| Plan Review Stops For Permit 19020417 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2019-06-25 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-06-25 |
Time |
07:21 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-06-25 |
Time |
06:57 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2019-04-22 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-04-22 |
Time |
11:45 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-04-22 |
Time |
09:41 |
Sent To |
I |
|
| Notes |
| 2019-04-22 11:45:06 | PLAN | | | REVIEW COMMENTS | | | | | | 2ND REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) COMPLIED | | | | | | 2) NOT ADDRESSED. THE DETAILS ON SHEET C4 DO NOT | | | PROVIDE THE REQUIRED ANCHORING DETAILS FOR THE EXTERIOR | | | ANTENNA AND THE NOTE STATES THAT THE STRUCTURAL | | | ANALYSIS WAS PREFORMED BY OTHERS. SUBMIT A SIGNED AND | | | SEALED STRUCTURAL ANALYSIS OF THE ANTENNA MOUNT AND | | | REQUIRED ANCHORS THAT ARE ADEQUATE TO RESIST THE WIND | | | LOADS. FBC 1604.1 | | | BOTH THE PLANS AND THE STRUCTURAL ANALYSIS THAT WAS | | | SUBMITTED FAIL TO PROVIDE THE DETAILS ON THE PROPOSED | | | WEDGE ANCHORS. THE STRUCTURAL ANALYSIS NEEDS TO SPECIFY | | | THE ANCHOR SIZE AND THE EMBEDMENT DEPTH OF THE WEDGE | | | ANCHORS, IF A WASHER IS REQUIRED AS WELL AS THE | | | REQUIRED PSI VALUE OF THE CONCRETE SUBSTRATE. FBC | | | 107.2.1.2 | | | | | | 3) PARTIALLY ADDRESSED. THE FIRESTOP DETAIL 1 ON SHEET | | | C6, FOR CONCRETE PENETRATIONS HAS A T RATING OF 0 HRS. | | | FBC 714.4.1.2 REQUIRES FLOOR/CEILING | | | THROUGH-PENETRATIONS TO HAVE A T RATING OF NOT LESS | | | THAN 1 HR. BUT NOT LESS THAN THE REQUIRED RATING OF THE | | | FLOOR PENETRATED. | | | THE PLANS STILL HAVE THE DETAIL WITH NO T RATING. IN | | | ORDER TO PREVENT CONFUSION IN THE FIELD, THIS NEEDS BE | | | REMOVED FROM THE PLANS AND REPLACED BY THE ASSEMBLY | | | WITH THE T RATING THAT WAS SUBMITTED WITH THE | | | DOCUMENTS. | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2019-03-12 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-03-12 |
Time |
17:13 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-03-12 |
Time |
13:11 |
Sent To |
|
|
| Notes |
| 2019-03-12 16:51:02 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) ELECTRONICALLY SUBMITTED PLANS ARE REQUIRED TO BE | | | DIGITALLY SIGNED BY THE FLORIDA P.E. PER FS 471 & FAC | | | 61G15-23.003. | | | | | | 2) THE DETAILS ON SHEET C4 DO NOT PROVIDE THE REQUIRED | | | ANCHORING DETAILS FOR THE EXTERIOR ANTENNA AND THE NOTE | | | STATES THAT THE STRUCTURAL ANALYSIS WAS PREFORMED BY | | | OTHERS. SUBMIT A SIGNED AND SEALED STRUCTURAL ANALYSIS | | | OF THE ANTENNA MOUNT AND REQUIRED ANCHORS THAT ARE | | | ADEQUATE TO RESIST THE WIND LOADS. FBC 1604.1 | | | | | | 3) THE FIRESTOP DETAIL 1 ON SHEET C6, FOR CONCRETE | | | PENETRATIONS HAS A T RATING OF 0 HRS. FBC 714.4.1.2 | | | REQUIRES FLOOR/CEILING THROUGH-PENETRATIONS TO HAVE A T | | | RATING OF NOT LESS THAN 1 HR. BUT NOT LESS THAN THE | | | REQUIRED RATING OF THE FLOOR PENETRATED. | | | | | | | | | | | | | | | | | 2019-02-27 08:24:23 | SEE HIGHLIGHTED NOTE ON PAGE C4, LET ME KNOW IF YOU | | | PASS PLAN JLEAHY |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2019-04-11 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-04-11 |
Time |
14:58 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-04-11 |
Time |
14:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2019-02-27 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-02-27 |
Time |
08:22 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-02-26 |
Time |
16:11 |
Sent To |
|
|
| Notes |
| 2019-02-27 08:23:42 | FLORIDA BUILDING CODE 2017 6TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED | | | NFPA 70 2014 EDITION | | | | | | JAKE LEAHY | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | PLEASE SUBMIT A SIGNED COPY OF THE CONTRACT FOR WORK | | | INVOLVED. VALUE TO LOW. | | | | | | FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING | | | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE | | | TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, | | | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, | | | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, | | | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY | | | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST | | | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS | | | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY | | | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT | | | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. | | | | | | FORWARDED PLAN TO THE BUILDING PLANS EXAMINER TO REVIEW | | | SOME OF THE NOTES ON PLANS. IF BUILDING PASSES | | | ELECTRICAL WILL SIGN OFF,, JLEAHY |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2019-04-01 |
|
|
Cont ID |
|
| Sent By |
scaldero |
Date |
2019-04-01 |
Time |
13:43 |
Rev Time |
0.00 |
| Received By |
scaldero |
Date |
2019-04-01 |
Time |
13:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2019-02-12 |
|
|
Cont ID |
|
| Sent By |
scaldero |
Date |
2019-02-12 |
Time |
12:20 |
Rev Time |
0.00 |
| Received By |
scaldero |
Date |
2019-02-12 |
Time |
12:04 |
Sent To |
|
|
| Notes |
| 2019-02-12 12:17:06 | PERMIT #19020417 | | | FIRE REVIEW COMMENTS | | | | | | 1) APPLICATION IS APPROVED PENDING IN FIELD TESTING AND | | | VERIFICATION OF FUNCTIONALITY AND COMPLIANCE WITH ALL | | | APPLICABLE CODES AND STANDARDS. | | | | | | SUE ELLEN CALDERON | | | ASST. FIRE MARSHAL | | | WPBFD | | | [email protected] |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2019-06-25 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-06-25 |
Time |
07:44 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-06-03 |
Time |
12:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2019-04-22 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-04-22 |
Time |
11:45 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-03-27 |
Time |
08:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2019-03-12 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-03-12 |
Time |
17:14 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-02-10 |
Time |
09:07 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2019-06-25 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-06-25 |
Time |
07:44 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-06-25 |
Time |
07:21 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2019-04-22 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-04-22 |
Time |
11:45 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-04-22 |
Time |
11:45 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2019-03-12 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2019-03-12 |
Time |
17:13 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2019-03-12 |
Time |
17:13 |
Sent To |
|
|
| Notes |
| 2019-03-12 17:14:30 | CONSTRUCTION DOCUMENTS HAVE NOT BEEN ELECTRONICALLY | | | SIGNED. |
|
|