| 2018-12-28 15:49:56 | 12/28/2018 1ST GAS REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. THE PLANS INDICATE AN EXISTING GAS METER. THE BTU |
| | LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED INTO THE |
| | TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE EXISTING |
| | SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE EXISTING |
| | SYSTEM MUST BE REDONE TO ENSURE A SAFE OPERATING |
| | SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM THAT SHOWS |
| | THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD OF EACH |
| | APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO EACH |
| | APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH OF |
| | PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE |
| | OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE |
| | EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE |
| | SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE |
| | REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES |
| | 2017 FBC FUEL GAS RES. SECS.G2412.4, G2412.8, G2413.1, |
| | G2413.2, G2413.3. |
| | |
| | 2. SUBMIT MANUFACTURER?S SPECIFICATION |
| | SHEETS/INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO |
| | VERIFY COMPLIANCE WITH 2017 FBC FUEL GAS RES. SEC. |
| | G2408.1. |
| | 3. TYPE OF GAS (LP OR NATURAL). WPB AMENDMENTS TO THE |
| | FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | 4. SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS. |
| | A LISTED SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY |
| | AHEAD OF EACH MP REGULATOR. 2017 FBC FUEL GAS RES. SEC. |
| | G2420.4. |
| | 5. GAS APPLIANCES SHALL BE LISTED AND LABELED. THE |
| | INSTALLATION MANUALS FOR ALL GAS APPLIANCES/EQUIPMENT |
| | SHALL BE ONSITE AT THE TIME OF INSPECTION 2017 FBC FUEL |
| | GAS RES. SEC. G2413.2 AND G2404.3. |
| | 6. LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL |
| | BTU LOAD ON THE SYSTEM. REFER TO THE |
| | 7. SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE |
| | PRESSURE REGULATORS. REGULATORS INSTALLED ON THE |
| | EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR |
| | INSTALLATION. 2017 FBC FUEL GAS RES. SEC. G2421.1. |
| | 8. SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO THE |
| | APPLIANCE. COMPLY WITH 2017 FBC FUEL GAS RES. SEC. |
| | TABLE G2413.4 (12) FOR THE PROPER PIPE SIZE AND BTU |
| | LOAD. |
| | 9. SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE |
| | LOCATION OF THE TANKLESS WATER HEATER AND THE LOCATION |
| | AND DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN |
| | RELATION TO THE WATER HEATER. THE LOCATION OF THE WATER |
| | HEATER SHALL COMPLY WITH THE MANUFACTURER'S |
| | INSTALLATION INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND |
| | DRAWN. WPB AMENDMENTS TO THE FBC SEC. 107.2.1. |
| | INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | 10. A SUB ELECTRICAL PERMIT IS REQUIRED FOR THE SOURCE |
| | OF IGNITION, WPB AMENDMENTS TO THE FBC SEC. 105.1 |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | 561-805-6720 |
| | |
| 2018-12-26 14:26:08 | PLUMB <5K |