Plan Review Details - Permit 18120060
Plan Review Stops For Permit 18120060
Review Stop G GAS REVIEW
Rev No 3 Status P Date 2019-01-14 Cont ID  
Sent By tklarge Date 2019-01-14 Time 09:45 Rev Time 0.00
Received By tklarge Date 2019-01-14 Time 09:45 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2019-01-10 Cont ID  
Sent By tklarge Date 2019-01-10 Time 05:27 Rev Time 0.00
Received By tklarge Date 2019-01-10 Time 04:51 Sent To I
Notes
2019-01-10 05:29:491) I AM CHALLENGING THE VALUATION OF THIS PERMIT.
 SUBMIT A COPY OF THE BONA FIDE CONTRACT/ WORK ORDER FOR
 THIS JOB. VALUATION SHALL INCLUDE THE COST OF OWNER
 SUPPLIED ITEMS. WPB AMEND. TO FBC SEC. 109.3.
 2) SHOW THE BTU LOAD OF THE WATER HEATER ON THE PLANS.
 3) A UNION IS REQUIRED WITHIN ONE FOOT UPSTREAM OR
 DOWNSTREAM OF THE REGULATOR. 2017 FBC- FUEL GAS SEC.
 4.10.2.
 4) A SHUTOFF VALVE IS REQUIRED IMMEDIATELY AHEAD OF THE
 MP REGULATOR. 2017 FBC-FUEL GAS SEC.409.4.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2018-12-18 Cont ID  
Sent By tklarge Date 2018-12-18 Time 13:31 Rev Time 0.00
Received By tklarge Date 2018-12-18 Time 10:22 Sent To I
Notes
2018-12-18 10:37:271) I AM CHALLENGING THE VALUATION OF THIS PERMIT.
 SUBMIT A COPY OF THE BONA FIDE CONTRACT/ WORK ORDER FOR
 THIS JOB. VALUATION SHALL INCLUDE THE COST OF OWNER
 SUPPLIED ITEMS. WPB AMEND. TO FBC SEC. 109.3.
 2) SUBMIT TWO COPIES OF THE MANUFACTURER'S
 SPECIFICATIONS FOR THE TANKLESS WATER HEATER AND THE
 COOKTOP. THE APPLIANCES SHALL BE LISTED AND LABELED PER
 2017 FBC-FUEL GAS SEC. 301.3. WPB AMEND. TO FBC SEC.
 107.1.
 3) SUBMIT TWO COPIES OF A FLOOR PLAN THAT CLEARLY SHOWS
 THE LOCATION OF THE WATER HEATER. IS IT BEING INSTALLED
 INSIDE OR OUTSIDE? IF INSTALLED OUTDOORS IT SHALL BE A
 MINIMUM OF 4 FEET FROM ANY BUILDING OPENINGS PER THE
 MANUF. INSTALLATION INSTRUCTIONS. IF INSTALLED INSIDE,
 PROVIDE DETAILS ON THE VENT, VENT LOCATION, HEIGHT
 ABOVE ROOF, ETC. INSTALLATION SHALL COMPLY WITH
 MANUFACTURER'S INSTALLATION MANUAL.
 4) SUBMIT TWO COPIES OF THE INSTALLATION INSTRUCTIONS
 FOR THE PRESSURE REGULATOR. WPB AMEND. TO FBC SEC.
 107.1.
 5) SHOW THE BTU LOAD OF THE WATER HEATER ON THE PLANS.
 6) A UNION IS REQUIRED WITHIN ONE FOOT UPSTREAM OR
 DOWNSTREAM OF THE REGULATOR. 2017 FBC- FUEL GAS SEC.
 4.10.2.
 7) A SHUTOFF VALVE IS REQUIRED IMMEDIATELY AHEAD OF THE
 MP REGULATOR. 2017 FBC-FUEL GAS SEC.409.4.
 8) THE DISTANCE OF 5 FEET FROM THE METER TO THE
 FURTHEST OUTLET SHALL BE VERIFIED. THIS DISTANCE DOES
 NOT SEEM CORRECT.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2019-01-14 Cont ID  
Sent By tklarge Date 2019-01-14 Time 09:45 Rev Time 0.00
Received By tklarge Date 2019-01-14 Time 09:45 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2019-01-10 Cont ID  
Sent By tklarge Date 2019-01-10 Time 05:30 Rev Time 0.00
Received By tklarge Date 2019-01-08 Time 15:36 Sent To  
Notes
2019-01-08 15:36:37RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-12-18 Cont ID  
Sent By tklarge Date 2018-12-18 Time 13:31 Rev Time 0.00
Received By tklarge Date 2018-12-04 Time 14:09 Sent To  
Notes
2018-12-05 14:09:21PLUMB <5K