Plan Review Details - Permit 18120691
Plan Review Stops For Permit 18120691
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-01-03 Cont ID  
Sent By tklarge Date 2019-01-03 Time 05:54 Rev Time 0.00
Received By tklarge Date 2019-01-03 Time 05:53 Sent To  
Notes
2019-01-03 05:53:291) SUBMIT TWO SETS OF PLANS THAT CLEARLYY REFLECT THE
 SCOPE OF WORK TO BE DONE. DESCRIBE THE SCOPE OF WORK ON
 THE PLANS. WPB AMEND. TO FBC SEC. 107.1.
 2) IS THE WALLBOARD BEING REPLACED IN THE SHOWERS? THE
 PLANS SHOW NOTHING. NO NOTES, NO DESCRIPTION OF WORK,
 ETC. IF SO, INDICATE ON THE PLANS WHAT TYPE OF MATERIAL
 IS BEING INSTALLED, ON WHICH WALLS ( ALL OF THEM?) ETC.
 THE PLANS ARE SO VAGUE A COMPREHENSIVE REVIEW CANNOT BE
 DONE.
 3) IS THE FLOOR TILE BEING REPLACED? INDICATE SO ON THE
 PLANS. IF SO, SUBMIT TWO COPIES OF THE MANUFACTURER'S
 SPECIFICATIONS/ TEST REPORTS FOR THE SUB-FLOOR
 SOUNDPROOFING MATERIAL.
 4) A SEPARATE PERMIT APPLICATION SHALL BE SUBMITTED FOR
 THE PLUMBING WORK BY A LICENSED PLUMBING CONTRACTOR AS
 A BUILDING CONTRACTOR IS NOT PERMITTED TO PERFORM THIS
 WORK PER FL. STATUTE 489.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-01-03 Cont ID  
Sent By tklarge Date 2019-01-03 Time 05:55 Rev Time 0.00
Received By tklarge Date 2018-12-18 Time 13:36 Sent To  
Notes
2019-01-02 07:09:041/2 ROUTED FROM ELEC BOX TO PLUMBING BOX
  
  
2018-12-19 13:36:59PLUMB <5K

Review Stop P PLUMBING
Rev No 1 Status F Date 2019-01-03 Cont ID  
Sent By tklarge Date 2019-01-03 Time 05:53 Rev Time 0.00
Received By tklarge Date 2019-01-03 Time 04:44 Sent To  
Notes
2019-01-03 05:44:011) SUBMIT TWO SETS OF PLANS THAT CLEARLYY REFLECT THE
 SCOPE OF WORK TO BE DONE. DESCRIBE THE SCOPE OF WORK ON
 THE PLANS. WPB AMEND. TO FBC SEC. 107.1.
 2) THE APPLICATION STATES THAT SHOWER TILES WILL BE
 REMOVED AND REPLACED IN UNITS #2,10,14, & 16. WHAT
 ABOUT THE SHOWER PANS? ARE THE SHOWER PANS BEING
 REPLACED? INDICATE SUCH ON BOTH SETS OF PLANS.WPB
 AMEND. TO FBC SEC. 107.2.1.
 3) IS THE WALLBOARD BEING REPLACED IN THE SHOWERS? THE
 PLANS SHOW NOTHING. NO NOTES, NO DESCRIPTION OF WORK,
 ETC. IF SO, INDICATE ON THE PLANS WHAT TYPE OF MATERIAL
 IS BEING INSTALLED, ON WHICH WALLS ( ALL OF THEM?) ETC.
 THE PLANS ARE SO VAGUE A COMPREHENSIVE REVIEW CANNOT BE
 DONE.
 4) IS THE FLOOR TILE BEING REPLACED? INDICATE SO ON THE
 PLANS. IF SO, SUBMIT TWO COPIES OF THE MANUFACTURER'S
 SPECIFICATIONS/ TEST REPORTS FOR THE SUB-FLOOR
 SOUNDPROOFING MATERIAL.
 5) SHOW THE LENGTH AND WIDTH DIMENSIONS OF THE SHOWER.
 COMPLY WITH 2017 FBC - PLUMBING SEC.417.4. THE
 SUBMITTED PRODUCT DESCRIPTION SHOWS A PREFABRICATED
 SHOWER BASE AND COMPARTMENT. PREFABRICATED UNITS SHALL
 CONFORM TO ASME A112.19.2/CSA B45.1 OR CSA B45.5/IAPMO
 Z124 PER 2017 FBC-PLUMBING SEC.417.1. SUBMIT TWO COPIES
 OF THE MANUFACTURER'S SPECIFICATIONS FOR THE ENTIRE
 UNIT. WPB AMEND. TO FBC SEC. 107.2.1.
 6) IS THE SHOWER VALVE BEING REPLACED? IF SO, SUBMIT
 MANUFACTURER'S SPECIFICATIONS FOR THE VALVE. THE VALVE
 SHALL CCOMPLY WITH 2017 FBC-PLUMBING SEC.424.3.
 7) ARE THE PLUMBING FIXTURES IN UNIT #16 BEING
 INSTALLED IN THE SAME EXISTING LOCATION OR WILL THERE
 BE REROUTING OF ANY WATER OR SANITARY LINES? CLEARLY
 INDICATE THIS ON THE PLANS.
 8) A SEPARATE PERMIT APPLICATION SHALL BE SUBMITTED FOR
 THE PLUMBING WORK BY A LICENSED PLUMBING CONTRACTOR AS
 A BUILDING CONTRACTOR IS NOT PERMITTED TO PERFORM THIS
 WORK PER FL. STATUTE 489.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved