Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2019-11-15 Cont ID  
Sent By pvalenti Date 2019-11-15 Time 11:11 Rev Time 0.00
Received By pvalenti Date 2019-11-15 Time 11:11 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-08-14 Cont ID  
Sent By pvalenti Date 2019-08-14 Time 11:29 Rev Time 0.00
Received By pvalenti Date 2019-08-14 Time 11:29 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-04-19 Cont ID  
Sent By sathomas Date 2019-04-18 Time 15:17 Rev Time 0.00
Received By jduprey Date 2019-04-19 Time 12:07 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2019-11-18 Cont ID  
Sent By jleahy Date 2019-11-18 Time 16:14 Rev Time 0.00
Received By jleahy Date 2019-11-18 Time 14:53 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2019-08-15 Cont ID  
Sent By jleahy Date 2019-08-15 Time 10:15 Rev Time 0.00
Received By jleahy Date 2019-08-15 Time 10:15 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2019-04-05 Cont ID  
Sent By jleahy Date 2019-04-05 Time 12:44 Rev Time 0.00
Received By jleahy Date 2019-04-05 Time 12:44 Sent To  
Notes
2019-04-05 13:00:06ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 FLORIDA BUILDING CODE 2017 6TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED
 NFPA 70 2014 EDITION
  
 JAKE LEAHY
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 1) VALUE OF THE WORK SHOWN IS TOO LOW, PLEASE SUBMIT A
 BREAK DOWN OF ALL EQUIPMENT AND LABOR FOR THE TOTAL JOB
 INSTALATION.
  
 FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING
 PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE
 TOTAL REPLACEMENT VALUE TO
 INCLUDE STRUCTURAL, ELECTRIC, PLUMBING, MECHANICAL,
 INTERIOR FINISH, RELATIVE SITE WORK, ARCHITECTURAL AND
 DESIGN FEES, MARKETING COSTS,
 OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE.
 VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED
 DATA OF NATIONAL CONSTRUCTION
 COST ANALYSIS SERVICES (MARSHALL-SWIFT, MEANS, ETC.),
 AS PUBLISHED BY INTERNATIONAL CODE CONGRESS. FINAL
 BUILDING PERMIT VALUATION
 SHALL BE SET BY THE BUILDING OFFICIAL.
  
 2) PLANS SHOW TWO EXISTING GENERATORS STAYING OR DEMO?
  
 3) CUT SHEETS FOR ALL EQUIPMENT INVOLVED WITH THIS
 INSTALLATION.
  
 4) PAGE E-1.1 COLOR CODE FOR HIGH VOLTAGE NEEDS TO BE
 CHECKED WITH THE EXISTING AND IS TO MATCH EXISTING
 COLOR CODE USED IN THE BUILDING.
  
 5) E-2 NEW FAULT CURRENT VALUES ARE SHOWN HOW WHERE
 THEY CALCULATED PLEASE SHOW.
  
 6) ATS AND GENERATOR HAVE BREAKERS THAT CAN OR ARE SET
 AT 1200 AMPERES THEY SHALL MEET THE REQUIREMENTS 240.87
  
 240.87 ARC ENERGY REDUCTION
 WHERE THE HIGHEST CONTINUOUS CURRENT TRIP SETTING FOR
 WHICH THE ACTUAL OVERCURRENT DEVICE INSTALLED IN A
 CIRCUIT BREAKER IS RATED
 OR CAN BE ADJUSTED IS 1200 A OR HIGHER, 240.87(A) AND
 (B) SHALL APPLY.
  
