Plan Review Details - Permit 19021196
Plan Review Stops For Permit 19021196
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2019-08-27 Cont ID  
Sent By dbattles Date 2019-08-27 Time 16:08 Rev Time 0.00
Received By dbattles Date 2019-08-27 Time 16:08 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-06-27 Cont ID  
Sent By dbattles Date 2019-06-27 Time 07:57 Rev Time 0.00
Received By dbattles Date 2019-06-27 Time 07:57 Sent To  
Notes
2019-06-27 08:23:54PROVISOS:
 DEFERRED SUBMITTAL LIST FOUND ON SHEET A0.1
 GENERATOR TO BE SUBMITTED AS STAND ALONE PERMIT
 STEEL JOISTS/TRUSSES
 LOUVERS
 WINDOWS/DOORS
 CANOPIES (SEPARATE PERMIT)
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-04-25 Cont ID  
Sent By dbattles Date 2019-04-25 Time 13:23 Rev Time 0.00
Received By dbattles Date 2019-04-22 Time 13:02 Sent To  
Notes
2019-04-25 13:30:18****CORRECTIONS****
 W.P.B. PERMIT: 19021196
 REVIEWED: APRIL 25, 2019
  
 DYLAN BATTLES
 BUILDING PLANS EXAMINER PX4191
 [email protected]
 561-805-6718
  
 FBC[AMENDED] = FLORIDA BUILDING CODE,6TH EDITION (2017)
 FBC[B] = FBC BUILDING
 FBC[EXISTING] = FBC EXISTING BUILDING
 FBC[A] = FBC ACCESSIBILITY
 FBC[E] = FBC ENERGY CONSERVATION
 FBC[R] = FBC RESIDENTIAL
  
 1) ART IN PUBLIC PLACES. THE CITY OF WEST PALM BEACH
 ART IN PUBLIC PLACES ORDINANCE REQUIREMENT THAT APPLIES
 TO ANY REMODEL OR NEW CONSTRUCTION PROJECT FOR WHICH
 THE PERMIT APPLICATION WAS SUBMITTED AFTER 6/29/14, AND
 THE TOTAL PROJECT CONSTRUCTION COSTS ARE EQUAL TO OR
 GREATER THAN $750,000 WILL NEED TO COMPLY WITH THIS
 ORDINANCE. PER CITY OF WEST PALM BEACH ORDINANCE NO.
 4504-14, AND CITY OF WEST PALM BEACH CODE OF
 ORDINANCES, ARTICLE V, ART IN PUBLIC PLACES, SECTION
 78-123(A) AND SECTION 78-126(A), THE ART ASSESSMENT IS
 1% OF THE TOTAL PROJECT CONSTRUCTION COST. PER CITY OF
 WEST PALM BEACH CODE OF ORDINANCES, ARTICLE V, ART IN
 PUBLIC PLACES, SECTION 78-122, RENOVATION AND NEW
 CONSTRUCTION PROJECTS ARE ASSESSED CUMULATIVELY, SO THE
 ART ASSESSMENT WILL BE APPLICABLE TO ALL FUTURE
 PROJECTS. SEC. 78-129. - PUBLIC ART ASSESSMENT FOR
 PRIVATE DEVELOPMENT. (A) APPLICABILITY. THE PROVISIONS
 OF THIS ARTICLE AND THE PUBLIC ART ASSESSMENT SECTION
 SHALL APPLY TO ALL PRIVATE DEVELOPMENT PROJECTS,
 INCLUDING NEW CONSTRUCTION, OR THE RENOVATION OR
 IMPROVEMENT OF AN EXISTING BUILDING, WHERE TOTAL
 CONSTRUCTION COSTS ARE EQUAL TO OR GREATER THAN
 $750,000.00. ALL BUILDINGS WITHIN NEW PLANNED
 DEVELOPMENTS SHALL BE ASSESSED CUMULATIVELY TOWARDS
 THIS ART IN PUBLIC PLACES REQUIREMENT, EVEN IF THE
 BUILDINGS ARE PERMITTED SEPARATELY OR DEVELOPED IN
 PHASES. THE PROVISIONS OF THIS SECTION APPLY TO NEW
 DEVELOPMENT OR NEW CONSTRUCTION WITHIN EXISTING PLANNED
 DEVELOPMENTS.
 - THIS PROJECT MEETS THE CRITERIA TO PROVIDE AIPP.
 PLEASE CONTACT: MS. SYBILLE WELTER ART IN PUBLIC PLACES
 COORDINATOR 822-1515 E-MAIL: [email protected]
  
 2) 106.1 FBC[AMENDED] LIVE LOADS POSTED. WHERE THE LIVE
 LOADS FOR WHICH EACH FLOOR OR PORTION THEREOF OF A
 COMMERCIAL OR INDUSTRIAL BUILDING IS OR HAS BEEN
 DESIGNED TO EXCEED 50 PSF (2.40 KN/M2), SUCH DESIGN
 LIVE LOADS SHALL BE CONSPICUOUSLY POSTED BY THE OWNER
 IN THAT PART OF EACH STORY IN WHICH THEY APPLY, USING
 DURABLE SIGNS. IT SHALL BE UNLAWFUL TO REMOVE OR DEFACE
 SUCH NOTICES?
 - 106.2 FBC[AMENDED] ISSUANCE OF CERTIFICATE OF
 OCCUPANCY. A CERTIFICATE OF OCCUPANCY REQUIRED BY
 SECTION 111 SHALL NOT BE ISSUED UNTIL THE FLOOR LOAD
 SIGNS, REQUIRED BY SECTION 106.1, HAVE BEEN INSTALLED.
 (MECHANICAL LOFTS?)
  
 3) 107.2.5 FBC[AMENDED] PROVIDE SURVEY OF PROPERTY
 SHOWING EASEMENTS AND DISTANCE FROM PROPERTY LINES TO
 NEW STRUCTURE.
  
 4) 107.2.5 FBC[AMENDED](FL. STATUTE 472.025)SURVEY TO
 BE SIGNED AND SEALED BY THE SURVEYOR OF RECORD.
  
 5) 107.3.5 FBC[AMENDED] STRUCTURAL DRAWING CALL FOR
 LIGHT GAGE STEEL, METAL DECKING AND 5/8 PLYWOOD. ABOVE
 METAL DECKING. SHEET A6.1 SHOWS INSULATION AND THEN
 PLYWOOD.
 - COORDINATE THESE DETAILS AND PROVIDE ATTACHMENT
 DETAIL AND SPACING FOR THE ROOF DECK.
  
 6) 107.5.3 FBC[AMENDED] CODE EDITION.
 - SHEET A0.1 REFER TO IBC IN SECTION 12 AND 13. PLEASE
 CHANGE TO FBC.
  
 7) 301.1 FBC[E] CLIMATE ZONE TABLE.
 - SHEET A0.1 IN ENERGY CODE SECTION REFERS TO ZONE 2A.
 THE PROPOSED STRUCTURE IS IN ZONE 1A. PLEASE REVIEW AND
 UPDATE.
  
 8) 319 FBC[R] ADDRESS IS NEEDED FOR THIS BUILDING. THE
 PERMIT CANNOT BE ISSUED UNTIL AND ADDRESS HAS BEEN
 ASSIGNED TO THE PROPERTY.
 - PLEASE CALL MICHAEL ORIO BY PHONE AT 561-494-1080, OR
 BY E-MAIL [email protected]
  
 9) 401.2 FBC[CE] APPLICATION. COMMERCIAL BUILDINGS
 SHALL COMPLY WITH ONE OF THE FOLLOWING:
 1. THE REQUIREMENTS OF ANSI/ASHRAE/IESNA 90.1,
 EXCLUDING SECTION 9.4.1.1(G) OF THE STANDARD.
 2. THE REQUIREMENTS OF SECTIONS C402 THROUGH C405. IN
 ADDITION, COMMERCIAL BUILDINGS SHALL COMPLY WITH
 SECTION C406 AND TENANT SPACES SHALL COMPLY WITH
 SECTION C406.1.1.
 3. THE REQUIREMENTS OF SECTIONS C402.5, C403.2, C404,
 C405.2, C405.3, C405.5, C405.6 AND C407. THE BUILDING
 ENERGY COST SHALL BE EQUAL TO OR LESS THAN 85 PERCENT
 OF THE STANDARD REFERENCE DESIGN BUILDING.
 - IS OPTION 2 BEING UTILIZED FOR THIS PROJECT? PLEASE
 REVIEW CODE SECTIONS BEING REFERENCEED ON SHEET A0.1.
 YOU SHOULD BE REFERING TO CHAPTER 4 OF FBC ENERGY 2017
 6TH EDITION. USING TABLEC402.4 IS OK, BUT SHGC SHOULD
 BE FOR ZONE 1. IT LOOKS LIKE ZONE 2 DATA WAS USED.
  
 10) 606.2 FBC[A] CLEAR FLOOR SPACE. A CLEAR FLOOR SPACE
 COMPLYING WITH 305, POSITIONED FOR A FORWARD APPROACH,
 AND KNEE AND TOE CLEARANCE COMPLYING WITH 306 SHALL BE
 PROVIDED.
 - PROVIDE DIMENSION, OR SHOW CLEAR FLOOR SPACE,
 ACCESSIBLE STALLS ON ENLARGED BATHROOMS DRAWINGS SHEET
 A7.4. (FOR OTHER COMMENTS SEE PLUMBING REVIEW)
  
 11) 1028.4 FBC[B] EGRESS COURTS.
 A. ARE THE GATES AT THE COURTYARDS ABLE TO BE OPENED
 FROM THE EGRESS SIDE?
 B. ARE THERE ANY CLOSERS ON DOORS? IF SO PLEASE ADD TO
 DOOR SCHEDULE.
  
 12) 1604.3.1 FBC[B] DEFLECTIONS. THE DEFLECTIONS OF
 STRUCTURAL MEMBERS SHALL NOT EXCEED THE MORE
 RESTRICTIVE OF THE LIMITATIONS OF SECTIONS 1604.3.2
 THROUGH 1604.3.5 OR THAT PERMITTED BY TABLE 1604.3.
 - IF STRUCTURAL CALCULATIONS ARE AVAILABLE, PLEASE
 UPLOAD INTO SUPPORTING DOCUMENTS.
  
 13) 1606.2 FBC[B] DESIGN DEAD LOAD. FOR PURPOSES OF
 DESIGN, THE ACTUAL WEIGHTS OF MATERIALS OF CONSTRUCTION
 AND FIXED SERVICE EQUIPMENT SHALL BE USED. IN THE
 ABSENCE OF DEFINITE INFORMATION, VALUES USED SHALL BE
 SUBJECT TO THE APPROVAL OF THE BUILDING OFFICIAL.
 - (PLEASE PROVIDE DEAD LOAD DATA)
  
 14) 1607.3 FBC[B] UNIFORM LIVE LOADS. THE LIVE LOADS
 USED IN THE DESIGN OF BUILDINGS AND OTHER STRUCTURES
 SHALL BE THE MAXIMUM LOADS EXPECTED BY THE INTENDED USE
 OR OCCUPANCY BUT SHALL IN NO CASE BE LESS THAN THE
 MINIMUM UNIFORMLY DISTRIBUTED LIVE LOADS GIVEN IN TABLE
 1607.1.
 - (SEE TABLE 1607.1 FOR MINIMUM LIVE LOADS)
  
 15) 1816.1 FBC[B] TERMITE PROTECTION. TERMITE
 PROTECTION SHALL BE PROVIDED BY REGISTERED
 TERMITICIDES, INCLUDING SOIL APPLIED PESTICIDES,
 BAITING SYSTEMS, AND PESTICIDES APPLIED TO WOOD, OR
 OTHER APPROVED METHODS OF TERMITE PROTECTION LABELED
 FOR USE AS A PREVENTATIVE TREATMENT TO NEW
 CONSTRUCTION. SEE SECTION 202, ?REGISTERED
 TERMITICIDE.? UPON COMPLETION OF THE APPLICATION OF THE
 TERMITE PROTECTIVE TREATMENT, A CERTIFICATE OF
 COMPLIANCE SHALL BE ISSUED TO THE BUILDING DEPARTMENT
 BY THE LICENSED PEST CONTROL COMPANY THAT CONTAINS THE
 FOLLOWING STATEMENT: ?THE BUILDING HAS RECEIVED A
 COMPLETE TREATMENT FOR THE PREVENTION OF SUBTERRANEAN
 TERMITES. TREATMENT IS IN ACCORDANCE WITH RULES AND
 LAWS ESTABLISHED BY THE FLORIDA DEPARTMENT OF
 AGRICULTURE AND CONSUMER SERVICES.?
 - DO PLANS INDICATE TERMITE TREATMENT? PLEASE INDICATE
 PAGE, OR ADD NOTES AS APPLICABLE TO 1816.1.
  
 16) 2207.4 FBC[B] STEEL JOIST DRAWINGS. STEEL JOIST
 PLACEMENT PLANS SHALL BE PROVIDED TO SHOW THE STEEL
 JOIST PRODUCTS AS SPECIFIED ON THE APPROVED
 CONSTRUCTION DOCUMENTS AND ARE TO BE UTILIZED FOR FIELD
 INSTALLATION IN ACCORDANCE WITH SPECIFIC PROJECT
 REQUIREMENTS AS STATED IN SECTION 2207.2. STEEL JOIST
 PLACEMENT PLANS SHALL INCLUDE, AT A MINIMUM, THE
 FOLLOWING:
 1. LISTING OF APPLICABLE LOADS AS STATED IN SECTION
 2207.2 AND USED IN THE DESIGN OF THE STEEL JOISTS AND
 JOIST GIRDERS AS SPECIFIED IN THE APPROVED CONSTRUCTION
 DOCUMENTS.
 2. PROFILES FOR JOIST AND JOIST GIRDER CONFIGURATIONS
 THAT DIFFER FROM THOSE DEFINED BY THE SJI
 SPECIFICATIONS LISTED IN SECTION 2207.1.
 3. CONNECTION REQUIREMENTS FOR: 3.1. JOIST SUPPORTS.
 3.2. JOIST GIRDER SUPPORTS. 3.3. FIELD SPLICES. 3.4.
 BRIDGING ATTACHMENTS.
 4. LIVE AND TOTAL LOAD DEFLECTION CRITERIA FOR JOISTS
 AND JOIST GIRDER CONFIGURATIONS THAT DIFFER FROM THOSE
 DEFINED BY THE SJI SPECIFICATIONS LISTED IN SECTION
 2207.1.
 5. SIZE, LOCATION AND CONNECTIONS FOR BRIDGING.
 6. JOIST HEADERS. STEEL JOIST PLACEMENT PLANS DO NOT
 REQUIRE THE SEAL AND SIGNATURE OF THE JOIST
 MANUFACTURER?S REGISTERED DESIGN PROFESSIONAL.
 - PROVIDE PRE-ENGINEERED ROOF TRUSS SUBMITTAL, OR
 INDICATE THAT IT WILL BE A DEFERRED SUBMITTAL. (SEE
 BELOW FOR DEFERRED SUBMITTALS)
  
 107.3.4.1 FBC[AMENDED] DEFERRED SUBMITTALS. FOR THE
 PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS ARE
 DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT
 SUBMITTED AT THE TIME OF THE APPLICATION AND THAT ARE
 TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A
 SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL
 HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE
 REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE
 SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION
 DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL.
  
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
  
 17) PLEASE PROVIDE A LIST OF DEFERRED SUBMITTALS SO
 THAT I WILL NOT ASK FOR ITEMS THAT WILL BE SUPPLIED AT
 A LATER DATE, OR INDICATE WHICH PAGE A LIST CAN BE
 FOUND. SOME ITEMS THAT CAN BE DEFERRED INCLUDE WINDOWS,
 DOORS, ROOFING, ROOF TRUSSES AND OTHERS THAT APPLY TO
 THIS PROJECT.
  
 18) SEPARATE PERMIT NEEDED FOR GENERATOR.
  
 NOTES:
  
 -PLEASE PROVIDE COMMENT RESPONSE SHEET TO EXPLAIN HOW
 EACH COMMENT IS BEING ADDRESSED.
  
 -COMMENTS ARE A BRIEF OVERVIEW OF CODE SECTIONS.
 FURTHER REVIEW OF THE REFERENCED CODE SECTIONS WILL BE
 REQUIRED.
  
 -ADDITIONAL COMMENTS MAY BE FORTHCOMING PENDING REVIEW
 OF MATERIALS REQUESTED.
  
 PLEASE FEEL FREE TO CONTACT ME AT 561-805-6718 (M-F
 8-5) TO DISCUSS COMMENTS, OR E-MAIL ANYTIME
 [email protected]
  
  
  

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2019-09-06 Cont ID  
Sent By jpearson Date 2019-09-06 Time 09:51 Rev Time 0.00
Received By jpearson Date 2019-09-06 Time 09:51 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2019-07-22 Cont ID  
Sent By jpearson Date 2019-07-22 Time 16:12 Rev Time 0.00
Received By jpearson Date 2019-07-22 Time 16:12 Sent To  
Notes
2019-07-22 15:35:35CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 PREVIOUS COMMENTS THAT HAVE BEEN ADDRESSED
 SATISFACTORILY ARE MARKED AS CORRECTED. PREVIOUS
 COMMENTS THAT HAVE NOT BEEN ADDRESSED SATISFACTORILY
 HAVE ADDITIONAL COMMENTS IN PARENTHESES. ANY NEW
 COMMENTS WILL BE LISTED AFTER PREVIOUS COMMENTS.
  
 1. CORRECTED.
 2. CORRECTED.
 3. CORRECTED.
 4. CORRECTED.
 5. CORRECTED.
 6. CORRECTED.
  
 NEW COMMENT:
  
 7. NO ELECTRICAL ISSUES REMAIN. HOWEVER, THE SIGNATURE
 ISSUE MUST BE CORRECTED BEFORE PLAN CAN BE APPROVED.
 SEE SIGNATURE COMMENTS. WPB FBC 107.1
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY
 REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED
 SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD
 SHEETS.
  
 SINCERELY,
  
 JOHN PEARSON
 ELECTRICAL PLANS EXAMINER
 561-805-6746
 [email protected]
  

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2019-04-11 Cont ID  
Sent By jpearson Date 2019-04-11 Time 15:43 Rev Time 0.00
Received By jpearson Date 2019-04-09 Time 15:54 Sent To  
Notes
2019-04-11 15:43:52CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 1. SHEET E2.3 AND E2.4, NOTE 2 STATES THAT WATER
 FOUNTAIN GFCI RECEPTACLES SHOULD BE INSTALLED WITHIN
 THE ENCLOSURE OF THE WATER FOUNTAIN. GFCI RECEPTACLES
 FOR WATER FOUNTAINS ARE REQUIRED TO BE READILY
 ACCESSIBLE. PROVIDE CORRECTION. NEC 422.5, 422.52
 2. BE ADVISED THAT FIRE ALARM, LOW VOLTAGE SYSTEMS,
 DAS, LIGHTNING PROTECTION, GENERATORS, COMMERCIAL HOOD
 SYSTEMS, WALK IN COOLERS, SIGNS, SITE LIGHTING, AND
 SWIMMING POOLS (WHERE APPLICABLE) ARE NOT INCLUDED IN
 THE SCOPE OF THIS PLAN REVIEW. PROVIDE A BLOCK NOTE
 INDICATING THE REQUIRED SEPARATE PERMITS AND PLAN
 SUBMITTALS FOR ANY OF THESE SYSTEMS PRESENT. WPB FBC
 105.1, 107.2.1
 3. ATS-MAIN DOES NOT APPEAR TO HAVE THE CLEARANCE IN
 THE FRONT AS REQUIRED PER NEC 110.26. PROVIDE
 CLARIFICATION AND/OR CORRECTION. NEC 110.26
 4. PROVIDE CLARIFICATION FOR DESIGN THAT INCLUDES TWO
 TRANSFER SWITCHES. ATS-MAIN IS FED FROM THE GENERATOR
 AND FPL, AND THEN FEEDS MSB. ATS-LS IS FED FROM MSB AND
 THE GENERATOR. SO, IN LOSS OF POWER, THE GENERATOR
 WOULD ENERGIZE MSB, THEREBY FEEDING ATS_LS AGAIN AS IT
 WOULD UNDER NORMAL POWER. THIS WOULD MAKE THE TRANSFER
 SWITCH THINK NORMAL POWER HAS RETURNED AND POSSIBLY NOT
 TRANSFER? OR TRANSFER ONCE THE GENERATOR ALLOWS ONLY TO
 IMMEDIATELY TRANSFER BACK? WHAT IS THE POINT OF THIS
 TRANSFER SWITCH IF ALL LOADS ARE ALREADY CAPABLE OF
 BEING FED BY THE GENERATOR? PROVIDE CLARIFICATION
 AND/OR CORRECTIONS AS NEEDED. WPB FBC 107.2.1; NEC
 110.3
 5. PROVIDE NOTES TO INDICATE THE REQUIRED MARKING OF
 SERVICE EQUIPMENT FOR ARC FLASH HAZARD WARNING AND
 AVAILABLE FAULT CURRENT PER CODE. NEC 110.16, 110.24
 6. PROVIDE CHART OF INTERIOR LIGHTING POWER ALLOWANCES
 EXPRESSED IN WATTAGE PER THE FBC ENERGY CODE IN
 RELATION TO THE WATTAGE OF THE CONNECTED INTERIOR
 LIGHTING PROPOSED TO COMPLY WITH CODE. FBC EC C405.4.2
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY
 REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED
 SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD
 SHEETS.
  
 SINCERELY,
  
 JOHN PEARSON
 ELECTRICAL PLANS EXAMINER
 561-805-6746
 [email protected]
  

Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2019-09-09 Cont ID  
Sent By rrossano Date 2019-09-09 Time   Rev Time 0.00
Received By rrossano Date 2019-09-09 Time   Sent To  
Notes
2019-09-09 07:37:05REVIEWED UNDER FORMAL ENGINEERING SUBMITTAL E18110025.

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2019-07-26 Cont ID  
Sent By shill Date 2019-07-26 Time 16:02 Rev Time 0.00
Received By shill Date 2019-07-26 Time 16:02 Sent To  
Notes
2019-07-26 16:03:13CONTACT ENGINEERING DEPARTMENT DIRECTLY AND SUBMIT
 APPLICATION IF REQUIRED
 HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS
 /FORMS,-PERMITS-APPLICATIONS
  
 ENGINEERING APPROVAL REQUIRED PRIOR TO PERMIT ISSUANCE
  
 MAIN PHONE: (561) 822-1200
  
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2019-03-22 Cont ID  
Sent By shill Date 2019-03-22 Time 16:35 Rev Time 0.00
Received By shill Date 2019-03-22 Time 16:35 Sent To  
Notes
2019-03-22 16:36:29CONTACT ENGINEERING DEPARTMENT DIRECTLY AND SUBMIT
 APPLICATION IF REQUIRED
 HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS
 /FORMS,-PERMITS-APPLICATIONS
  
 ENGINEERING APPROVAL REQUIRED PRIOR TO PERMIT ISSUANCE
  
 MAIN PHONE: (561) 822-1200
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2019-08-07 Cont ID  
Sent By pleduc Date 2019-08-07 Time   Rev Time 0.00
Received By pleduc Date 2019-08-07 Time 11:44 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status F Date 2019-07-05 Cont ID  
Sent By pleduc Date 2019-07-05 Time   Rev Time 0.00
Received By pleduc Date 2019-07-05 Time 15:56 Sent To  
Notes
2019-07-05 16:03:12THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
 1) THIS IS A NEW BUILDING WITH NO EXISTING FIRE
 SPRINKLERS. SHOP DRAWINGS CAN ONLY BE SUBMITTED AFTER
 THE REQUIRED F.A.C. 61G ARE SUBMITTED WITH THIS MASTER
 PERMIT.
  
 THE REQUIRED DOCUMENTS CAN BE EITHER IN WRITTEN
 NARRATIVE FORM SIGNED AND SEALED BY AN EOR OR FIRE
 SPRINKLER DRAWINGS.
  
 HOWEVER, THEY MUST MEET THE MINIMUM REQUIREMENTS.
  
 FAC 61G15-32.002 DEFINES THE FIRE PROTECTION SYSTEM
 ENGINEERING DOCUMENT (5) AS WELL AS THE FIRE PROTECTION
 SYSTEM LAYOUT DOCUMENT (6). 61G15-32.003 OUTLINES THE
 COMMON REQUIREMENTS TO ALL FIRE PROTECTIONS ENGINEERING
 DOCUMENTS WITH 32.004 (2) (A-J) OUTLINING THE MINIMUM
 INFORMATION TO BE PROVIDED ON FIRE PROTECTION
 ENGINEERING DOCUMENTS FOR WATER BASED SYSTEMS. AS
 STATED IN THE DEFINITIONS, THE CONTRACTOR IS TO DEVELOP
 THE LAYOUT DOCUMENTS BASED ON THE DESIGN CRITERIA
 PROVIDED IN THE FIRE PROTECTION ENGINEERING DOCUMENTS
 BY THE ENGINEER OF RECORD FOR THE FIRE SPRINKLER
 SYSTEM. THE FIRE PROTECTION SYSTEM ENGINEERING
 DOCUMENTS ARE SUBMITTED FOR THE MASTER PERMIT (BUILDING
 PERMIT PER FBC) AND THE LAYOUT DOCUMENTS ARE SUBMITTED
 FOR THE FIRE SPRINKLER INSTALLATION PERMIT.
  
 PER FLORIDA ADMINISTRATIVE CODE SECTION 61G15-32.004,
 FIRE PROTECTION ENGINEERING DOCUMENTS SHALL INCLUDE THE
 POINT OF SERVICE FOR THE WATER SUPPLY, A LIST OF
 APPLICABLE NFPA STANDARDS APPLICABLE TO THE PROJECT,
 CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR
 AREA, SUPPRESSION SYSTEM TYPE, DESIGN DENSITIES, WATER
 SUPPLY DATA (FIRE PUMP DATA, HYDRANT FLOW TEST DATA)
 AND ANY PERFORMANCE BASED INFORMATION SUCH AS
 PRE-ENGINEERED SYSTEMS.
  
 61G15-30.003 MINIMUM REQUIREMENTS FOR ENGINEERING
 DOCUMENTS.
 (1) ENGINEERING DOCUMENTS ARE PREPARED IN THE COURSE OF
 PERFORMING ENGINEERING SERVICES. WHEN PREPARED FOR
 INCLUSION WITH AN APPLICATION FOR A GENERAL BUILDING
 PERMIT, THE DOCUMENTS SHALL MEET ALL ENGINEER?S
 RESPONSIBILITY RULES, SET FORTH IN CHAPTERS 61G15-31,
 61G15-32, 61G15-33, AND 61G15-34, F.A.C., AND BE OF
 SUFFICIENT CLARITY TO INDICATE THE LOCATION, NATURE AND
 EXTENT OF THE WORK PROPOSED AND SHOW IN DETAIL THAT IT
 WILL CONFORM TO THE PROVISIONS OF THE FLORIDA BUILDING
 CODE, ADOPTED IN SECTION 553.73, F.S., AND APPLICABLE
 LAWS, ORDINANCES, RULES AND REGULATIONS, AS DETERMINED
 BY THE AHJ. THE DOCUMENTS SHALL INCLUDE:
 (A) INFORMATION THAT PROVIDES MATERIAL SPECIFICATIONS
 REQUIRED FOR THE SAFE OPERATION OF THE SYSTEM THAT IS A
 RESULT OF ENGINEERING CALCULATIONS, KNOWLEDGE AND
 EXPERIENCE.
 (B) LIST FEDERAL, STATE, MUNICIPAL, AND COUNTY
 STANDARDS, CODES, ORDINANCES, LAWS, AND RULES, WITH
 THEIR EFFECTIVE DATES, THAT THE ENGINEERING DOCUMENTS
 ARE INTENDED TO CONFORM TO.
 (C) INFORMATION, AS DETERMINED BY THE ENGINEER OF
 RECORD, NEEDED FOR THE SAFE AND EFFICIENT OPERATION OF
 THE SYSTEM.
 (D) LIST ENGINEERING DESIGN CRITERIA; REFERENCE PROJECT
 SPECIFIC STUDIES, REPORTS, AND DELEGATED ENGINEERING
 DOCUMENTS.
 (E) IDENTIFY CLEARLY ELEMENTS OF THE DESIGN THAT VARY
 FROM THE GOVERNING STANDARDS AND DEPICT/IDENTIFY THE
 ALTERNATE METHOD USED TO ENSURE COMPLIANCE WITH THE
 STATED PURPOSE OF THESE RESPONSIBILITY RULES.
 (2) ENGINEERS SHALL LEGIBLY INDICATE THEIR NAME AND
 BUSINESS ADDRESS, ON ENGINEERING DOCUMENTS. ENGINEERING
 DOCUMENTS WHICH ARE ISSUED FOR PRELIMINARY OR
 CONCEPTUAL USE, SHALL CLEARLY NOTE THE INTENDED PURPOSE
 OF SUCH DOCUMENTS.
 (3) WHEN ELEMENTS OF THE PROJECT ARE SHOWN ON AN
 ENGINEERING DOCUMENT ONLY FOR INFORMATION OR
 CLARIFICATION AND THE ENGINEER DOES NOT INTEND TO
 ACCEPT RESPONSIBILITY FOR THE ELEMENTS, THE ENGINEER
 SHALL CLEARLY NOTE ON THE DOCUMENTS THE EXTENT OF HIS
 RESPONSIBILITY.
 (4) ENGINEERING DRAWINGS SHALL BE LEGIBLE AND CLEARLY
 DEFINE AND DELINEATE THE WORK IN THE PROJECT. THEY MUST
 ALSO COMPLY WITH CHAPTER 61G15-23, F.A.C., SEALS.
 (5) ENGINEERS SHALL CLEARLY NOTE ON ANY PRELIMINARY
 ENGINEERING DOCUMENTS THAT SUCH DOCUMENTS ARE NOT IN
 FINAL FORM, BUT ARE BEING TRANSMITTED TO THE PUBLIC
 AGENCY TO RECEIVE AGENCY REVIEWS, COMMENTS AND
 INTERPRETATIONS. THE DOCUMENTS MAY SUBSEQUENTLY BE
 REVISED BY THE ENGINEER TO REFLECT RESOLUTION OF ISSUES
 WITH THE PUBLIC AGENCY PRIOR TO FINAL ACTION BY THE
 AGENCY. CHANGES, REVISIONS AND MODIFICATIONS TO A
 PROJECT MAY PROMPT ADDITIONAL DOCUMENT SUBMITTAL FOR
 AGENCY APPROVAL ACTION ON THE SAME PROJECT.
 SPECIFIC AUTHORITY 471.033(2), 471.008 FS. LAW
 IMPLEMENTED 471.033(1)(G), 471.025(3) FS. HISTORY?NEW
 1-26-93, FORMERLY 21H-30.003, AMENDED 11-13-08.
  
  
 61G15-32.003 COMMON REQUIREMENTS TO ALL FIRE PROTECTION
 ENGINEERING
 DOCUMENTS.
 (1) THE FIRE PROTECTION SYSTEM ENGINEERING DOCUMENTS
 SHALL PROVIDE THE ENGINEERING REQUIREMENTS TO BE USED
 IN THE PREPARATION OF THE FIRE PROTECTION SYSTEM LAYOUT
 DOCUMENTS AND TO INDICATE THE NATURE AND SCOPE OF THE
 WORK, AND TO DESCRIBE, DETAIL, DIMENSION, LABEL AND
 DEFINE THE FIRE PROTECTION COMPONENTS, SYSTEM(S),
 MATERIALS, ASSEMBLIES, EQUIPMENT AND ITS STRUCTURAL AND
 UTILITY SUPPORT SYSTEM(S), INSOFAR AS THEY INVOLVE THE
 SAFEGUARDING OF LIFE, HEALTH OR PROPERTY.
 (2) THE FIRE PROTECTION SYSTEM ENGINEERING DOCUMENTS
 SHALL SPECIFY THE APPLICABLE REQUIREMENTS FOR THE
 ACCEPTANCE TESTING OF THE FIRE PROTECTION SYSTEM AND
 COMPONENTS, WHICH SHALL BE BASED UPON APPLICABLE CODES
 AND STANDARDS, WHERE AVAILABLE.
 (3) THE OCCUPANCY OF THE AREA OR DESCRIPTION OF A
 SPECIFIC HAZARD BEING PROTECTED BY THE FIRE PROTECTION
 SYSTEM(S) SHALL BE SHOWN ON THE FIRE PROTECTION SYSTEM
 ENGINEERING DOCUMENTS.
 (4) THE APPLICABLE CODE AND STANDARD TO BE USED IN THE
 PREPARATION OF THE FIRE PROTECTION SYSTEM LAYOUT
 DOCUMENTS SHALL BE SHOWN ON THE FIRE PROTECTION SYSTEM
 ENGINEERING DOCUMENTS. WHEN CODES AND STANDARDS ARE NOT
 AVAILABLE OR APPLICABLE, AND SAID LAYOUT DOCUMENTS ARE
 TO BE BASED ON ENGINEERING JUDGMENT, ANY REASONS AND
 ASSUMPTIONS MADE TO DEVELOP THE FIRE PROTECTION CONCEPT
 SHALL BE IDENTIFIED ON THE FIRE PROTECTION SYSTEM
 ENGINEERING DOCUMENTS.
 (5) STRUCTURAL SUPPORT AND STRUCTURAL OPENINGS REQUIRED
 BY THE FIRE PROTECTION SYSTEM SHALL BE SHOWN ON THE
 FIRE PROTECTION SYSTEM ENGINEERING DOCUMENTS AND SHALL
 BE REFERENCED ON STRUCTURAL ENGINEERING DOCUMENTS.
 (6) WHEN LAYOUT DOCUMENTS CONTAIN MATERIAL DEVIATION
 FROM THE ENGINEER OF RECORD'S FIRE PROTECTION SYSTEM
 ENGINEERING DOCUMENT, SUCH LAYOUT DOCUMENTS ARE NOT
 COMPLIANT UNLESS THEY ARE ACCOMPANIED BY REVISED
 ENGINEERING DOCUMENTS MADE AND SEALED BY THE ENGINEER
 OF RECORD FOR THE FIRE PROTECTION SYSTEM.
 (7) REQUIREMENTS FOR ACTIVATION CONTROL SYSTEMS,
 SEQUENCE, OPERATING PARAMETERS, INTERLOCKS, SAFETY
 RELATED DEVICES, INDICATORS AND ALARMS, SHALL BE SHOWN
 ON THE FIRE PROTECTION SYSTEM ENGINEERING DOCUMENTS,
 UNLESS SHOWN ON OTHER RELATED DOCUMENTS.
 (8) ANY INFORMATION DEEMED APPROPRIATE BY THE ENGINEER
 OF RECORD TO ASSIST THE AUTHORITY HAVING JURISDICTION
 IN UNDERSTANDING THE OWNER?S INTENDED USE AND PROPOSED
 PROTECTION OF THE BUILDING OR FACILITY AND TO PROVIDE
 SUFFICIENT DIRECTION TO THE INSTALLATION CONTRACTOR OR
 OTHER INTERESTED PARTIES REGARDING THE LAYOUT OF THE
 SYSTEM(S), SHALL BE INCLUDED IN THE FIRE PROTECTION
 SYSTEM ENGINEERING DOCUMENTS.
 SPECIFIC AUTHORITY 471.008, 471.033(2), FS
 LAW IMPLEMENTED 471.005(7), 471.033(2), FS
 HISTORY?NEW 5-19-93, FORMERLY 21H-32.003, AMENDED
 4-2-2000, 6-26-01
  
 61G15-32.004 DESIGN OF WATER BASED FIRE PROTECTION
 SYSTEMS.
 (1) WATER BASED FIRE PROTECTION SYSTEMS INCLUDE, BUT
 ARE NOT LIMITED TO, AUTOMATIC SPRINKLER SYSTEMS OF WET,
 DRY, FINE WATER SPRAY (MIST), MANUAL, AND DELUGE VALVE
 CONTROLLED TYPES, PUMPING SYSTEMS, STANDPIPES, FIRE
 WATER MAINS AND DEDICATED FIRE PROTECTION WATER
 SOURCES.
 (2) TO ENSURE MINIMUM DESIGN QUALITY IN FIRE PROTECTION
 SYSTEM ENGINEERING DOCUMENTS, SAID DOCUMENTS SHALL
 INCLUDE AS A MINIMUM THE FOLLOWING INFORMATION WHEN
 APPLICABLE:
 (A) THE POINT OF SERVICE FOR THE FIRE PROTECTION WATER
 SUPPLY AS DEFINED BY 633.021(18) F.S.
 (B) APPLICABLE NFPA STANDARD TO BE APPLIED, OR IN THE
 CASE WHERE NO SUCH STANDARD EXISTS, THE ENGINEERING
 STUDY, JUDGMENTS, AND/OR PERFORMANCE BASED ANALYSIS AND
 CONCLUSIONS.
 (C) CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR
 AREA.
 (D) DESIGN APPROACH, WHICH INCLUDES SYSTEM TYPE,
 DENSITIES, DEVICE TEMPERATURE RATING, AND SPACING FOR
 EACH SEPARATE 42 HAZARD OCCUPANCY.
 (E) CHARACTERISTICS OF WATER SUPPLY TO BE USED, SUCH AS
 MAIN SIZE AND LOCATION, WHETHER IT IS DEAD-END OR
 CIRCULATING; AND IF DEAD-END, THE DISTANCE TO THE
 NEAREST CIRCULATING MAIN, AS WELL AS ITS MINIMUM
 DURATION AND RELIABILITY FOR THE MOST HYDRAULICALLY
 DEMANDING DESIGN AREA.
 (F) WHEN PRIVATE OR PUBLIC WATER SUPPLIES ARE USED, THE
 FLOW TEST DATA, INCLUDING DATE AND TIME OF TEST, WHO
 CONDUCTED TEST OR SUPPLIED INFORMATION, TEST ELEVATION,
 STATIC GAUGE PRESSURE AT NO FLOW, FLOW RATE WITH
 RESIDUAL GAUGE PRESSURE, HYDRANT BUTT COEFFICIENT, AND
 LOCATION OF TEST IN RELATION TO THE HYDRAULIC POINT OF
 SERVICE.
 (G) VALVING AND ALARM REQUIREMENTS TO MINIMIZE
 POTENTIAL FOR IMPAIRMENTS AND UNRECOGNIZED FLOW OF
 WATER.
 (H) MICROBIAL INDUCED CORROSION (MIC). THE ENGINEER OF
 RECORD SHALL MAKE REASONABLE EFFORTS TO IDENTIFY WATER
 SUPPLIES THAT COULD LEAD TO MICROBIAL INDUCED CORROSION
 (MIC). SUCH EFFORTS MAY CONSIST OF DISCUSSIONS WITH THE
 LOCAL WATER PURVEYOR AND/OR FIRE OFFICIAL, FAMILIARITY
 WITH CONDITIONS IN THE LOCAL AREA, OR LABORATORY
 TESTING OF WATER SUPPLIES. WHEN CONDITIONS ARE FOUND
 THAT MAY RESULT IN MIC CONTAMINATION OF THE FIRE
 PROTECTION PIPING, THE ENGINEER SHALL DESIGN CORRECTIVE
 MEASURES.
 (I) BACKFLOW PREVENTION AND METERING SPECIFICATIONS AND
 DETAILS TO MEET LOCAL WATER PURVEYOR REQUIREMENTS
 INCLUDING MAXIMUM ALLOWABLE PRESSURE DROP.
 (J) QUALITY AND PERFORMANCE SPECIFICATIONS OF ALL YARD
 AND INTERIOR FIRE PROTECTION COMPONENTS.
 (3) CONTRACTOR SUBMITTALS WHICH DEVIATE FROM THE ABOVE
 MINIMUM DESIGN PARAMETERS SHALL BE CONSIDERED MATERIAL
 DEVIATIONS AND REQUIRE SUPPLEMENTAL ENGINEERING
 APPROVAL AND DOCUMENTATION.
 (4) IN THE EVENT THE ENGINEER OF RECORD PROVIDES MORE
 INFORMATION AND DIRECTION THAN IS ESTABLISHED ABOVE, HE
 OR SHE SHALL BE HELD RESPONSIBLE FOR THE TECHNICAL
 ACCURACY OF THE WORK IN ACCORDANCE WITH APPLICABLE
 CODES, STANDARDS, AND SOUND ENGINEERING PRINCIPLES.
 SPECIFIC AUTHORITY 471.008, 471.033(2), FS
 LAW IMPLEMENTED 471.005(7), 471.033(2), FS
 HISTORY?NEW 5-19-93, FORMERLY 21H-32.004, AMENDED
 4-2-2000, 6-26-01, 7-12-05
  
  
 PLEASE PROVIDE FOR THE REQUIRED EOR DOCUMENTS.
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2019-03-18 Cont ID  
Sent By J.Walker Date 2019-03-18 Time   Rev Time  
Received By   Date 2019-03-12 Time   Sent To B
Notes
2019-03-18 08:43:36NEED REQUIRED 61G15.32-004 DOCUMENTS
 SHOP DRAWINGS FOR FIRE SPRINKLER SYSTEM

Review Stop G GAS REVIEW
Rev No 3 Status P Date 2019-08-28 Cont ID  
Sent By rmcdouga Date 2019-08-28 Time 06:42 Rev Time 0.00
Received By rmcdouga Date 2019-08-20 Time 19:38 Sent To  
Notes
2019-08-28 06:45:21REVIEWED BY TIM HUNT (CONTRACT EMPLOYEE).

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2019-07-16 Cont ID  
Sent By gjohnson Date 2019-07-16 Time 15:56 Rev Time 0.00
Received By gjohnson Date 2019-07-16 Time 15:56 Sent To  
Notes
2019-07-16 16:25:521ST REVIEW:
 2017 FLORIDA BUILDING CODE 6TH EDITION
 2017 FLORIDA BUILDING CODE - PLUMBING, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - ACCESSIBILITY, SIXTH
 EDITION
 2017 FLORIDA BUILDING CODE - FUEL GAS, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - RESIDENTIAL, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - EXISTING BUILDING, SIXTH
 EDITION
 2017 FLORIDA BUILDING CODE - ENERGY CONSERVATION, SIXTH
 EDITION
  
 GAS COMMENTS: PREVIOUS COMMENTS
  
 3) SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE,
 TERMINATION POINT, HEIGHT ABOVE THE ROOF AND ANCHORING
 DETAILS OF THE GAS VENT(S) PER 2017 FBC-FUEL GAS SECS.
 502 THRU 505
 DETAIL PROVIDED IS INSUFFICIENT PLEASE PROVIDE THE
 FOLLOWING INFORMATION A) THE TYPE OF VENT OR EXHAUST
 PIPING. B) LOCATION OF TERMINATION POINT. C) LENGTH OF
 THE VENT OR EXHAUST.D) SIZE OF VENT OR EXHAUST PIPING.
  
 4) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS /
 INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY
 COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58. GAS
 APPLIANCES SHALL BE LISTED AND LABELED. INSTALLATION
 MANUAL SHALL CALL OUT THAT THE APPLIANCE IS ABLE TO RUN
 @ 15" W.C.
 CAN NOT BE DEFERRED SUBMITTAL
  
 5) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE ADDED GAS
 APPLIANCES. WHERE COMBUSTION AIR IS PROVIDED BY THE
 BUILDING'S MECHANICAL VENTILATION SYSTEM, THE SYSTEM
 SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN
 ADDITION TO THE REQUIRED VENTILATION AIR. 2017 FBC-FUEL
 GAS SEC.304.9.3
 COULD NOT LOCATE COMBUSTION AIR CALCULATIONS RESPONSE
 LETTER STATE CALC ARE ON SHEET MO.1 NONE FOUND.
  
 6) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 PRESSURE REGULATORS. REGULATORS INSTALLED ON THE
 EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR
 INSTALLATION. 2014 FGC SEC.410.1 OR SHOW THAT EQUIPMENT
 IS ABLE TO RUN AT 15" W.C.
 CAN NOT BE DEFERRED SUBMITTAL
  
 NEW COMMENTS:
  
 1. PLEASE SHOW METER ON RISER. PER WPB AMEND TO FBC
 107.2.1
  
  
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  
  
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2019-04-09 Cont ID  
Sent By thunt Date 2019-04-09 Time 14:09 Rev Time 0.00
Received By thunt Date 2019-04-09 Time 14:09 Sent To  
Notes
2019-04-09 14:09:23GAS 1ST REVIEW**DENIED
  
 1) SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE
 LENGTH OF ALL CUT SECTIONS OF PIPE PER 2017 FBC-FUEL
 GAS, SECS. 402.4.1, 402.4.2.
  
 2) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS
 METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2017
 FBC-FUEL GAS SEC.402.4.1, 402.4.2
  
 3) SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE,
 TERMINATION POINT, HEIGHT ABOVE THE ROOF AND ANCHORING
 DETAILS OF THE GAS VENT(S) PER 2017 FBC-FUEL GAS SECS.
 502 THRU 505
  
 4) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS /
 INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY
 COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58. GAS
 APPLIANCES SHALL BE LISTED AND LABELED. INSTALLATION
 MANUAL SHALL CALL OUT THAT THE APPLIANCE IS ABLE TO RUN
 @ 15" W.C.
  
 5) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE ADDED GAS
 APPLIANCES. WHERE COMBUSTION AIR IS PROVIDED BY THE
 BUILDING'S MECHANICAL VENTILATION SYSTEM, THE SYSTEM
 SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN
 ADDITION TO THE REQUIRED VENTILATION AIR. 2017 FBC-FUEL
 GAS SEC.304.9.3
  
 6) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 PRESSURE REGULATORS. REGULATORS INSTALLED ON THE
 EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR
 INSTALLATION. 2014 FGC SEC.410.1 OR SHOW THAT EQUIPMENT
 IS ABLE TO RUN AT 15" W.C.
  
 7) WHAT FUEL IS POWERING THE GENERATOR? FBC 107.2.1
  
  
 TIM HUNT
 PLUMBING PLANS EXAMINER
 BUILDING DIVISION
 CITY OF WEST PALM BEACH
 401 CLEMATIS STREET, 1ST FLOOR
 WEST PALM BEACH, FL 33401
 561-248-2703
 [email protected]
  
  
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2019-09-09 Cont ID  
Sent By cpuell Date 2019-09-09 Time 11:52 Rev Time 0.00
Received By cpuell Date 2019-08-05 Time 10:14 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-08-01 Cont ID  
Sent By lmarchan Date 2019-08-01 Time 07:49 Rev Time 0.00
Received By lmarchan Date 2019-06-23 Time 08:24 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-04-25 Cont ID  
Sent By dbattles Date 2019-04-25 Time 13:30 Rev Time 0.00
Received By dbattles Date 2019-03-05 Time 13:56 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2019-09-10 Cont ID  
Sent By lmarchan Date 2019-09-10 Time 16:47 Rev Time 0.00
Received By lmarchan Date 2019-09-10 Time 16:47 Sent To  
Notes
2019-09-10 16:48:02IMPACT FEE REVIEW DONE UNDER FOUNDATION PERMIT
 18120791. UPLOADED COPY OF RECEIPT.
 RECEIPT MU-2019-0328-287 - $21,711.90 - PAID

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2019-04-25 Cont ID  
Sent By dbattles Date 2019-04-25 Time 13:24 Rev Time 0.00
Received By dbattles Date 2019-04-22 Time 13:02 Sent To  
Notes
2019-04-25 13:24:04109 FBC[AMENDED] PLANS WILL BE REVIEWED BY THE PBC
 IMPACT FEE OFFICE DIGITALLY VIA PROJECTDOX UPON
 NOTIFICATION BY THIS OFFICE. NOTIFICATION MAY OCCUR
 WHEN PLANS ARE NEAREST FINAL FORM. YOU MAY COORDINATE
 WITH THE IMPACT FEE OFFICE AT (561) 233-5025 OR SIMPLY
 UPLOAD THE MUNICIPAL IMPACT FEE QUESTIONNAIRE FORM TO
 YOUR PROJECT AND NAME THE FILE MUNICIPAL IMPACT FEE
 QUESTIONNAIRE. THE FORM CAN BE FOUND AT: HTTP://DISCOVE
 R.PBCGOV.ORG/PZB/ADMINISTRATION/PDF/IMPACTFEES/FORMS/QU
 ESTIONNAIRE.PDF UPON APPROVAL AND FEE PAYMENT, PLEASE
 UPLOAD THE RECEIPT TO YOUR PROJECT OR EMAIL IT TO
 [email protected]

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2019-08-20 Cont ID  
Sent By pvalenti Date 2019-08-20 Time 13:56 Rev Time 0.00
Received By pvalenti Date 2019-08-20 Time 13:56 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2019-07-31 Cont ID  
Sent By pvalenti Date 2019-07-31 Time 17:34 Rev Time 0.00
Received By pvalenti Date 2019-07-31 Time 17:34 Sent To  
Notes
2019-07-31 17:35:48PASSED PER C. COLE (WORKING REMOTELY)

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2019-04-12 Cont ID  
Sent By ccole Date 2019-04-12 Time 12:50 Rev Time 0.00
Received By ccole Date 2019-04-11 Time 17:02 Sent To  
Notes
2019-04-12 12:50:551ST REVIEW FBC-2017 MECHANICAL
 PERMIT #19021196
 4/12/19
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SHEET M0.2- DESIGN CRITERIA: REFER TO TABLE
 403.3.1.1 FBC M AND PROVIDE MINIMUM OUTDOOR AIR AND
 EXHAUST VENTILATION CALCULATIONS FOR THE FACILITY.
 PLEASE NOTE THAT THE EXHAUST AIR FLOW RATE SHALL BE 0.9
 CFM PER SF. PLEASE INCLUDE AIR BALANCE CALCULATIONS.
  
 2) SHEETS M0.3, & M0.4: IT APPEARS THAT ENERGY RECOVERY
 VENTILATORS WILL BE REQUIRED FOR THE SYSTEMS SERVING
 THE DOG AND CAT AREAS BASED ON THE EQUIPMENT SCHEDULES
 FOR AHU'S 1, 3, 4, 5 AND EF'S 1-5, 1-6, 3-1, 3-2, 4-1,
 4-2, 5-1, 5-2, & 5-3. REFER TO SECTION AND TABLE
 C403.2.7 FBC EC. A) THERE IS NO SEQUENCE OF OPERATION
 OR CONTROL DIAGRAMS PROVIDED FOR THE EXHAUST FANS.
 PLEASE CLARIFY HOW THE CURRENT EXHAUST VENTILATION
 SYSTEM WILL OPERATE- SEE SECTION 501.4 FBC M.
  
 3) COMMISSIONING OF THE MECHANICAL AND SERVICE WATER
 HEATING SYSTEMS IS REQUIRED PER SECTION C408.2 FBC-17
 ENERGY CONSERVATION. SUBMIT A COMMISSIONING PLAN AS
 OUTLINED IN SECTION C408.2.1 AND DESCRIBED IN SECTIONS
 C403.2.2- C408.2.3.3. PLEASE NOTE THAT A COPY OF THE
 COMMISSIONING REPORT SHALL BE SUBMITTED FOR REVIEW AT
 FINAL INSPECTION.
  
 4) SHEETS A3.3, M2.1 & M2.2: PLEASE PROVIDE
 FIRE-RESISTANT WALL SYMBOLS THAT CORRELATE WITH WALL
 SYMBOLS ON THE PLAN IN ORDER TO LOCATE DUCT
 PENETRATIONS THAT MAY REQUIRE FIRE DAMPERS- SECTION
 107.2.1 WPB AND SECTION 607 FBC M.
  
 5) M2.1 & M2.2: PROVIDE A DUCT SMOKE DETECTOR SYMBOL AT
 EACH AHU SUPPLY DROP AND A NOTE FOR CLARIFICATION-
 SECTION 606.2.1 FBC M.
  
 6) M2.1: SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 DRYERS AND DRYER EXHAUST DUCTS- SECTION 614.1 FBC FG.
 THE DRYERS APPEAR TO BE COMMERCIAL GAS DRYERS THAT
 REQUIRE COMBUSTION AIR. REFER TO SECTION 304.6.2 FBC FG
 AND VERIFY THE EXTERIOR WALL LOUVER IS SIZED AND
 LOCATED PROPERLY IN THE ROOM. A) PROVIDE A DRYER
 EXHAUST DIAGRAM INDICATING THE TYPE AND SIZE OF DRYER
 EXHAUST DUCTS, TOTAL BRANCH AND TOTAL RUN LENGTHS,
 CLEANOUT LOCATIONS, AND TERMINATION LOCATION AND
 CAPPING- SECTION 614.9. PLEASE NOTE THAT DUCTS SHALL
 HAVE MINIMUM 6? CLEARANCES TO COMBUSTIBLES- SECTION
 614.9 FBC FG.
  
 7) M2.1: SUBMIT FL. PRODUCT APPROVAL AND/OR MIAMI-DADE
 NOA'S FOR THE AIR INLET AND EXHAUST OUTLET LOUVERS-
 RULE 9N-3 FAC.
  
 8) M2.1 & M3.6: SUBMIT MANUFACTURER'S SPECIFICATIONS
 FOR THE BOILERS AND THE COMBUSTION AIR DUCT AND EXHAUST
 FLUE- SECTION 631.1. A) INDICATE THE TYPE AND SIZE OF
 COMBUSTION AIR DUCTS AND SHOW THE DUCT RUNS FROM INLET
 TO OUTLET- SECTION 304.11 FBC FG. B) INDICATE THE TYPE
 AND SIZE OF EXHAUST FLUE VENTS AND SHOW THE DUCT RUN
 FROM INLET TO OUTLET- SECTIONS 502 AND 503 FBC FG. C)
 SHOW THE BOILER RELIEF VALVE DISCHARGE PIPING RUNS AND
 TERMINATION LOCATIONS.
  
 9) PROVIDE WIND LOAD ENGINEERING FOR INSTALLATION OF
 THE CHILLERS AND PUMPS- SECTION 301.15 FBC M.
  
 10) M4.4: PROVIDE THE WIND LOAD DESIGN CRITERIA USED TO
 DETERMINE THE METHODS USED TO ANCHOR THE CONDENSERS,
 FANS AND FAN CURBS, A) PROVIDE COMPLETE FASTENING AND
 ANCHORING DETAILS, AND SUBMIT THE NOA FOR THE CONDENSER
 ROOF STAND- RULE 9N-3 FAC.
  
 11) PROVIDE DETAILS SHOWING HOW THE ROOF LADDER WILL BE
 CONSTRUCTED AND ATTACHED TO THE STRUCTURE- SEE SECTION
 306.5 FBC M.
  
 12) EMERGENCY GENERATOR: IT IS NOT CLEAR WHAT TYPE OF
 FUEL WILL POWER THE GENERATOR- NATURAL GAS OR DIESEL
 FUEL.
 A) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 GENERATOR, FUEL PIPING, ENGINE EXHAUST PIPE, MUFFLER,
 AND ALL OTHER ASSOCIATED SYSTEM COMPONENTS- SECTION
 304.1 FBC M. B) SUBMIT THE UL 2200 CERTIFICATE OF
 COMPLIANCE FOR THE GENERATOR- SECTION 915.1 FBC M. THE
 MANUFACTURER'S SPECIFICATIONS AND/OR UL CERTIFICATE
 SHALL INDICATE THE GENERATOR IS IN COMPLIANCE WITH NFPA
 37. C) PROVIDE AN EXHAUST PIPE DIAGRAM SHOWING THE
 TOTAL SYSTEM RUN AND LENGTH MEASUREMENT, AND
 TERMINATION LOCATION, AND CLEARANCE DISTANCES GRAVITY
 OR MECHANICAL AIR INTAKES INTO THE BUILDING. PLEASE
 INCLUDE ALL COMPONENTS OF THE SYSTEM INCLUDING THE
 SILENCER.- SEE SECTION 8.1- 8.4 NFPA 37, AND SECTION
 501.3.1 FBC M. D) PROVIDE WIND LOAD ENGINEERING FOR
 ATTACHMENT OF THE GENERATOR TO THE ROOF STRUCTURE-
 SECTION 301.15 FBC M.
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  

Review Stop P PLUMBING
Rev No 3 Status P Date 2019-08-28 Cont ID  
Sent By rmcdouga Date 2019-08-28 Time 06:41 Rev Time 0.00
Received By rmcdouga Date 2019-08-20 Time 19:38 Sent To  
Notes
2019-08-28 06:42:40RED LINE SHT. A7.0 GRAB BARS 36" NOT TO CENTER BUT
 TOPOF GRIPPING SURFACE. FBC-ACC 609.4.
  
 REVIEWED BY TIM HUNT (CONTRACT EMPLOYEE).

Review Stop P PLUMBING
Rev No 2 Status F Date 2019-07-16 Cont ID  
Sent By gjohnson Date 2019-07-16 Time 15:44 Rev Time 0.00
Received By gjohnson Date 2019-07-16 Time 10:38 Sent To  
Notes
2019-07-16 15:56:362ND REVIEW:
 2017 FLORIDA BUILDING CODE 6TH EDITION
 2017 FLORIDA BUILDING CODE - PLUMBING, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - ACCESSIBILITY, SIXTH
 EDITION
 2017 FLORIDA BUILDING CODE - FUEL GAS, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - RESIDENTIAL, SIXTH EDITION
 2017 FLORIDA BUILDING CODE - EXISTING BUILDING, SIXTH
 EDITION
 2017 FLORIDA BUILDING CODE - ENERGY CONSERVATION, SIXTH
 EDITION
  
 PLUMBING COMMENTS:
  
 1. PLEASE PROVIDE SIZING CALCULATIONS FOR GREASE
 INTERCEPTOR I COULD NOT LOCATE ANY ON REVISED PLAN. PER
 FBC PL 1003.3.1
  
 2. SHT. P3.3 SHOWS GB-2 DETAIL ON P5.2 SHOWS A GB-50
 PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2019-04-09 Cont ID  
Sent By thunt Date 2019-04-09 Time 15:02 Rev Time 0.00
Received By thunt Date 2019-04-09 Time 09:52 Sent To  
Notes
2019-04-09 15:02:48PLUMBING 1ST REVIEW**DENIED**
  
 1) THE WORK/ DISHWASH ROOM #111 SHALL REQUIRE A GREASE
 INTERCEPTOR BE INSTALLED. FBC 1003.1, 1003.3.1. PROVIDE
 MANUFACTURES INSTALLATION MANUAL FOR THE INTERCEPTOR
 AND THE SIZING CALCULATIONS. A REVISE SANITARY
 ISOMETRIC DRAWING IS REQUIRED. FBC 107.3.5
  
 2) ALL ADA TOILET COMPARTMENTS SHALL HAVE A SINK
 LOCATED WITH IN THE COMPARTMENT. REFER TO FBC-A
 604.8.1.6.
  
 3) SHOW MEASUREMENT TO THE TOILET PAPER DISPENSER BEING
 MEASURED FROM THE FRONT LIP OF THE BOWL TO THE CENTER
 OF THE DISPENSER. FBC-A 604.7
  
 4) SHOW GRAB BAR MOUNTING HEIGHTS ARE TO THE TOP
 GRIPPING SURFACE AND NOT THE CENTER OF THE BAR. FBC-A
 609.4
  
 5) SHOW THE SIDE GRAB BAR AS MIN 42? MOUNTING 12? FROM
 BACK WALL AND OVERALL MIN TO BE 54?. FBC-A 604.5.1
  
 6) SHOW REAR GRAB BAR AS MIN 36? AND MOUNTED 12? FROM
 CENTERLINE OF TOILET TOWARDS SIDE WALL. FBC-A 604.5.2
  
 7) SHOW ADA TOILETS AS BEING 17? TO 19? TO TOP OF SEAT.
 FBC-A 604.4
  
 8) PROVIDE CLEAR FLOOR SPACE FOR ALL REQUIRED FIXTURES.
 TOILETS, LAV SINKS, BREAK ROOM SINK, AND DRINKING
 FOUNTAIN. FBC -A 605, 306
  
 9) SHT. P3.3. SHOW 3 COMPARTMENT SINK AS BEING
 IN-DIRECTLY WASTED. FBC-P802.1
  
 10) SHT. P4.2, 4.3, 4.4 HAS SECTION THAT ARE NOT VENTED
 OR IT APPEARS THE DISTANCE FROM THE POINT OF VENT
 EXCEEDS FBC-P FBC-P 909.1: EXAMPLES OF NOT VENTED ARE
 ALL TD-1 P-TRAPS. FBC-P901.2.1
  
 11) PROVIDE VALVES AT ALL DOWN FEED DROPS FOR WATER
 ISOMETRIC SHT. P4.5, 4.6, 4.7. FBC-P 606.1 (5)
  
 12) PROVIDE DETAIL NOTED THAT ALL PUBLIC HAND WASHING
 SINKS TO BE TEMPERED BY A DEVICE MEETING ASSE 1070. FBC
 607.1.2
  
 TIM HUNT
 PLUMBING PLANS EXAMINER
 BUILDING DIVISION
 CITY OF WEST PALM BEACH
 401 CLEMATIS STREET, 1ST FLOOR
 WEST PALM BEACH, FL 33401
 561-248-2703
 [email protected]
 [email protected]
  
  
  

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status N Date 2019-06-27 Cont ID  
Sent By dbattles Date 2019-06-27 Time 07:58 Rev Time 0.00
Received By dbattles Date 2019-06-27 Time 07:58 Sent To  
Notes
2019-06-27 08:04:04PRODUCT APPROVALS DUE WITH SUB PERMIT.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2019-04-25 Cont ID  
Sent By dbattles Date 2019-04-25 Time 13:26 Rev Time 0.00
Received By dbattles Date 2019-04-24 Time 07:38 Sent To  
Notes
2019-04-25 13:27:24SEE BUILDING COMMENT #17

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2019-08-16 Cont ID  
Sent By dbattles Date 2019-08-16 Time 16:14 Rev Time 0.00
Received By dbattles Date 2019-08-16 Time 16:14 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2019-06-27 Cont ID  
Sent By dbattles Date 2019-06-27 Time 08:10 Rev Time 0.00
Received By dbattles Date 2019-06-27 Time 08:10 Sent To  
Notes
2019-06-27 08:20:40A-SHEETS FROM RE-SUBMITTAL OK
 S-SHEETS - SOME DIGITALLY SIGNED AND SOME NOT-IF ANY
 ADDITIONAL SHEETS ARE SUBMITTED PLEASE DIGITALLY SIGN
 THEM.
 MEP-SHEETS - IF ADDITIONAL SHEETS ARE SUBMITTED PLEASE
 HAVE THE DIGITAL SIGNATURE WITH THIRD PARTY
 VERIFICATION
 SEE (61G15-23 PE RULES FAC, FS 471 ENGINEERING FS)
  
 DYLAN BATTLES
 561-805-6718
 [email protected]
  
 THE CITY OF WEST PALM BEACH
 BUILDING PLANS EXAMINER PX4191
  
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2019-04-09 Cont ID  
Sent By thunt Date 2019-04-09 Time 13:54 Rev Time 0.00
Received By thunt Date 2019-04-09 Time 13:54 Sent To  
Notes
2019-04-24 07:35:32A-SHEETS - OK
 S-SHEETS - OK
 SP-1 NOT DIGITALY SIGNED
2019-04-09 15:53:55ELECTRICAL SHEETS OK.
  
2019-04-09 13:57:41ENERGY COUNTS ARE MISSING DESIGN PROFESSIONALS
 SIGNATURE. F.S 471, 481
  
 TIM HUNT
 PLUMBING PLANS EXAMINER
 BUILDING DIVISION
 CITY OF WEST PALM BEACH
 401 CLEMATIS STREET, 1ST FLOOR
 WEST PALM BEACH, FL 33401
 561-248-2703
 [email protected]
  
  
  

Review Stop Z ZONING
Rev No 3 Status P Date 2019-08-29 Cont ID  
Sent By eschneid Date 2019-08-29 Time 11:55 Rev Time 0.25
Received By eschneid Date 2019-08-29 Time 11:26 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2019-07-26 Cont ID  
Sent By eschneid Date 2019-07-26 Time 13:12 Rev Time 2.00
Received By eschneid Date 2019-07-25 Time 15:30 Sent To  
Notes
2019-07-26 13:16:36PASSED W/PROVISO
  
 1) THE PLANS APPROVED BY THE CITY COMMISSION AND THE
 PLANS PROVIDED WITH THE PERMIT SHOW DIFFERING
 CONDITIONS SO PRIOR TO THE FINAL INSPECTION FOR THE
 ADOPTION CENTER, SUBMIT A MINOR PLANNED DEVELOPMENT
 AMENDMENT TO THE PLANNING DIVISION SHOWING THE ALL
 CHANGES TO THE APPROVED PLANS THAT HAVE BEEN APPROVED
 AS PART OF THE BUILDING PERMIT REVIEW PROCESS.
  
 2) SEPARATE PERMITS, WITH PLANS, ARE REQUIRED FOR:
 A. PARKING LOT TO INCLUDE ANY PARKING LOT STRIPING
 B. BICYCLE RACKS
 C. TEMPORARY TRAILERS
 D. WALLS AND FENCES
 E. SIGNS
 F. TRELLIS
 G. SITE LIGHTING.
 H. THE REVISED DRIVEWAY CONNECTION TO MILITARY TRAIL.
 I. DUMPSTER ENCLOSURE.
  

Review Stop Z ZONING
Rev No 1 Status F Date 2019-04-04 Cont ID  
Sent By eschneid Date 2019-04-04 Time 10:14 Rev Time 2.00
Received By eschneid Date 2019-04-03 Time 13:24 Sent To  
Notes
2019-04-04 10:14:20FAILED
  
 PROVIDE WRITTEN RESPONSE TO COMMENTS.
  
 1) THE FUNCTION OF SPACE DIAGRAM PROVIDED WITH THE
 PERMIT DOES NOT MATCH THE FUNCTION OF SPACE DIAGRAM
 PROVIDED WITH THE PLANS APPROVED BY THE CITY
 COMMISSION. THE BUILDING PERMIT PLANS SHOW
 SIGNIFICANTLY MORE AREA AS ASSEMBLY INSTEAD OF STORAGE,
 WHICH WILL MAKE THE SITE DEFICIENT FOR PARKING.
  
 2) THE PLANS APPROVED BY THE CITY COMMISSION AND THE
 PLANS PROVIDED WITH THE PERMIT SHOW DIFFERING
 CONDITIONS (EX: SITE PLAN - TWO ADA PARKING SPACES
 SERVING THE GRACE PAVILION ARE IN DIFFERENT LOCATION.
 ELEVATIONS ? NEW DOOR ON THE EAST ELEVATION). PRIOR TO
 THE FINAL INSPECTION FOR THE ADOPTION CENTER, SUBMIT A
 MINOR PLANNED DEVELOPMENT AMENDMENT TO THE PLANNING
 DIVISION SHOWING THE ALL CHANGES TO THE APPROVED PLANS
 THAT HAVE BEEN APPROVED AS PART OF THE BUILDING PERMIT
 REVIEW PROCESS.
  
 3) PROVIDE VERIFICATION ON HOW THE ROOFTOP MECHANICAL
 EQUIPMENT, TO INCLUDE THE CONDENSING UNITS, WILL BE
 SCREENED FROM VIEW OF THE RESIDENTIAL PROPERTY TO THE
 NORTH AND EAST OF THE SITE AND THE PUBLIC
 RIGHTS-OF-WAY.
  
 4) THE ELECTRICAL SITE PLAN CALLS OUT A NEW FPL POLE.
 THE DEVELOPMENT REGULATIONS FOR THE PEGGY ADAMS CSPD
 REQUIRE THAT ALL NEW UTILITY LINES BE BURIED
 UNDERGROUND, WHICH DOES NOT PERMIT THE USE OF NEW
 UTILITY POLES ON THE SITE.
  
 5) SEPARATE PERMITS, WITH PLANS, ARE REQUIRED FOR:
 A. ANY PARKING LOT STRIPING
 B. BICYCLE RACKS
 C. TEMPORARY TRAILERS
 D. WALLS AND FENCES
 E. SIGNS
 F. TRELLIS
 G. SITE LIGHTING.
 H. THE REVISED DRIVEWAY CONNECTION TO MILITARY TRAIL.
  
 6) PLEASE NOTE THAT 004 SHEET SP-2 TEMPORARY TRAILERS &
 SITE DETAILS WAS REMOVED FROM SUBMITTAL AS ALL ITEMS ON
 THIS SHEET REQUIRE SEPARATE PERMITS.
  
 7) PLEASE NOTE THAT 044 SHEET A1.2 FENCES SIDE DETAILS
 WAS REMOVED FROM SUBMITTAL AS ALL ITEMS ON THIS SHEET
 REQUIRE SEPARATE PERMITS.
  
 8) AS PART OF THE PERMIT FOR THE REVISED DRIVEWAY
 CONNECTION TO MILITARY TRAIL, PROVIDE A COPY OF THE
 FDOT DRIVEWAY CONNECTION APPROVAL. PRIOR TO THE CITY'S
 FINAL INSPECTION, YOU WILL NEED TO PROVIDE THE CITY
 WITH A COPY OF THE FDOT ACCEPTANCE OF THE DRIVEWAY
 MODIFICATIONS TO MILITARY TRAIL.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446.
 [email protected]
  