| 2019-11-13 06:53:28 | ****CORRECTIONS**** |
| | |
| | SAMANTHA HILL |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | 561-805-6724 |
| | |
| | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) |
| | FBC B = FBC BUILDING |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | FBC R = FBC RESIDENTIAL |
| | |
| | 1. SEE THE DOCUMENT NAMED ROOF & DECK INSULATION |
| | PRODUCT DATA. THE DESIGN PRESSURES USE ZONE 2 PRESSURES |
| | FOR ZONE 3, 3' PARAPET. THE ENGINEERING SUBMITTED HAS A |
| | 1' PARAPET, WITH HIGHER ZONE 3 PRESSURES. IF USING |
| | THESE PRESSURES, PROVIDE A ROOF PLAN SHOWING PARAPET |
| | HEIGHTS. TYPICALLY STAIR AND ELEVATOR SHAFTS DO NOT |
| | HAVE A 3' PARAPET EVEN IF THE REST OF THE ROOF HAS A 3' |
| | PARAPET; A PLAN WILL DOCUMENT THE CONDITIONS FOR THIS |
| | STRUCTURE. |
| | |
| | 2. SEE THE DOCUMENT NAMED REVISED TOP ROOFING PRODUCT |
| | DATA. THE DESIGN PRESSURES ARE CONSISTENT WITH THE |
| | PAPER ENGINEERING SUBMITTED. THIS DOCUMENT AND THE |
| | DOCUMENT REFERENCED IN COMMENT #1 WERE UPLOADED THE |
| | SAME DAY. IT IS NOT CLEAR WHY TWO DIFFERENT ROOF |
| | SUBMITTALS WERE SUBMITTED. |
| | |
| | 3. SEE ROOF & DECK INSULATION PRODUCT DATA UPLOADED |
| | 4/18/19. THIS DOCUMENT THE SAME ENGINEERING AS COMMENT |
| | #1. |
| | |
| | 4. THE DOCUMENT THERMOPLASTIC-POLYOLEFIN ROOFING |
| | PRODUCT DATA HAS TWO DIFFERENT PRODUCT APPROVALS; A |
| | FLORIDA STATE PRODUCT APPROVAL WHICH INDICATES THE |
| | ASSEMBLY PROPOSED AND ALSO INCLUDES A MIAMIDADE WHICH |
| | APPEARS TO BE THE SAME PRODUCT. AS THERE MAY BE |
| | CONFLICTS BETWEEN THE TWO, ONLY ONE PRODUCT APPROVAL |
| | CAN BE PROPOSED. |
| | |
| | 5. DUE TO THE DUPLICATION OF DOCUMENTS AND INCONSITENCY |
| | BETWEEN THE DOCUMENTS, PLEASE REMOVE ALL DOCUMENTS |
| | WHICH ARE NOT REQUIRED TO BE IN THE SUBMITTAL. IT'S |
| | SUGGESTED THAT THE ENGINEERING ALONG WITH THE PRODUCT |
| | APPROVAL BE ONE DOCUMENT, ROOF DRAWINGS SPECIFIC TO |
| | THIS PRODUCT BE A SECOND DOCUMENT, THEN GENERIC DETAILS |
| | AND SPEC SHEETS CAN EITHER BE OMITTED OR SUBMITTED AS |
| | ONE DOCUMENT. |
| | |
| | |
| | |
| | |
| 2019-11-04 14:49:35 | HARD COPIES ROUTED TO SHILL |