 (A) DOCUMENTATION. DOCUMENTATION SHALL BE AVAILABLE TO
 THOSE AUTHORIZED TO DESIGN, INSTA LL, OPERATE, OR
 INSPECT THE INSTALLATION
 AS TO THE LOCATION OF THE CIRCUIT BREAKER(S).
 (B) METHOD TO REDUCE CLEARING TIME. ONE OF THE
 FOLLOWING OR APPROVED EQUIVALENT MEANS SH ALL BE
 PROVIDED:
 (1) ZONE-SELECTIVE INTERLOCKING
 (2) DIFFERENTIAL RELAYING
 (3) ENERGY-REDUCING MAINTENANCE SWITCHING WITH LOCAL
 STATUS INDICATOR
 (4) ENERGY-REDUCING ACTIVE ARC FLASH MITIGATION SYSTEM
 (5) AN APPROVED EQUIVALENT MEANS
  
 7) PAGE E-6 WIRE SCHEDULE FOR #1 SHOWS 3-#10, 1-18-2 C,
 AND 1- CAT 5 PLEASE EXPLAIN.
  
 8) PAGE E-7 SIGNS NEED TO HAVE ONE THAT MEETS 445.11.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO
 PROVIDE A RESPONSE LETTER ADDRESSING EACH ITEM ALONG
 WITH THE CITY RESUBMITTAL FORM. ADDITIONALLY, INSERT
 CORRECTED PAGES INTO THE ORIGINAL
 SUBMITTAL AND REMOVE OR VOID THE PREVIOUSLY REVIEWED
 SHEETS.

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2019-11-13 Cont ID  
Sent By sathomas Date 2019-11-13 Time 00:00 Rev Time 0.00
Received By sathomas Date 2019-11-13 Time 00:00 Sent To M
Notes
2019-11-13 14:32:57PREVIOUS COMMENTS NOT ADDRESSED:
 1. MANUFACTURER PRODUCT SPECIFICATIONS NOT INCLUDED IN
 ITS ENTIRETY.
 2. LOAD TEST PAPERWORK SHALLL BE REQUIRED UPON CALLING
 IN FOR AN ELECTICAL TRANSFER LOAD TEST.
 3. GENERATOR IS TO BE TESTED IN COMPLIANCE WITH NFPA
 110:
  
 1.1 THIS STANDARD CONTAINS REQUIREMENTS COVERING THE
 PERFORMANCE OF EMERGENCY AND STANDBY POWER SYSTEMS
 PROVIDING AN ALTERNATE SOURCE OF ELECTRICAL POWER TO
 LOADS IN BUILDINGS
 AND FACILITIES IN THE EVENT THAT THE PRIMARY POWER
 SOURCE FAILS.
 1.1.1 POWER SYSTEMS COVERED IN THIS STANDARD INCLUDE
 POWER SOURCES, TRANSFER EQUIPMENT, CONTROLS,
 SUPERVISORY EQUIPMENT, AND ALL RELATED ELECTRICAL AND
 MECHANICAL AUXILIARY AND ACCESSORY EQUIPMENT NEEDED TO
 SUPPLY ELECTRICAL POWER TO THE LOAD TERMINALS OF THE
 TRANSFER EQUIPMENT.
 1.1.2 THIS STANDARD COVERS INSTALLATION, MAINTENANCE,
 OPERATION, AND TESTING REQUIREMENTS AS THEY PERTAIN TO
 THE PERFORMANCE
 OF THE EMERGENCY POWER SUPPLY SYSTEM (EPSS).
  
 7.1.3 THE EPSS EQUIPMENT SHALL BE INSTALLED AS REQUIRED
 TO MEET THE USER?S NEEDS AND TO BE IN ACCORDANCE WITH
 ALL OF THE FOLLOWING:
 (1) THIS STANDARD
 (2) THE MANUFACTURER?S SPECIFICATIONS
 (3) THE AUTHORITY HAVING JURISDICTION
  
  
 NOTE: SHEET A,1 AND SD2 ARE NOT INCLUDED IN THIS PACKET
 SUBMISSION.
  
 S. THOMAS
 561-804-4728

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2019-08-07 Cont ID  
Sent By pleduc Date 2019-08-07 Time   Rev Time 0.00
Received By pleduc Date 2019-08-07 Time 14:43 Sent To E
Notes
2019-08-07 14:50:44THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
  
 1) PLEASE BE ADVISED, THAT THE COMMENT RESPONSE THAT
 THIS INSTALLATION DOES NOT FALL UNDER NFPA 110, MAY NOT
 BE ACCEPTED.
  
 PER NFPA 110
  
 CHAPTER 1 ADMINISTRATION
 1.1 SCOPE. THIS STANDARD CONTAINS REQUIREMENTS COVERING
 THE
 PERFORMANCE OF EMERGENCY AND STANDBY POWER SYSTEMS
 PROVIDING
 AN ALTERNATE SOURCE OF ELECTRICAL POWER TO LOADS IN
 BUILDINGS
 AND FACILITIES IN THE EVENT THAT THE PRIMARY POWER
 SOURCE
 FAILS.
 1.1.1 POWER SYSTEMS COVERED IN THIS STANDARD INCLUDE
 POWER
 SOURCES, TRANSFER EQUIPMENT, CONTROLS, SUPERVISORY
 EQUIPMENT,
 AND ALL RELATED ELECTRICAL AND MECHANICAL AUXILIARY AND
 ACCESSORY
 EQUIPMENT NEEDED TO SUPPLY ELECTRICAL POWER TO THE LOAD
 TERMINALS OF THE TRANSFER EQUIPMENT.
  
 THIS INSTALLATION APPEARS TO BE PROVIDING POWER TO THE
 ENTIRE BUILDING AND SUBSEQUENTLY IS REQUIRED TO COMPLY
 WITH THIS CODE.
  
 THE PREVIOUS COMMENTS REMAIN APPLICABLE; HOWEVER, THIS
 PERMIT WAS PROVISO'D IN AN EFFORT TO NOT FURTHER DELAY
 THIS PROJECT.
  
 PLEASE REVIEW AND ENSURE COMPLIANCE AS THIS IS HOW IT
 WILL BE INSPECTED AND TESTED WITH.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2019-04-18 Cont ID  
Sent By sathomas Date 2019-04-18 Time 00:00 Rev Time 0.00
Received By sathomas Date 2019-04-18 Time 00:00 Sent To B
Notes
2019-04-18 15:13:27UPDATE THE CODE LIST TO REFERENCE THE 6TH EDITION OF
 THE FLORIDA FIRE PREVENTION CODE WHICH CONTAINS THE
 2015 EDITION OF BOTH NFPA 1 AND NFPA 101 WITH FLORIDA
 AMENDMENTS.
 MANUFACTURER SPECS SHALL PROVIDED FOR GENERATOR TO BE
 INSTALLED.
 GENERATOR IS TO BE TESTED IN COMPLIANCE WITH CHAPTERS 7
 & 8 OF NFPA 110.
 ADDITIONALLY, LOAD TEST PAPERWORK SHALLL BE REQUIRED
 UPON CALLING IN FOR A LOAD TEST.
  
 S. THOMAS
 561-804-4728

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2019-11-26 Cont ID  
Sent By cpuell Date 2019-11-26 Time 10:05 Rev Time 0.00
Received By cpuell Date 2019-10-11 Time 13:49 Sent To  
Notes
2019-10-15 13:49:56RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-08-15 Cont ID  
Sent By jleahy Date 2019-08-15 Time 10:15 Rev Time 0.00
Received By jleahy Date 2019-07-29 Time 15:22 Sent To  
Notes
2019-07-30 15:23:02RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-04-19 Cont ID  
Sent By jduprey Date 2019-04-19 Time 12:17 Rev Time 0.00
Received By jduprey Date 2019-03-20 Time 13:56 Sent To  
Notes
2019-03-21 13:57:05ROUTED TO ZONING INBOX

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2019-11-15 Cont ID  
Sent By pvalenti Date 2019-11-15 Time 11:18 Rev Time 0.00
Received By pvalenti Date 2019-11-15 Time 11:18 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2019-08-14 Cont ID  
Sent By pvalenti Date 2019-08-14 Time 13:59 Rev Time 0.00
Received By pvalenti Date 2019-08-14 Time 13:59 Sent To  
Notes
2019-08-14 14:02:16PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
 FBC M = FBC MECHANICAL
  
 2ND MECHANICAL REVIEW APPROVED WITH PROVISO:
  
 AT TIME OF INSPECTION, PLEASE PROVIDE THE U.L. 2200
 CERTIFICATE OF COMPLIANCE (TO BE SUBMITTED) FOR THE
 GENERATOR.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2019-04-11 Cont ID  
Sent By ccole Date 2019-04-11 Time 15:11 Rev Time 0.00
Received By ccole Date 2019-04-11 Time 15:06 Sent To FIRE
Notes
2019-04-11 15:19:16 
 1ST REVIEW FBC-2017 MECHANICAL
 PERMIT
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FBC R- FLORIDA RESIDENTIAL CODE SIXTH EDITION 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 GENERATOR, FUEL PIPING, ENGINE EXHAUST PIPE, MUFFLER,
 AND ALL OTHER ASSOCIATED SYSTEM COMPONENTS- SECTION
 304.1 FBC M.
  
 2) SUBMIT THE UL 2200 CERTIFICATE OF COMPLIANCE FOR THE
 GENERATOR- SECTION 915.1 FBC M. THE MANUFACTURER'S
 SPECIFICATIONS AND/OR UL CERTIFICATE SHALL INDICATE THE
 GENERATOR IS IN COMPLIANCE WITH NFPA 37.
  
 3) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE FUEL
 TANK THAT INCLUDES THE TANK'S UL LISTING- UL 142 OR UL
 2085- SEE SECTION 21.4.2.1.1 NFPA 30.
  
 4) PROVIDE AN EXHAUST PIPE DIAGRAM SHOWING THE TOTAL
 SYSTEM RUN AND LENGTH MEASUREMENT, AND TERMINATION
 LOCATION, AND CLEARANCE DISTANCES GRAVITY OR MECHANICAL
 AIR INTAKES INTO THE BUILDING PLEASE INCLUDE ALL
 COMPONENTS OF THE SYSTEM INCLUDING THE SILENCER.- SEE
 SECTION 8.1- 8.4 NFPA 37, AND SECTION 501.3.1 FBC M.
  
 5) PROVIDE DETAILS AND SPECIFICATIONS FOR NORMAL AND
 EMERGENCY RELIEF VENTING OF THE TANK, INCLUDING VENT
 PIPING RUNS AND TERMINATION LOCATIONS- SECTION 24.13
 NFPA 30.
  
 6) PROVIDE WIND LOAD ENGINEERING FOR ATTACHMENT OF THE
 GENERATOR TO THE ROOF STRUCTURE- SECTION 301.15 FBC M.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop P PLUMBING
Rev No 3 Status P Date 2019-11-25 Cont ID  
Sent By abelisle Date 2019-11-25 Time 15:23 Rev Time 0.00
Received By abelisle Date 2019-11-25 Time 15:11 Sent To I
Notes
2019-11-25 15:22:5611/25/19 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 A.BELISLE
 PLUMBING PLAN EXAMINER
  

Review Stop P PLUMBING
Rev No 2 Status F Date 2019-08-12 Cont ID  
Sent By tklarge Date 2019-08-12 Time 08:50 Rev Time 0.00
Received By tklarge Date 2019-08-12 Time 06:33 Sent To  
Notes
2019-08-12 08:49:281) SUBMIT TWO COPIES OF THE UL 142 CERTIFICATION FOR
 THE FUEL TANK.WPB AMEND. TO FBC SEC. 107.2.1. THE
 RESPONSE STATES "WILL COMPY." WHEN? THE DOCUMENT IS
 REQUIRED TO BE SUBMITTED AT THIS TIME. 2ND REQUEST.
 2) SUBMIT TWO COPIES OF THE APPROVAL FROM THE PALM
 BEACH COUNTY DEPARTMENT OF ENVIRONMENTAL RESOURCE
 MANAGEMENT FOR THE FUEL TANK AND COMPLIANCE WITH PALM
 BEACH COUNTY ORDINANCE 2015-008. THIS DOCUMENT IS
 REQUIRED TO BE SUBMITTED AT THIS TIME. 2ND REQUEST.
 3) SUBMIT DETAILS AS TO HOW THE GENERATOR IS PROTECTED
 AGAINST UNAUTHORIZED ACCESS, TAMPERING AND TRESPASSING.
 NFPA 30 SEC. 15.3.6, WPB AMEND. TO FBC SEC. 107.2.1. IS
 THE GENERATOR SURROUNDED BY A LOCKED CHAIN LINK FENCE.
 BE SPECIFIC AND NOTE ON THE PLAN.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2019-04-02 Cont ID  
Sent By tklarge Date 2019-04-02 Time 05:41 Rev Time 0.00
Received By tklarge Date 2019-03-29 Time 14:29 Sent To  
Notes
2019-03-29 14:44:391) SUBMIT A COPY OF THE UL 142 CERTIFICATION FOR THE
 FUEL TANK.WPB AMEND. TO FBC SEC. 107.2.1.
 2) SUBMIT DETAILS FOR THE TYPE OF ENCLOSURE FOR THE
 GENERATOR.WPB AMEND. TO FBC SEC. 107.2.1.
 3) SUBMIT A COPY OF THE APPROVAL FROM THE PALM BEACH
 COUNTY DEPARTMENT OF ENVIRONMENTAL RESOURCE MANAGEMENT
 FOR THE FUEL TANK AND COMPLIANCE WITH PALM BEACH COUNTY
 ORDINANCE 2015-008.
 4) SUBMIT DETAILS AS TO HOW THE GENERATOR IS PROTECTED
 AGAINST UNAUTHORIZED ACCESS, TAMPERING AND TRESPASSING.
 NFPA 30 SEC. 15.3.6, WPB AMEND. TO FBC SEC. 107.2.1.
 5) SUBMIT SPECIFICATIONS ON THE FUEL TANK SHOWING
 COMPLIANCE WITH NFPA 30.
 6) INDICATE THE CLASSIFICATION OF COMBUSTIBLE LIQUID OF
 THE DDIESEL FUEL ( CLASS II, IIA, CLASS III, IIIA, )
 PER NFPA 30 SEC. 4.3.2.
 7) SUBMIT DETAILS FOR THE NORMAL VENTING AND EMERGENCY
 VENTING OF THE FUEL TANK. VENT PIPING SHALL COMPLY WITH
 NFPA 30 SEC. 27.8.
 8) THE FUEL TANK VENTS SHALL BE 5 FEET FROM ANY
 BUILDING OPENINGS AND 15 FEET FROM POWERED VENTILATION
 AIR INTAKES PER NFPA 30-12 SEC.19.5.3.2.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop Z ZONING
Rev No 3 Status P Date 2019-10-29 Cont ID  
Sent By jroach Date 2019-10-29 Time 08:35 Rev Time 0.00
Received By jroach Date 2019-10-29 Time 08:35 Sent To FIRE
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2019-08-06 Cont ID  
Sent By jroach Date 2019-08-06 Time 13:15 Rev Time 0.00
Received By jroach Date 2019-08-06 Time 13:15 Sent To FIRE
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2019-03-28 Cont ID  
Sent By jroach Date 2019-03-28 Time 09:41 Rev Time 0.00
Received By jroach Date 2019-03-28 Time 09:41 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy