Plan Review Details - Permit 19010472
Plan Review Stops For Permit 19010472
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2019-05-28 Cont ID  
Sent By rmcdouga Date 2019-05-28 Time 17:15 Rev Time 0.00
Received By rmcdouga Date 2019-05-28 Time 17:15 Sent To I
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2019-05-08 Cont ID  
Sent By rmcdouga Date 2019-05-08 Time 18:41 Rev Time 0.00
Received By rmcdouga Date 2019-05-08 Time 18:41 Sent To I
Notes
2019-05-08 18:41:46PLAN
 REVIEW COMMENTS
  
 3RD REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE SIGNED AND SEALED ENGINEERING THAT WAS SUBMITTED
 FOR THE DIVERSITECH PADS IS LIMITED TO GENERAC
 GENERATORS WITH SPECIFIC DIMENSIONS AND WEIGHT. SEE
 LIMITS AND REQUIREMENTS OF USE ON PAGE 1 OF THE
 DOCUMENTS. IN ORDER TO USE THESE PADS FOR THE POOL
 HEATERS, YOU WILL HAVE TO PROVIDE A COMPARATIVE
 ANALYSIS TO SHOW THAT THE DIMENSIONS, WEIGHT AND
 ANCHORING ARE EQUAL TO THE GENERATOR THAT THE PAD IS
 DESIGNED FOR. YOU WILL ALSO NEED TO SUBMIT THE
 MANUFACTURER'S SPECIFICATIONS FOR THE POOL HEATER WITH
 ITS DIMENSIONS AND WEIGHT SPECIFIED. FBC 1609.1, FBCM
 301.15
 ALTERNATELY, YOU CAN FORM AND POUR A 4" CONCRETE SLAB
 IN PLACE. YOU WILL HAVE TO SUBMIT A DRAWING SHOWING THE
 DIMENSIONS OF THE SLAB WITH WIRE MESH OF FIBER-MESH
 CONCRETE. YOUR NAME AND SIGNATURE AND THE ADDRESS OF
 THE PROJECT IS REQUIRED ON THE DRAWINGS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2019-04-24 Cont ID  
Sent By thunt Date 2019-04-23 Time 14:49 Rev Time 0.00
Received By rmcdouga Date 2019-04-24 Time 17:21 Sent To  
Notes
2019-04-24 17:31:14PLAN
 REVIEW COMMENTS
  
 2ND REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SUBMIT TWO SETS OF PRODUCT APPROVALS ( MIAMI-DADE
 NOA OR FLORIDA ) OR SIGNED AND SEALED SITE SPECIFIC
 ENGINEERING FOR THE EQUIPMENT PADS FOR WIND LOADS. FBC
 1609.1, FBCM 301.15

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-01-23 Cont ID  
Sent By rmcdouga Date 2019-01-23 Time 08:05 Rev Time 0.00
Received By rmcdouga Date 2019-01-23 Time 08:05 Sent To  
Notes
2019-01-23 08:05:57PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE SCOPE OF WORK FOR THIS PROJECT IS CONSIDERED A
 MODIFICATION TO THE EXISTING PUBLIC POOL. SUBMIT A COPY
 OF THE STAMPED RECEIPT FROM THE FLORIDA DEPARTMENT OF
 HEALTH (PALM BEACH COUNTY HEALTH DEPARTMENT). SEE FAC
 64E-9.005 & FBC 105.1.4
  
 2) SUBMIT TWO SETS OF SIGNED AND SEALED PLANS SHOWING
 THE LOCATION OF THE PROJECT, LOCATION OF THE NEW AND
 EXISTING EQUIPMENT AND ANCHORING OF THE EQUIPMENT
 WINDLOADS. FBC 107.2.1
  
 3) THE DESCRIPTION OF WORK AND VALUE ON THE APPLICATION
 WAS REVISED TO REMOVE THE RESURFACING OF THE WADING
 POOL. REVISE THE SCOPE OF WORK ON THE OTHER SUBMITTAL
 DOCUMENTS TO MATCH THE APPLICATION. FBC 107.2.1
  
 4) ADDITIONAL APPLICATIONS AND PERMITS WILL BE REQUIRED
 FOR POOL PLUMBING AND ELECTRICAL. FBC 105.1.4

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2019-05-02 Cont ID  
Sent By jleahy Date 2019-05-02 Time 16:18 Rev Time 0.00
Received By jleahy Date 2019-05-02 Time 16:18 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2019-04-25 Cont ID  
Sent By jleahy Date 2019-04-25 Time 13:32 Rev Time 0.00
Received By jleahy Date 2019-04-25 Time 13:32 Sent To  
Notes
2019-04-25 13:33:22SEE REVIEW #1
  

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2019-02-01 Cont ID  
Sent By jleahy Date 2019-02-01 Time 10:03 Rev Time 0.00
Received By jleahy Date 2019-02-01 Time 10:03 Sent To  
Notes
2019-02-01 10:03:59FLORIDA BUILDING CODE 2017 6TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED
 NFPA 70 2014 EDITION
  
 JAKE LEAHY
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 NEED TO SUBMIT A SET OF DRAWINGS (2) FOR REVIEW.
  
 SHOWING ELECTRICAL WORK, SIZE OF CONDUCTORS AND CIRCUIT
 PROTECTION.
  
 BONDING IF RQUIRED.

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2019-02-23 Cont ID  
Sent By tklarge Date 2019-02-23 Time 05:43 Rev Time 0.00
Received By tklarge Date 2019-02-23 Time 05:40 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2019-05-28 Cont ID  
Sent By rmcdouga Date 2019-05-28 Time 17:16 Rev Time 0.00
Received By rmcdouga Date 2019-05-22 Time 16:19 Sent To  
Notes
2019-05-28 10:28:00PLUMBING COMPLETE; ROUTED TO RMCDOUGAL
2019-05-23 16:19:48RESUB ROUTED TO THUNT
 **TRAVELLING TOGETHER - 19010469, 19010470, 19010471, &
 19010472**

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2019-05-08 Cont ID  
Sent By rmcdouga Date 2019-05-08 Time 18:41 Rev Time 0.00
Received By rmcdouga Date 2019-04-26 Time 14:59 Sent To  
Notes
2019-04-29 14:59:33RESUB ROUTED TO JLEAHY
 **TRAVELLING TOGETHER - 19010469, 19010470, 19010471, &
 19010472**

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-04-25 Cont ID  
Sent By jleahy Date 2019-04-25 Time 13:33 Rev Time 0.00
Received By jleahy Date 2019-04-12 Time 15:03 Sent To  
Notes
2019-04-16 15:03:33RESUB ROUTED TO ZONING INBOX
 **TRAVELLING TOGETHER - 19010469, 19010470, 19010471, &
 19010472**

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-02-25 Cont ID  
Sent By mcruz Date 2019-02-25 Time 13:54 Rev Time 0.00
Received By mcruz Date   Time   Sent To PC
Notes
2019-01-15 13:13:04ROUTED TO ZONING INBOX
 **TRAVELLING TOGETHER - 19010469, 19010470, 19010471, &
 19010472**

Review Stop P PLUMBING
Rev No 4 Status P Date 2019-05-28 Cont ID  
Sent By jesmith Date 2019-05-28 Time 10:18 Rev Time 0.00
Received By jesmith Date 2019-05-28 Time 10:17 Sent To  
Notes
2019-05-28 10:18:16APPROVED

Review Stop P PLUMBING
Rev No 3 Status F Date 2019-05-06 Cont ID  
Sent By tklarge Date 2019-05-06 Time 07:57 Rev Time 0.00
Received By tklarge Date 2019-05-06 Time 07:56 Sent To  
Notes
2019-05-06 07:57:361) SUBMIT TWO COPIES OF THE MANUFACTURER'S
 SSPECIFICATIONS FOR ALL SYSTEM COMPONENTS INCLUDING THE
 HEAT PUMP. WPB AMEND. TO FBC SEC. 107.2.1.
 2) THE HEAT PUMP SHALL HAVE A MINIMUM COP OF 4.0 PER
 TABLE C404.2. SUBMIT VERIFICATION THAT THE UNIT
 COMPLIES.
 3) SUBMIT ALL THE DOCUMENTS INTO TWO COMPLETE SETS OF
 PLANS FOR EACH PERMIT NUMBER. WPB AMEND. TO FBC SEC.
 107.2.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop P PLUMBING
Rev No 2 Status F Date 2019-04-23 Cont ID  
Sent By thunt Date 2019-04-23 Time 14:48 Rev Time 0.00
Received By thunt Date 2019-04-23 Time 14:48 Sent To B
Notes
2019-04-23 14:48:41PLUMBING 2ND REVIEW**DENIED**PROVIDE 2 COPIES FOR EACH
 PERMIT APPLICATION
  
 1) PROVIDE INSTALLATION MANUALS FOR ALL NEW EQUIPMENT
 BEING INSTALLED. FBC 107.2.1
  
 2) PROVIDE PLUMBING FLAT DRAWING SHOWING PIPING TO NEW
 POOL HEATER AND NEW SALT SYSTEM. FBC 107.3.5
  
 TIM HUNT
 PLUMBING PLANS EXAMINER/ PLUMBING INSPECTOR
 CITY OF WEST PALM BEACH
 561-248-2703
 [email protected]
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2019-02-23 Cont ID  
Sent By tklarge Date 2019-02-23 Time 05:49 Rev Time 0.00
Received By tklarge Date 2019-02-23 Time 05:40 Sent To Z
Notes
2019-02-23 05:46:40 
  
 1) THE SCOPE OF WORK FOR THIS PROJECT IS CONSIDERED A
 MODIFICATION TO THE EXISTING PUBLIC POOL. SUBMIT A COPY
 OF THE STAMPED RECEIPT FROM THE FLORIDA DEPARTMENT OF
 HEALTH (PALM BEACH COUNTY HEALTH DEPARTMENT). SEE FAC
 64E-9.001 (3) (C) & FBC 105.1.4
  
 2) SUBMIT TWO SETS OF SIGNED AND SEALED PLANS SHOWING
 THE LOCATION OF THE PROJECT, LOCATION OF THE NEW AND
 EXISTING EQUIPMENT AND ANCHORING OF THE EQUIPMENT
 WINDLOADS. FBC 107.2.1
  
 3) THE DESCRIPTION OF WORK AND VALUE ON THE APPLICATION
 WAS REVISED TO REMOVE THE RESURFACING OF THE WADING
 POOL. REVISE THE SCOPE OF WORK ON THE OTHER SUBMITTAL
 DOCUMENTS TO MATCH THE APPLICATION. FBC 107.2.1
  
 4) SUBMIT TWO COPIES OF ALL DOCUMENTS FOR THE
 COMPONENTS TO BE INSTALLED. WPB AMEND. TO FBC SEC.
 107.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  

Review Stop Z ZONING
Rev No 2 Status P Date 2019-04-19 Cont ID  
Sent By mcruz Date 2019-04-19 Time 14:18 Rev Time 0.00
Received By mcruz Date 2019-04-19 Time 14:17 Sent To PC
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2019-02-25 Cont ID  
Sent By mcruz Date 2019-02-25 Time 13:54 Rev Time 0.00
Received By mcruz Date 2019-02-25 Time 13:53 Sent To PC
Notes
2019-02-25 13:54:28ZONING REVIEW FAILED, DUE TO THE FOLLOWING:
  
 1) A MINOR PD AMENDMENT WILL BE REQUIRED TO ADD
 ADDITIONAL MECHANICAL EQUIPMENT.
  
 FOR ADDITIONAL INFORMATION, THE ZONING AND LAND
 DEVELOPMENT REGULATIONS MAY BE VIEWED ONLINE AT
 WWW.MUNICODE.COM OR VISIT THE CITY OF WEST PALM BEACH
 PLANNING DEPARTMENT WEBSITE AT
 WWW.CITYOFWPB.COM/PLAN/INDEX.HTM.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE DO NOT HESITATE TO
 CONTACT ME. IF YOU WANT TO MEET IN PERSON TO GO OVER
 THE ABOVE COMMENTS, PLEASE CALL OR E-MAIL ME TO
 SCHEDULE AN APPOINTMENT.
  
 MAGGIE CRUZ
 ASSOCIATE PLANNER
 PLANNING AND ZONING DEPARTMENT
 TEL: 561-822-1442
 E-MAIL: [email protected]