| Plan Review Stops For Permit 18111241 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2019-03-15 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2019-03-15 |
Time |
07:44 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2019-03-15 |
Time |
07:43 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2018-12-19 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2018-12-19 |
Time |
18:17 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2018-12-19 |
Time |
18:17 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2019-03-19 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2019-03-19 |
Time |
11:40 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2019-03-07 |
Time |
13:20 |
Sent To |
|
|
| Notes |
| 2019-03-08 13:20:50 | RESUB ROUTED TO JLEAHY |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2018-12-27 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-12-27 |
Time |
14:42 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-11-30 |
Time |
13:03 |
Sent To |
|
|
| Notes |
| 2018-12-03 13:04:13 | ROUTED TO MECHANICAL INBOX |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2018-12-19 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2018-12-19 |
Time |
17:36 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2018-12-19 |
Time |
16:54 |
Sent To |
E |
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
N |
Date |
2019-04-02 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2019-04-02 |
Time |
10:03 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2019-04-02 |
Time |
10:03 |
Sent To |
|
|
| Notes |
| 2019-04-02 10:04:17 | NO PLUMBING IN SCOPE OF WORK. RREVISION REQUIRED FOR | | | REMOVED P SHEETS. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2019-03-19 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2019-03-19 |
Time |
11:40 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2019-03-19 |
Time |
05:26 |
Sent To |
I |
|
| Notes |
| 2019-03-19 11:40:37 | 1) THE SPECIFICATION SHEETS THAT HAVE BEEN SUBMITTED | | | FOR THE COMPRESSOR, THE DRYER, THE RECEIVER AND THE | | | FILTERS DO MATCH THE EQUIPMENT CALLED OUT FOR ON THE | | | PLANS. THE PLANS CALL OUT INGERSOLL-RAND EQUIPMENT BUT | | | THE SPECS ARE FOR KAESER AND CHAMPION EQUIPMENT. ALSO, | | | SEE SHT.P-1 UNDER THE "REMARKS" BOX. CLARIFY. | | | 2) SUBMIT MANUFACTURER'S SPECIFICATIONS AND | | | INSTALLATION MANUALS FOR THE OIL/WATER SEPARATOR, THE | | | PNEUMATIC NO-LOSS DRAIN, THE RECEIVER, THE DRYER AND | | | THE COMPRESSOR. WPB AMEND. TO FBC SEC. 107.2.1. | | | 3) ALL INFORMATION, DRAWINGS,SPECIFICATIONS AND | | | ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE OF | | | THE PERSON RESPONSIBLE FOR THE DESIGN. THE | | | MANUFACTURER'S SPECIFICATION SHEETS SHALL BE STAMPED BY | | | THE E.O.R. WPB AMEND. TO FBC SEC. 107.2.1. | | | 4) THE AIR PIPING ISOMETRIC ON SHT. P-3 SHOWS A 1 1/2 | | | INCH INLET AND OUTLET AT THE DRYER BUT A SIZE OF 1 INCH | | | IS CIRCLED ON THE TECHNICAL SPECIFICATION PAGE OF THE | | | DRYER SPECIFICATIONS. CLARIFY. | | | 5) A PRESSURE GAUGE AND THERMOMETER ARE REQUIRED ON THE | | | AIR COMPRESSOR PER SHT.P-1, NOTE #3. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2018-12-27 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2018-12-27 |
Time |
14:42 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2018-12-27 |
Time |
04:15 |
Sent To |
I |
|
| Notes |
| 2018-12-27 14:42:15 | 1) SUBMIT TWO COPIES OF MANUFACTURER'S SPECIFICATIONS | | | AND INSTALLATION MANUAL FOR THE COMPRESSOR AND OTHER | | | SYSTEM COMPONENTS. WPB AMEND. TO FBC SEC. 107.2.1. | | | 2) SHT. P-3 - IDENTIFY ALL SYSTEM COMPONENTS ON THE CEP | | | BUILDING - NEW AIR COMPRESSOR PLAN, INCLUDING THE | | | EXISTING. WPB AMEND. TO FBC SEC. 107.2.1. | | | 3) SHT. E-1 - PROVIDE THE UL ASSEMBLY NUMBER FOR THE 2 | | | HOUR FIRE RATED FIRESTOP SYSTEM FOR MULTIPLE METAL PIPE | | | THROUGH CONCRETE WALLS. THERE IS NO UL ASSEMBLY NUMBER | | | ON THE DETAIL. | | | 4) SUBMIT A COMPRESSED AIR PIPING RISER FOR ANY NEW | | | PIPING TO BE ADDED. SHOW THE REQUIRED THERMOMETER AND | | | PRESSURE GAUGE ON THE DISCHARGE PIPING FROM EACH AIR | | | COMPRESSOR AND RECEIVER PER THE SPECIFICATIONS ON SHT. | | | P-1. SHOW ALL REQUIRED VALVES PER THE SPECIFICATIONS. | | | WPB AMEND. TO FBC SEC. 107.2.1. | | | 5) SUBMIT ADDITIONAL INFORMATION FOR THE ANCHORING OF | | | THE COMPRESSOR TO THE SLAB/PAD. THE PLANS CALL OUT 5/8" | | | BOLTS. INDICATE THE LENGTH OF THE BOLTS AND TORQUING | | | REQS. FOR THE BOLTS. WPB AMEND. TO FBC SEC. 107.2.1. | | | 6) SHT. P-4 - SOME OF THE PRINTING ON THE DETAILS IS SO | | | SMALL IT IS ILLEGIBLE. SUBMIT DETAILS WHERE THE THE | | | NOTES ARE LEGIBLE. WPB AMEND. TO FBC SEC. 107.2.1. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|
|
|