Plan Review Details - Permit 19021300
Plan Review Stops For Permit 19021300
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2019-03-13 Cont ID  
Sent By skennedy Date 2019-03-13 Time 14:45 Rev Time 0.00
Received By skennedy Date 2019-03-13 Time 14:45 Sent To  
Notes
2019-03-13 14:46:59RECEIVED SEALED DESIGN PRESSURE LETTER FOR FILE COPY.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2019-03-08 Cont ID  
Sent By rmcdouga Date 2019-03-08 Time 07:35 Rev Time 0.00
Received By rmcdouga Date 2019-03-08 Time 06:32 Sent To I
Notes
2019-03-08 07:35:08PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE NEW DESIGN PRESSURE CALCULATIONS FROM KEITH
 LEBLANC P.E. OF FEDERAL ENGINEERING AND TESTING ARE
 REQUIRED TO HAVE THE ENGINEER'S SEAL AND HANDWRITTEN
 SIGNATURE. DIGITAL SIGNATURES ARE ONLY ALLOWED ON
 ELECTRONICALLY SUBMITTED DOCUMENTS. FS471 & FAC
 61G15-23.003

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2019-03-01 Cont ID  
Sent By rmcdouga Date 2019-03-01 Time 17:30 Rev Time 0.00
Received By rmcdouga Date 2019-03-01 Time 17:30 Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-03-08 Cont ID  
Sent By rmcdouga Date 2019-03-08 Time 07:35 Rev Time 0.00
Received By rmcdouga Date 2019-03-05 Time 15:40 Sent To  
Notes
2019-03-07 15:40:21RESUB ROUTED TO RMCDOUGAL

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-03-01 Cont ID  
Sent By rmcdouga Date 2019-03-01 Time 17:31 Rev Time 0.00
Received By rmcdouga Date 2019-02-27 Time 10:07 Sent To  
Notes
2019-03-01 10:07:29ROUTED TO REROOF BIN