Z ZONING
Rev No 1 Status P Date   Cont ID  
Sent By   Date 2019-04-15 Time   Rev Time 0.00
Received By pgreilic Date 2019-04-15 Time 11:01 Sent To  
Notes
2019-04-15 11:02:581.) LANDSCAPE PERMIT REQUIRED
 2.) SEPARATE PERMIT REQUIRED FOR DRIVEWAY, FENCING,
 GENERATOR ETC.
  
 PAUL GREILICH, SENIOR PLANNER
 561-822-1443
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved