Plan Review Details - Permit 18120174
Plan Review Stops For Permit 18120174
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-12-17 Cont ID  
Sent By jduprey Date 2018-12-17 Time 11:33 Rev Time 0.00
Received By jduprey Date 2018-12-17 Time 11:28 Sent To  
Notes
2018-12-17 11:32:52*PROVISO*
 1)PLEASE PROVIDE THE CONCRETE REPAIR PRODUCTS
 SUBMITTALS APPROVED BY THE ENGINEER BEFORE START THE
 CONCRETE REPAIRS.
  
 107.3.4.1 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS
 SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE
 PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE
 TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO
 THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD.
 DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR
 APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED
 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST.
  
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2018-12-14 Cont ID  
Sent By jduprey Date 2018-12-17 Time 11:35 Rev Time 0.00
Received By fmittner Date 2018-12-14 Time 10:14 Sent To B
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-12-17 Cont ID  
Sent By jduprey Date 2018-12-17 Time 11:35 Rev Time 0.00
Received By jduprey Date 2018-12-05 Time 14:50 Sent To HIST
Notes
2018-12-06 14:50:29BLDG <5K