| Plan Review Stops For Permit 18120386 |
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
P |
Date |
2019-01-14 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2019-01-14 |
Time |
13:31 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2019-01-14 |
Time |
13:31 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2019-01-14 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2019-01-14 |
Time |
13:31 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2019-01-14 |
Time |
13:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2019-01-04 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2019-01-04 |
Time |
07:22 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2019-01-02 |
Time |
13:02 |
Sent To |
|
|
| Notes |
| 2019-01-03 13:02:37 | RESUB ROUTED TO TKLARGE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2018-12-14 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2018-12-14 |
Time |
10:13 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2018-12-11 |
Time |
14:00 |
Sent To |
|
|
| Notes |
| 2018-12-12 14:00:44 | PLUMB<5K |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
4 |
Status |
P |
Date |
2019-01-15 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2019-01-15 |
Time |
13:46 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2019-01-15 |
Time |
13:46 |
Sent To |
|
|
| Notes |
| 2019-01-15 13:47:38 | APPROVED PLAN STAMPED BY TIM LARGE ON 1/14/19 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
F |
Date |
2019-01-04 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2019-01-04 |
Time |
07:22 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2019-01-04 |
Time |
06:22 |
Sent To |
|
|
| Notes |
| 2019-01-04 07:22:23 | THE CERTIFICATION THAT HAS BEEN SUBMITTED FROM IAPMO | | | FOR THE SHOWER EXPIRED AFTER JUNE 2018. SUBMIT A VALID | | | AND CURRENT CERTIFICATION. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2018-12-14 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2018-12-14 |
Time |
10:13 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2018-12-14 |
Time |
10:13 |
Sent To |
|
|
| Notes |
| 2018-12-14 10:13:53 | 1) THIS BUILDING WAS BUILT IN COMPLIANCE WITH THE | | | FEDERAL FAIR HOUSING ACT AND THE LEVEL OF ACCESSIBILITY | | | MUST BE MAINTAINED. A 30 INCH WIDE MINIMUM BY 48 INCH | | | DEEP MINIMUM CLEAR FLOOR SPACE MUST BE PROVIDED | | | ADJACENT TO THE SHOWER AND BEGINNING FLUSH WITH THE | | | CONTROL WALL OF THE SHOWER. SHOW THE REQUIRED CLEAR | | | FLOOR SPACE ON BOTH DRAWINGS. NO PLUMBING FIXTURES MAY | | | ENCROACH INTO THIS CLEAR FLOOR SPACE. | | | 2) THE EXISTING BACKING FOR FUTURE GRAB BARS SHALL NOT | | | BE REMOVED. | | | 3) SUBMIT MANUFACTURER'S SPCEIFICATIONS FOR THE FIRE | | | CAULKING TO BE USED. WPB AMEND. TO FBC SEC. 107.2.1. | | | 4) SUBMIT DETAILS AS TO HOW THE ACRYLIC WALL SYSTEM | | | WILL BE SECURED TO THE EXISTING TILE WALL.WPB AMEND. TO | | | FBC SEC. 107.2.1. IF AN ADHESIVE IS TO BE USED, SUBMIT | | | SPECIFICATIONS.WPB AMEND. TO FBC SEC. 107.2.1. | | | 5) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE | | | PREFABRICATED SHOWER BASE AND WALL SYSTEM. THE UNIT | | | SHALL COMPLY WITH 2017 FBC-PLUMBING SEC.417.1 AND ASME | | | A112.19/CSA B45.1 OR CSA B45.5/IAPMO Z 124. | | | 6) THE NEW SHOWER VALVE SHALL BE BALANCED PRESSURE, | | | THERMOSTATIC, OR COMBINATION | | | BALANCED-PRESSURE/THERMOSTATIC AND COMPLY WITH ASSE | | | 1016/ASME A112.1016/CSA B125. 16 OR ASME A112.18.1/CSA | | | B125.1 PER 2017 FBC PLUMBING SEC.424.3. | | | | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2018-12-14 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-12-14 |
Time |
10:16 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-12-14 |
Time |
09:46 |
Sent To |
I |
|
| Notes |
| 2018-12-14 10:03:36 | 1) THIS BUILDING WAS BUILT IN COMPLIANCE WITH THE | | | FEDERAL FAIR HOUSING ACT AND THE LEVEL OF ACCESSIBILITY | | | MUST BE MAINTAINED. A 30 INCH WIDE MINIMUM BY 48 INCH | | | DEEP MINIMUM CLEAR FLOOR SPACE MUST BE PROVIDED | | | ADJACENT TO THE SHOWER AND BEGINNING FLUSH WITH THE | | | CONTROL WALL OF THE SHOWER. SHOW THE REQUIRED CLEAR | | | FLOOR SPACE ON BOTH DRAWINGS. NO PLUMBING FIXTURES MAY | | | ENCROACH INTO THIS CLEAR FLOOR SPACE. | | | 2) THE EXISTING BACKING FOR FUTURE GRAB BARS SHALL NOT | | | BE REMOVED. | | | 3) SUBMIT MANUFACTURER'S SPCEIFICATIONS FOR THE FIRE | | | CAULKING TO BE USED. WPB AMEND. TO FBC SEC. 107.2.1. | | | 4) SUBMIT DETAILS AS TO HOW THE ACRYLIC WALL SYSTEM | | | WILL BE SECURED TO THE EXISTING TILE WALL.WPB AMEND. TO | | | FBC SEC. 107.2.1. IF AN ADHESIVE IS TO BE USED, SUBMIT | | | SPECIFICATIONS.WPB AMEND. TO FBC SEC. 107.2.1. | | | 5) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE | | | PREFABRICATED SHOWER BASE AND WALL SYSTEM. THE UNIT | | | SHALL COMPLY WITH 2017 FBC-PLUMBING SEC.417.1 AND ASME | | | A112.19/CSA B45.1 OR CSA B45.5/IAPMO Z 124. | | | 6) THE NEW SHOWER VALVE SHALL BE BALANCED PRESSURE, | | | THERMOSTATIC, OR COMBINATION | | | BALANCED-PRESSURE/THERMOSTATIC AND COMPLY WITH ASSE | | | 1016/ASME A112.1016/CSA B125. 16 OR ASME A112.18.1/CSA | | | B125.1 PER 2017 FBC PLUMBING SEC.424.3. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | | | | | | | |
|
|
|