 |
Plan Review Details - Permit 19030936
| Plan Review Stops For Permit 19030936 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2019-04-17 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2019-04-17 |
Time |
06:18 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2019-04-17 |
Time |
06:07 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2019-03-27 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2019-03-27 |
Time |
07:15 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2019-03-27 |
Time |
06:39 |
Sent To |
I |
|
| Notes |
| 2019-03-27 07:10:23 | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | | | 1. PRODUCT DOES APPEAR TO BE UL LISTED OR LISTED BY | | | ANOTHER NATIONALLY RECOGNIZED TESTING LABORATORY | | | (NRTL). SPEC SHEET IS FROM 2014. "MEETS OR EXCEEDS THE | | | FOLLOWING SPECIFICATIONS" DOES NOT MEAN IT HAS BEEN | | | LISTED. PROVIDE LISTING. FBC 107.2.1 NEC | | | 90.7,110.2,110.3B | | | | | | END OF COMMENTS. | | | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES | | | INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE | | | PREVIOUSLY REVIEWED SHEETS. | | | CODES IN EFFECT: | | | | | | FBC = FLORIDA BUILDING CODE 2017 6TH EDITION | | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA | | | BUILDING CODE 2017 6TH ED. | | | FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2017 | | | 6TH EDITION | | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 | | | 6TH EDITION | | | FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION | | | NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE | | | FS = FLORIDA STATUTES | | | | | | V/R, | | | | | | FRANK GIAQUINTO III | | | ELECTRICAL INSPECTOR | | | ELECTRICAL PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | [email protected] | | | CELL: 561-657-1653 | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2019-04-17 |
|
|
Cont ID |
|
| Sent By |
thunt |
Date |
2019-04-17 |
Time |
15:41 |
Rev Time |
0.00 |
| Received By |
thunt |
Date |
2019-04-02 |
Time |
15:14 |
Sent To |
|
|
| Notes |
| 2019-04-03 15:14:54 | RESUB ROUTED TO FGIAQUINTO |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2019-03-27 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2019-03-27 |
Time |
09:02 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2019-03-20 |
Time |
09:02 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2019-04-03 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2019-04-03 |
Time |
15:14 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2019-03-20 |
Time |
13:36 |
Sent To |
|
|
| Notes |
| 2019-03-21 13:36:23 | PLUMB <5K |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2019-04-17 |
|
|
Cont ID |
|
| Sent By |
thunt |
Date |
2019-04-17 |
Time |
15:40 |
Rev Time |
0.00 |
| Received By |
thunt |
Date |
2019-04-17 |
Time |
15:40 |
Sent To |
|
|
| Notes |
| 2019-04-17 15:41:44 | VALUE CHANGE TO MATCH OWNERS CONTRACT AMOUNT OF | | | $13,500. VERIFIED WITH CONTRACTOR ADAM AND ADVISED WILL | | | NEED NOC |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2019-03-22 |
|
|
Cont ID |
|
| Sent By |
thunt |
Date |
2019-03-22 |
Time |
07:16 |
Rev Time |
0.00 |
| Received By |
thunt |
Date |
2019-03-22 |
Time |
07:16 |
Sent To |
E |
|
| Notes |
| 2019-03-22 07:18:47 | PLUMBING 1ST REVIEW**DENIED** | | | | | | 1) VALUE OF JOB IS LOW AND MUST INCLUDE THE COST OF ALL | | | MATERIALS (TUB). PROVIDE A SIGNED BONA FIDE CONTRACT | | | SHOW DETAIL COST OF ENTIRE PROJECT. 109.3 BUILDING | | | PERMIT VALUATIONS. IF, IN THE OPINION OF THE BUILDING | | | OFFICIAL, THE CLAIMED VALUATION OF BUILDING, | | | ALTERATION, STRUCTURE, ELECTRICAL, GAS, MECHANICAL OR | | | PLUMBING SYSTEMS APPEARS TO BE UNDERESTIMATED ON THE | | | APPLICATION, THE PERMIT SHALL BE DENIED, UNLESS THE | | | APPLICANT CAN SHOW DETAILED, QUANTITY ESTIMATES, AND/OR | | | BONA FIDE SIGNED CONTRACTS (EXCLUDING LAND VALUE) TO | | | MEET THE APPROVAL OF THE BUILDING OFFICIAL. FOR | | | PERMITTING PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS | | | SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, | | | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, | | | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, | | | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY | | | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST | | | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS | | | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY | | | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT | | | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. | | | | | | 2) YOU PLAN SHOW EXISTING DRAIN AS LEFT HAND. WILL THE | | | NEW TUB ALSO BE LEFT HAND AND NOT OFFSETINNG OF THE | | | EXISTING DRAIN? FBC 107.2.1 | | | | | | | | | TIM HUNT | | | PLUMBING INSPECTOR/PLUMBING PLAN EXAMINER | | | BUILDING DIVISION | | | CITY OF WEST PALM BEACH | | | 561-248-2703 | | | [email protected] | | | | | | | | | | | | |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |